Alberta Gazette, Part I — Monday, September 15, 2008
Monday, September 15, 2008
Alberta — Gazette
The Alberta Gazette
Part I
Vol. 104 Edmonton, Monday, September 15, 2008 No. 17
RESIGNATIONS & RETIREMENTS
(Justice of the Peace Act)
Resignation of Sitting Justice of the Peace
August 18, 2008
Mozeson, Laurie of Edmonton
_______________
Resignation / Termination of Justice of the Peace
June 30, 2008
Copeland, Brenda of Edmonton
August 21, 2008
Munroe, Shelley Lynn of Daysland
Ell, Randall of Calgary
GOVERNMENT NOTICES
Agriculture and Rural Development
Form 15
(Irrigation Districts Act)
(Section 88)
Notice to Irrigation Secretariat:
Change of Area of an Irrigation District
On behalf of the Western Irrigation District, I hereby request that the Irrigation
Secretariat forward a certified copy of this notice to the Registrar for Land Titles for
the purposes of registration under
Section 22 of the Land Titles Act and arrange for
notice to be published in the Alberta Gazette.
The following parcels of land should be removed from the irrigation district and the
notation removed from the certificate of title:
LINC Number
Short Legal Description
Title Number
0027 565 037
9812130;3;37
981 307 208
I certify the procedures required under
part 4 of the Irrigation Districts Act have been
completed and the area of the Western Irrigation District should be changed
according to the above list.
Len Ring, Director,
Irrigation Secretariat.
Culture and Community Spirit
Hosting Expenses Exceeding $600.00
for the period April 1, to June 30, 2008
Function: Government House Foundation Appreciation Luncheon
Date: June 6, 2008
Amount: $2,429.90
Purpose: To provide a recognition luncheon for the government staff for helping the
Government House Foundation throughout the year
Location: Government House, Edmonton, AB
BU#: 031A
Education
Ministerial Order (#018/2008)
(School Act)
I, Dave Hancock, Q.C., Minister of Education, pursuant to Sections 219 and 220
of the School Act, make the Order in the attached Appendix, being The Diamond
Valley Roman Catholic Separate School District No. 679 Establishment Order.
Dated at Edmonton, Alberta, July 3, 2008.
Dave Hancock, Q.C., Minister.
APPENDIX
The Diamond Valley Roman Catholic Separate School District No. 679
Establishment Order
1 Pursuant to Sections 219 and 220 of the School Act, The Diamond Valley
Roman Catholic Separate School District No. 679 is established.
2 The Diamond Valley Roman Catholic Separate School District No. 679 shall be
comprised of the following lands, which are included in The Diamond Valley
School District No. 2154 and which are properly assessable for separate school
purposes under the provision of Sections 153 to 160 of the School Act:
Township 37, Range 3, West of the 5th Meridian
Sections 29 to 33 inclusive; North half and Southwest quarter of
Section 34.
Township 38, Range 3, West of the 5th Meridian
Sections 3 to 10 inclusive; Sections 15 to 18 inclusive.
Ministerial Order (#019/2008)
(School Act)
I, Dave Hancock, Q.C., Minister of Education, pursuant to
Section 239 of the
School Act, make the Order in the attached Appendix, being The Rocky Mountain
House Roman Catholic Separate School District No. 131 (The Red Deer Catholic
Regional Division No. 39 - Rocky Mountain House Ward) Boundary Adjustment
Order.
Dated at Edmonton, Alberta, July 3, 2008.
Dave Hancock, Q.C., Minister.
APPENDIX
The Rocky Mountain House Roman Catholic Separate School District No. 131
(The Red Deer Catholic Regional Division No. 39 - Rocky Mountain House
Ward) Boundary Adjustment Order
1 Pursuant to
Section 239 of the School Act, all of the lands are taken from the
following district and are added to The Rocky Mountain House Roman Catholic
Separate School District No. 131:
The Diamond Valley Roman Catholic Separate School District No. 679.
2 Pursuant to
Section 239 of the School Act, the following school district is
dissolved:
The Diamond Valley Roman Catholic Separate School District No. 679.
3 The Rocky Mountain House Roman Catholic Separate School District No. 131
(Rocky Mountain House Ward - The Sylvan Lake Electoral Subdivision) shall be
comprised of the following lands:
Township 31, Range 28, West of the 4th Meridian
Sections 18 and 19; Sections 30 and 31; North half of
Section 7.
Township 31, Range 29, West of the 4th Meridian
Sections 13, 24, 25, and 36; Portions of Sections 14, 23, 26, and 35; North half of
Section 12; Portions of the North half of
Section 11.
Township 32, Range 28, West of the 4th Meridian
Sections 1 to 12 inclusive; Sections 14 to 22 inclusive; Sections 26 to 34
inclusive; South halves and Northwest quarters of Sections 23 and 35.
Township 32, Range 29, West of the 4th Meridian
Section 1; Sections 12 and 13; Sections 24 and 25;
Section 36; Portions of
Sections 2, 11, 14, 23, 26, and 35.
Township 33, Range 27, West of the 4th Meridian
Southwest quarter of
Section 31.
Township 33, Range 28, West of the 4th Meridian
Sections 3 to 11 inclusive; Sections 13 to 36 inclusive; North half and Southwest
quarter of
Section 2.
Township 33, Range 29, West of the 4th Meridian
Section 1; Sections 12 and 13; Sections 24 and 25;
Section 36; Portions of
Sections 2, 11, 14, 23, 26, and 35.
Township 34, Range 26, West of the 4th Meridian
Sections 31 to 35 inclusive; North halves of Sections 29 and 30.
Township 34, Range 27, West of the 4th Meridian
Sections 30 and 31; Sections 34 to 36 inclusive; North halves of Sections 25, 26,
and 27.
Township 34, Range 28, West of the 4th Meridian
Sections 25 to 28 inclusive; Sections 31 to 36 inclusive.
Township 34, Range 29, West of the 4th Meridian
Section 36; Portions of Sections 2, 11, 14, 23, and 26; Southwest quarter of
Section 25; Portions of
Section 35.
Township 35, Range 25, West of the 4th Meridian
Sections 27 to 33 inclusive; North half of
Section 34.
Township 35, Range 26, West of the 4th Meridian
Sections 1 to 36 inclusive.
Township 35, Range 27, West of the 4th Meridian
Sections 1 to 36 inclusive.
Township 35, Range 28, West of the 4th Meridian
Sections 1 to 36 inclusive.
Township 36, Range 25, West of the 4th Meridian
Sections 2 to 10 inclusive.
Township 36, Range 26, West of the 4th Meridian
Sections 1 to 11 inclusive; Sections 17 to 19 inclusive; South halves and
Northwest quarters of Sections 12 and 16; South halves of Sections 14 and 15;
West half of
Section 20.
Township 36, Range 27, West of the 4th Meridian
Sections 1 to 21 inclusive;
Section 24; East half of
Section 23.
Township 36, Range 28, West of the 4th Meridian
Sections 1 to 6 inclusive; Sections 8 to 22 inclusive;
Section 24; Sections 28 and
29; Sections 31 and 32; West half of
Section 27; Those portions of Sections 7
and 30 lying West of the Red Deer River.
Township 37, Range 28, West of the 4th Meridian
Sections 6 and 7; Sections 17 to 19 inclusive; Those portions of Sections 5, 8, 9,
15, and 16 lying West of the Red Deer River; South half of
Section 20;
Southwest quarter of
Section 21.
Township 38, Range 28, West of the 4th Meridian
Southwest quarter of
Section 7; That portion of the Southwest quarter of
Section
30 not included in the Cygnet Lake.
Township 39, Range 28, West of the 4th Meridian
Portions of Sections 5 and 8.
Township 31, Range 1, West of the 5th Meridian
Sections 6 and 7; Sections 13 to 36 inclusive; West half and Northeast quarter of
Section 8; East half of
Section 11; North half of
Section 12.
Township 31, Range 2, West of the 5th Meridian
Sections 1 and 2; Sections 11 to 14 inclusive; Sections 23 to 36 inclusive;
Northeast quarter of
Section 22.
Township 31, Range 3, West of the 5th Meridian
Section 13; Sections 15 and 16; Sections 21 to 28 inclusive; Sections 33 to 36
inclusive; North half and Southwest quarter of
Section 14.
Township 32, Range 1, West of the 5th Meridian
Sections 1 to 36 inclusive.
Township 32, Range 2, West of the 5th Meridian
Sections 1 to 36 inclusive.
Township 32, Range 3, West of the 5th Meridian
Sections 1 to 4 inclusive; Sections 9 to 16 inclusive; Sections 21 to 28 inclusive;
Sections 33 to 36 inclusive.
Township 33, Range 1, West of the 5th Meridian
Sections 1 to 36 inclusive.
Township 33, Range 2, West of the 5th Meridian
Sections 1 to 36 inclusive.
Township 33, Range 3, West of the 5th Meridian
Sections 1 to 4 inclusive; Sections 10 to 15 inclusive; Sections 22 to 27 inclusive;
Sections 34 to 36 inclusive; East halves of Sections 9, 16, 21, and 33.
Township 34, Range 1, West of the 5th Meridian
Sections 1 to 3 inclusive; Sections 10 to 15 inclusive; Sections 22 to 27 inclusive;
Sections 31 to 36 inclusive; Northeast quarter of
Section 16; South half of
Section 21.
Township 34, Range 2, West of the 5th Meridian
Sections 2 to 10 inclusive.
Township 34, Range 3, West of the 5th Meridian
Sections 1 to 3 inclusive; Sections 10 to 12 inclusive; East halves of Sections 4
and 9.
Township 35, Range 1, West of the 5th Meridian
Sections 1 to 6 inclusive; Sections 8 to 17 inclusive; Sections 20 to 29 inclusive;
Sections 32 to 36 inclusive.
Township 36, Range 1, West of the 5th Meridian
Sections 1 to 5 inclusive; Sections 7 to 29 inclusive; Sections 32 to 36 inclusive;
East half and Southwest quarter of
Section 30; Southeast quarter of
Section 31.
Township 36, Range 2, West of the 5th Meridian
East half of
Section 13; Southeast quarter of
Section 24; That portion of the East
half of
Section 12 lying North of the Red Deer River; North halves of Sections
32, 33, and 34; Northwest quarter of
Section 35.
Township 36, Range 3, West of the 5th Meridian
Sections 5 to 8 inclusive; Sections 17 to 20 inclusive; Sections 29 and 30.
Township 36, Range 4, West of the 5th Meridian
Sections 1 to 3 inclusive; Sections 11 to 14 inclusive; Sections 23 to 26 inclusive;
East halves of Sections 10, 15, and 22.
Township 37, Range 1, West of the 5th Meridian
Sections 1 to 4 inclusive; Sections 7 to 36 inclusive.
Township 37, Range 2, West of the 5th Meridian
Sections 1 to 5 inclusive; Sections 8 to 17 inclusive; Sections 21 to 29 inclusive;
Sections 32 to 36 inclusive; North half and Southeast quarter of
Section 20.
Township 37, Range 3, West of the 5th Meridian
Sections 29 to 33 inclusive; North half and Southwest quarter of
Section 34.
Township 38, Range 1, West of the 5th Meridian
Sections 1 to 10 inclusive; Sections 15 to 23 inclusive; Sections 28 to 31
inclusive;
Section 36; Those portions of Sections 11, 12, and 14 lying South and
West of the Cygnet Lake; Those portions of Sections 32 and 33 lying South of
the Sylvan Lake; Those portions of Sections 24, 25, 26, 27, 34, and 35 not
included in the Cygnet Lake.
Township 38, Range 2, West of the 5th Meridian
Sections 1 to 36 inclusive.
Township 38, Range 3, West of the 5th Meridian
Sections 1 to 18 inclusive; Sections 24 and 25; Sections 35 and 36; South half
and Northeast quarter of
Section 23; Those portions of the Northeast quarters of
Sections 26 and 34 lying North of the Medicine River; That portion of the
Northwest quarter of
Section 26 lying North of the Medicine River.
Township 39, Range 1, West of the 5th Meridian
Sections 1 to 3; Sections 10 to 12 inclusive; Sections 14 to 16 inclusive; Sections
20 to 23 inclusive; Sections 26 to 35 inclusive; West halves of Sections 13, 24,
25, and 36; That portion of the Southeast quarter of
Section 4 lying South and
East of the Sylvan Lake; Those portions of Sections 5 and 6 lying West of the
Sylvan Lake; Those portions of Sections 8, 9, 17, 18, and 19 lying North and
East of the Sylvan Lake.
Township 39, Range 2, West of the 5th Meridian
Sections 1 to 10 inclusive; Sections 16 to 21 inclusive;
Section 25; Sections 28 to
32 inclusive; Sections 35 and 36; Those portions of Sections 11, 12, 13, 14, and
15 lying South and West of the Sylvan Lake; Those portions of Sections 24, 26,
27, and 34 lying North and East of the Sylvan Lake; That portion of
Section 33
not included in the Sylvan Lake.
Township 39, Range 3, West of the 5th Meridian
Section 1;
Section 13; Sections 24 and 25;
Section 36; South half and Northeast
quarter of
Section 12; South half of the Southeast quarter of
Section 26.
Township 40, Range 1, West of the 5th Meridian
Sections 2 to 6 inclusive; Southeast quarter of
Section 8.
Township 40, Range 2, West of the 5th Meridian
Sections 1 to 5 inclusive; Sections 8 to 11 inclusive; South half of
Section 6;
Southwest quarter of
Section 12.
Ministerial Order (#020/2008)
(School Act)
I, Dave Hancock, Q.C., Minister of Education, pursuant to
Section 239 of the
School Act, make the Order in the attached Appendix, being The Penhold School
District No. 214 (The Chinook's Edge School Division No. 73) Boundary Adjustment
Order.
Dated at Edmonton, Alberta, July 3, 2008.
Dave Hancock, Q.C., Minister.
APPENDIX
The Penhold School District No. 214
(The Chinook's Edge School Division No. 73)
Boundary Adjustment Order
1 Pursuant to
Section 239 of the School Act, all of the lands are taken from the
following school district and are added to The Penhold School District No. 214:
The Diamond Valley School District No. 2154
2 Pursuant to
Section 239 of the School Act, the following school district is
dissolved:
The Diamond Valley School District No. 2154
3 The Penhold School District No. 214 shall be comprised of the following lands:
Township 34, Range 26, West of the 4th Meridian
Sections 31 to 35 inclusive; North halves of Sections 29 and 30.
Township 34, Range 27, West of the 4th Meridian
Sections 30 and 31; Sections 34 to 36 inclusive; North halves of Sections 25, 26,
and 27.
Township 34, Range 28, West of the 4th Meridian
Sections 25 to 28 inclusive; Sections 31 to 36 inclusive.
Township 34, Range 29, West of the 4th Meridian
Section 36; Portions of Sections 2, 11, 14, 23, 26, and 35; Southwest quarter of
Section 25.
Township 35, Range 25, West of the 4th Meridian
Sections 27 to 33 inclusive; North half of
Section 34.
Township 35, Range 26, West of the 4th Meridian
Sections 1 to 36 inclusive.
Township 35, Range 27, West of the 4th Meridian
Sections 1 to 36 inclusive.
Township 35, Range 28, West of the 4th Meridian
Sections 1 to 36 inclusive.
Township 36, Range 25, West of the 4th Meridian
Sections 2 to 10 inclusive; Sections 17 to 20 inclusive; Sections 29 to 33
inclusive; West halves of Sections 16, 21, and 28.
Township 36, Range 26, West of the 4th Meridian
Sections 1 to 36 inclusive.
Township 36, Range 27, West of the 4th Meridian
Sections 1 to 36 inclusive.
Township 36, Range 28, West of the 4th Meridian
Sections 1 to 6 inclusive; Sections 8 to 36 inclusive; That portion of
Section 7
lying West of the Red Deer River.
Township 37, Range 25, West of the 4th Meridian
Sections 4 to 9 inclusive; Sections 14 to 23 inclusive; Sections 26 to 35 inclusive;
West half of
Section 13; West halves of Sections 24, 25, and 36.
Township 37, Range 26, West of the 4th Meridian
Sections 1 to 36 inclusive.
Township 37, Range 27, West of the 4th Meridian
Sections 1 to 32 inclusive; Sections 35 and 36; South half of
Section 33.
Township 37, Range 28, West of the 4th Meridian
Sections 1 to 7 inclusive; Sections 9 to 15 inclusive; Sections 17 to 36 inclusive;
Those portions of Sections 8 and 16 lying West of the Red Deer River.
Township 38, Range 25, West of the 4th Meridian
Sections 4 to 8 inclusive; Those portions of Sections 2, 3, 9, and 18 and that
portion of the West half of
Section 1 lying South of the Red Deer River.
Township 38, Range 26, West of the 4th Meridian
Sections 1 to 12 inclusive; Sections 14 to 20; Sections 30 and 31; Those portions
of Sections 13, 21, 22, 23, 24, 29, and 32 lying Southwest of the Red Deer River.
Township 38, Range 27, West of the 4th Meridian
Sections 1, 6, 7, 12, 13, 24, 25, 35, and 36; North half and Southeast quarter of
Section 26; East half of
Section 2; That portion of the Southeast quarter of
Section 5 lying South of Highway 2 as shown on Road Plan 2082 L.Z.;
Southwest quarter and that portion of the Northwest quarter of
Section 5 lying
South and West of the North limit of Road Plan 2082 L.Z.; Portions of Sections
18 and 19 lying South of the Red Deer River.
Township 38, Range 28, West of the 4th Meridian
Sections 1 to 12 inclusive; Sections 14 to 18 inclusive; Sections 21 to 23
inclusive; Sections 25 to 36 inclusive; That portion of
Section 13 lying West of
the East limit of Road Plan 2082 L.Z. and North of the Red Deer River; Those
portions of Sections 19 and 20 not covered by the waters of the Cygnet Lake;
That portion of
Section 24 lying West of the East limit of Road Plan 2082 L.Z.
Township 39, Range 26, West of the 4th Meridian
Sections 5 to 8 inclusive; Those portions of Sections 4 and 9 lying West of the
Red Deer River; Those portions of Sections 17 and 18 lying South of the Red
Deer River.
Township 39, Range 27, West of the 4th Meridian
Section 1; Sections 4 to 6 inclusive; Sections 8 to 12 inclusive; That portion of
Section 2 lying North of the Red Deer River; Those portions of
Section 7 and
portions of Sections 13 to 18 inclusive lying South of the Blindman River; North
half, Southwest quarter and that portion of the Southeast quarter of
Section 3
lying West of the Red Deer River.
Township 39, Range 28, West of the 4th Meridian
Sections 1 to 4 inclusive; Sections 9 to 11 inclusive; Portions of Sections 5 and 8;
Those portions of Sections 12 to 14 inclusive lying South of the Blindman River.
Township 34, Range 1, West of the 5th Meridian
Sections 1 to 3 inclusive; Sections 10 to 15 inclusive; Sections 22 to 27 inclusive;
Sections 31 to 36 inclusive; Northeast quarter of
Section 16; South half of
Section 21.
Township 35, Range 1, West of the 5th Meridian
Sections 1 to 6 inclusive; Sections 8 to 17 inclusive; Sections 20 to 29 inclusive;
Sections 32 to 36 inclusive.
Township 36, Range 1, West of the 5th Meridian
Sections 1 to 5 inclusive; Sections 7 to 29 inclusive; Sections 32 to 36 inclusive;
East half and Southwest quarter of
Section 30; Southeast quarter of
Section 31.
Township 36, Range 2, West of the 5th Meridian
East half of
Section 13; Southeast quarter of
Section 24; That portion of the East
half of
Section 12 lying North of the Red Deer River; North halves of Sections
32, 33, and 34; Northwest quarter of
Section 35.
Township 36, Range 3, West of the 5th Meridian
Sections 5 to 8 inclusive; Sections 17 to 20 inclusive; Sections 29 and 30.
Township 36, Range 4, West of the 5th Meridian
Sections 1 to 3 inclusive; Sections 11 to 14 inclusive; Sections 23 to 26 inclusive;
East halves of Sections 10, 15, and 22.
Township 37, Range 1, West of the 5th Meridian
Sections 1 to 4 inclusive; Sections 7 to 36 inclusive.
Township 37, Range 2, West of the 5th Meridian
Sections 1 to 5 inclusive; Sections 8 to 17 inclusive; Sections 21 to 36 inclusive;
North half and Southeast quarter of
Section 20.
Township 37, Range 3, West of the 5th Meridian
Sections 29 to 33 inclusive; North half and Southwest quarter of
Section 34.
Township 38, Range 1, West of the 5th Meridian
Sections 1 to 10 inclusive; Sections 15 to 23 inclusive; Sections 28 to 31
inclusive;
Section 36; Those portions of Sections 11, 12, and 14 lying South and
West of the Cygnet Lake; Those portions of Sections 32 and 33 lying South of
Sylvan Lake; Those portions of Sections 24, 25, 26, 27, 34, and 35 not included
in the Cygnet Lake.
Township 38, Range 2, West of the 5th Meridian
Sections 1 to 28 inclusive; Sections 33 to 36 inclusive.
Township 38, Range 3, West of the 5th Meridian
Sections 1 to 18 inclusive;
Section 24 and 25;
Section 36; South half and
Northeast quarter of
Section 23; That portion of the North half of
Section 26
lying North of the Medicine River; That portion of the Northeast quarter of
Section 34 lying North of the Medicine River; That portion of
Section 35 lying
North and East of the Medicine River.
Township 39, Range 1, West of the 5th Meridian
Sections 1 to 3 inclusive; Sections 10 to 12 inclusive; That portion of the
Southeast quarter of
Section 4 lying South and East of the Sylvan Lake; Those
portions of Sections 5 and 6 lying West of Sylvan Lake; That portion of
Section
9 lying North and East of the Sylvan Lake.
Township 39, Range 2, West of the 5th Meridian
Section 1; South halves of Sections 2 to 4 inclusive; Those portions of Sections
12 and 13 lying South and West of the Sylvan Lake; South half of
Section 5;
Southeast quarter of
Section 6.
Ministerial Order (#021/2008)
(School Act)
I, Dave Hancock, Q.C., Minister of Education, pursuant to Sections 219 and 220
of the School Act, make the Order in the attached Appendix, being The Looma
Roman Catholic Separate School District No. 680 Establishment Order.
Dated at Edmonton, Alberta, July 3, 2008.
Dave Hancock, Q.C., Minister.
APPENDIX
The Looma Roman Catholic Separate School District No. 680
Establishment Order
1 Pursuant to Sections 219 and 220 of the School Act, The Looma Roman Catholic
Separate School District No. 680 is established.
2 The Looma Roman Catholic Separate School District No. 680 shall be comprised
of the following lands which are included in The Looma School District
No. 4321 and which are properly assessable for separate school purposes under
the provisions of Sections 153 to 160 of the School Act:
Township 50, Range 22, West of the 4th Meridian
Southwest quarter of
Section 30.
Township 50, Range 23, West of the 4th Meridian
Sections 25 and 26; Sections 34 to 36 inclusive; North half and Southwest
quarter of
Section 24; East halves of Sections 23 and 33; Northeast quarter of
Section 27.
Ministerial Order (#022/2008)
(School Act)
I, Dave Hancock, Q.C., Minister of Education, pursuant to
Section 239 of the
School Act, make the Order in the attached Appendix, being The Leduc Roman
Catholic Separate School District No. 132 (The St. Thomas Aquinas Roman Catholic
Separate Regional Division No. 38 - Leduc Ward) Boundary Adjustment Order.
Dated at Edmonton, Alberta, July 3, 2008.
Dave Hancock, Q.C., Minister.
APPENDIX
The Leduc Roman Catholic Separate School District No. 132
(The St. Thomas Aquinas Roman Catholic Separate Regional Division No. 38 -
Leduc Ward) Boundary Adjustment Order
1 Pursuant to
Section 239 of the School Act, all of the lands are taken from the
following school district and are added to The Leduc Roman Catholic Separate
School District No. 132:
The Looma Roman Catholic Separate School District No. 680
2 Pursuant to
Section 239 of the School Act, the following school district is
dissolved:
The Looma Roman Catholic Separate School District No. 680
3 The Leduc Roman Catholic Separate School District No. 132 (Leduc Ward - The
Beaumont Electoral Subdivision No. 2) shall be comprised of the following
lands:
Township 49, Range 24, West of the 4th Meridian
Sections 34 and 35; North half of
Section 36; Those portions of Sections 27, 28,
and 33 lying North and East of the Black Mud Lake.
Township 50, Range 22, West of the 4th Meridian
Southwest quarter of
Section 30.
Township 50, Range 23, West of the 4th Meridian
Sections 25 and 26; Sections 34 to 36 inclusive; South half and Northwest
quarter of
Section 6; North half and Southwest quarter of
Section 24; East halves
of Sections 23 and 33; Northeast quarter of
Section 27; Northwest quarter of
Section 30; West half of
Section 31.
Township 50, Range 24, West of the 4th Meridian
Sections 1 to 4 inclusive; Sections 8 to17 inclusive; Sections 21 to 29 inclusive;
Sections 32 to 36 inclusive; East half of
Section 5; South half and Northeast
quarter of
Section 20; Northeast quarter of
Section 30.
Township 51, Range 23, West of the 4th Meridian
Sections 5 to 8 inclusive.
Township 51, Range 24, West of the 4th Meridian
Sections 1 to 4 inclusive; Sections 9 to 12 inclusive.
Ministerial Order (#023/2008)
(School Act)
I, Dave Hancock, Q.C., Minister of Education, pursuant to
Section 239 of the
School Act, make the Order in the attached Appendix, being The Leduc School
District No. 297 (The Black Gold Regional Division No. 18) Boundary Adjustment
Order.
Dated at Edmonton, Alberta, July 3, 2008.
Dave Hancock, Q.C., Minister.
APPENDIX
The Leduc School District No. 297
(The Black Gold Regional Division No. 18)
Boundary Adjustment Order
1 Pursuant to
Section 239 of the School Act, all of the land is taken from the
following school district and are added to The Leduc School District No. 297:
The Looma School District No. 4321
2 Pursuant to
Section 239 of the School Act, the following school district is
dissolved:
The Looma School District No. 4321
3 The Leduc School District No. 297 shall be comprised of the following lands:
Township 49, Range 24, West of the 4th Meridian
Sections 30, 31, 34, and 35; West half of
Section 19 lying South of the South
boundary of Plan 904 N.Y.; Those portions of Sections 27, 28, and 33 lying
North and East of the Black Mud Lake; North half of
Section 36.
Township 49, Range 25, West of the 4th Meridian
Sections 13 and 14; Sections 23 to 27 inclusive; Sections 34 to 36 inclusive; East
halves of Sections 15, 22, 28, and 33.
Township 50, Range 22, West of the 4th Meridian
Southwest quarter of
Section 30.
Township 50, Range 23, West of the 4th Meridian
Sections 25 and 26; Sections 34 to 36 inclusive; South half and Northwest
quarter of
Section 6; North half and Southwest quarter of
Section 24; East halves
of Sections 23 and 33; Northeast quarter of
Section 27; Northwest quarter of
Section 30; West half of
Section 31.
Township 50, Range 24, West of the 4th Meridian
Sections 1 to 4; Sections 6 to 36 inclusive; East half of
Section 5.
Township 50, Range 25, West of the 4th Meridian
Sections 1 to 3 inclusive; Sections 9 to 17 inclusive; Sections 19 to 36 inclusive;
North half and Southeast quarter of
Section 18.
Township 50, Range 26, West of the 4th Meridian
Sections 24 and 25;
Section 36; Northeast quarter of
Section 13.
Township 51, Range 23, West of the 4th Meridian
Sections 5 to 8 inclusive.
Township 51, Range 24, West of the 4th Meridian
Sections 1 to 12 inclusive.
Township 51, Range 25, West of the 4th Meridian
Sections 1 to 4 inclusive; Sections 9 to 12 inclusive; Those portions of Sections
5, 6, 7, and 8 lying South and East of the North Saskatchewan River.
Township 51, Range 26, West of the 4th Meridian
That portion of
Section 1 lying East of the North Saskatchewan River.
Environment
Code of Practice for Land Treatment of Soil Containing Hydrocarbons
(made under the Environmental Protection and Enhancement Act, RSA
2000, c.E-12 as amended and Waste Control Regulation (AR 192/96) as
amended)
Effective September 15, 2008.
TABLE OF CONTENTS
Part
Definitions
General Requirements
2.1
General
2.2
Analytical Requirements
2.3
Classification of Registered Site
Registration Application/Administration Requirements
3.1
Registration
3.2
Written Consent of Registered Owners
Site and Design Requirements
Operational Requirements
5.1
General Operating Requirements
5.2
Monitoring Requirements for a Class I Registered Site
Decommissioning and Closure Requirements
Reporting Requirements
7.1
Contravention Reporting
Record Keeping Requirements
Code of Practice Administration
Schedule 1
Registration Information
PART 1:
DEFINITIONS
1.1.1 All
definitions in the Act and the regulations apply except where expressly
defined in this Code of Practice.
1.2 In this Code of Practice:
(a) "Act" means the Environmental Protection and Enhancement Act,
R.S.A. 2000, c. E-12, as amended;
(b) "barrier" means a continuous layer of low permeability material,
either synthetic or compacted fine-grained soil, constructed as the base
of a land cell to restrict downward movement of contaminants;
(c) "berm" means an earthen embankment constructed around each land
cell;
(d) "coarse-grained soil" means soil that has a median grain size greater
than seventy-five (75) micrometres, determined in accordance with the
Standard Test Method for Particle-Size Analysis of Soils, published by
the American Society for Testing and Materials, Test Method D422-
63, 1998, as amended;
(e) "cm/s" means centimetres per second;
(f) "cultivate" means till, turn, or mix;
(g) "down-gradient" means in the primary lateral direction of
groundwater flow;
(h) "F1", "F2", "F3", or "F4" means the specific hydrocarbon fraction
measured by the analytical methods described in the Reference Method
for the Canada-Wide Standard for Petroleum Hydrocarbons in Soil -
Tier 1 Method, published by the Canadian Council of Ministers of the
Environment, 2001, as amended;
(i) "fine-grained soil" means soil that has a median grain size less than or
equal to seventy-five (75) micrometres, determined in accordance with
the Standard Test Method for Particle-Size Analysis of Soils, published
by the American Society for Testing and Materials, Test Method
D422-63, 1998, as amended;
(j) "in situ" means in the natural or original position or place;
(k) "ISO 17025" means the international standard, developed and
published by International Organization for Standardization (ISO),
specifying the management and technical requirements for laboratories
to demonstrate their technical competence to perform defined tests and
produce valid data and results;
(l) "land cell" means a specific designated portion of a registered site on
which the land treatment of SCH is, was or will be carried on;
(m) "mg/kg" means milligrams per kilogram;
(n) "mg/L" means milligrams per litre;
(o) "one source" means a single location from which SCH that is land
treated has been generated;
(p) "registered site" means the particular land for which a registration has
been issued under the Act for the land treatment of SCH;
(q) "registration holder" means a person who has been issued a
registration under the Act and the regulations;
(r) "regulations" means the regulations under the Act;
(s) "representative groundwater sample" means a groundwater sample
that represents the in situ groundwater;
(t) "run-off" means any rainwater or meltwater that drains as surface
flow from a land cell;
(u) "SCH" means soil containing hydrocarbons;
(v) "this Code of Practice" means the Code of Practice for Land
Treatment of Soil Containing Hydrocarbons, published by the
Department, as amended;
(w) "uppermost formation" means a continuous, water-saturated,
geological stratum including, but not limited to, sand lenses and
aquifers, that is projected to be the most probable pathway for the
lateral transport of potentially contaminated groundwater;
(x) "water body" means a water body as defined in the Water Act.
PART 2: GENERAL REQUIREMENTS
Section 2.1: General
2.1.1 Any person who constructs, operates, or reclaims a registered site, must do
so in accordance with this Code of Practice, unless the site is the subject of
an approval issued under s.6(3) of the Activities Designation Regulation.
2.1.2 Any conflict between the registration application and the terms and
conditions of this Code of Practice shall be resolved in favour of this Code
of Practice.
obligations created under any other authorization issued by Alberta
Environment.
or condition of this Code of Practice or the application of any term or
condition is held invalid, the application of such term or condition to other
circumstances and to the remainder of this Code of Practice shall not be
affected by that invalidity.
2.1.5 If the registration holder monitors for any substances or parameters which
are the subject of limits in this Code of Practice more frequently than is
required, using procedures authorized in this Code of Practice, then the
registration holder shall provide the results of such monitoring as an
addendum to the next reports required by this Code of Practice.
Section 2.2: Analytical Requirements
2.2.1 With respect to any sample required pursuant to this Code of Practice, all
samples shall be:
(
a) collected;
(
b) preserved;
(
c) stored;
(
d) handled; and
(
e) analyzed
in accordance with the following:
(
i) for water, run-off, and liquid samples:
(
A) the Standard Methods for Examination of Water and
Wastewater, 20th edition, 1998, published by the American
Public Health Association, American Water Works
Association, and Water Environment Federation, as
amended;
(
B) the Methods Manual for Chemical Analysis of Water and
Waste, published by Alberta Environment, 1996, as
amended;
(
C) for F1, methods 5030B and 8015B, and for F2, methods
3510C or 3520C and 8015B from the Test Methods for
Evaluating Solid Waste, Physical/Chemical Methods, SW-
846 manual, published by the United States Environmental
Protection Agency, as amended; or
(
D) any other equivalent method authorized in writing in
advance by the Director; and
(ii) except where otherwise specified in this Code of Practice, for soil
and SCH samples, as the case may be:
(
A) the Reference Method for the Canada Wide Standard for
Petroleum Hydrocarbons in Soil - Tier I Method, published
by the Canadian Council of Ministers of the Environment,
2001, as amended;
(
B) the Test Methods for Evaluating Solid Waste,
Physical/Chemical Methods, SW-846 manual, published by
the United States Environmental Protection Agency, as
amended;
(
C) Soil Sampling and Methods of Analysis, 2nd edition Martin
R. Carter editor, published by CRC Press, 2008, as amended;
(
D) any other equivalent method authorized in writing in advance
by the Director.
2.2.2 The registration holder shall analyse all samples that are required to be
obtained by this Code of Practice in a laboratory accredited pursuant to ISO
17025 standard, as amended, for the specific parameter(
s) to be analyzed,
unless otherwise authorized in writing by the Director.
written authorization issued by the Director under 2.2.2.
Section 2.3: Classification of Registered Site
2.3.1 A registered site used or to be used for the land treatment of SCH is deemed
to be a Class II registered site if the following conditions are met:
(
a) the SCH is from one source; and
(
b) the maximum period of time the registered site is used to carry on the
land treatment of SCH is two (2) consecutive years from the first date
on which the SCH was received at the registered site.
2.3.2 A registered site that is not deemed to be a Class II registered site under
2.3.1, is deemed to be a Class I registered site.
PART 3: REGISTRATION APPLICATION/
ADMINISTRATION REQUIREMENTS
Section 3.1: Registration
3.1.1 An application for registration of a site shall contain, at a minimum, the
following information:
(
a) the information specified in
Schedule 1; and
(
b) a declaration of whether the site referred to in the application for
registration is to be a Class I registered site or a Class II registered site,
as specified in 2.3.
3.1.2 Where a registration has been issued respecting a particular registered site,
that registration cannot be applied to any other land.
3.1.3 Subject to 3.2.2(a), 5.1.13 and 5.1.14, and in addition to any other reporting
required under this Code of Practice, the Act, and the regulations, the
registration holder shall inform the Director in writing within three
(3) months after any change to the information submitted to the Director in a
registration application.
Section 3.2: Written Consent of Registered Owners
3.2.1 No person shall commence or continue land treatment of SCH unless and
until written consent of all registered owners of the land on which the
registered site is located has been obtained for the conduct of land treatment
of SCH at the registered site.
3.2.2 Where a registered landowner of land on which a registered site for land
treatment of soil containing hydrocarbons withdraws consent for the
operation of land treatment of soil containing hydrocarbons, the registration
holder shall:
(
a) within seven (7) days of receipt of written withdrawal of consent,
provide the Director with a copy of the written withdrawal of consent;
and
(
b) comply with the written directions of the Director.
PART 4: SITE AND DESIGN REQUIREMENTS
4.1.1 Subject to 4.1.7, no person shall commence or continue land treatment of
SCH on a registered site:
(
a) where the boundaries of the land cell are within one-hundred
(100) metres of the property boundary of land on which a school, hospital,
food establishment, or residence is located;
(
b) where the boundaries of the land cell are within one-hundred
(100) metres of the bed, shore, or bank of a water body unless authorized in
writing by the Director;
(
c) where the boundaries of the land cell are within any area that
permanently or intermittently contains surface water as a result of a
man-made structure including, but not limited to, any irrigation canal,
drainage ditch, or reservoir, or within one-hundred (100) metres of the
bed, shore, or bank of any such area;
(
d) where the boundaries of the land cell are within any area specified
under the Wildlife Act or the Migratory Birds Convention Act, 1994,
c.22, as a wildlife habitat conservation area, a wildlife sanctuary, or a
migratory bird sanctuary;
(
e) where any portion of the land cell is located on coarse-grained soil; or
(
f) where coarse-grained soil occurs within two metres beneath the ground
surface of any portion of the land cell.
4.1.2 Subject to 4.1.7, no person shall commence or continue land treatment of
SCH in a land cell on a registered site unless the land cell meets the
following minimum requirements:
(
a) the land cell is surrounded by berms that:
(
i) allow no surface water to flow onto the land cell from areas
surrounding the land cell, and
(ii) for a Class II registered site, collect and control all run-off
resulting from a one (1) in ten (10) year, 24-hour duration rainfall
event;
(
b) the land cell is graded to a slope that does not exceed nine (9) percent;
and
(
c) the maximum depth of cultivation of the soil that occurs in the land
cell is a minimum of one metre above the water table.
4.1.3 Berms must be constructed by either:
(
a) compacting fine-grained soils; or
(
b) placing a synthetic material along the entire interior wall.
4.1.4 Where a barrier is constructed,
(
a) there shall be no gap between the barrier and the berm; and
(
b) at a Class I registered site, the land cell must be graded to a sump for
collection and removal of run-off.
4.1.5 Where a barrier is constructed, the barrier must have a maximum seepage
rate equivalent to that of a compacted clay liner that:
(
a) is under 0.3 metres head of water;
(
b) has a hydraulic conductivity of 1 x 10-7 cm/s; and
(
c) has a thickness of:
(i) 0.6 metres for a Class I registered site, measured perpendicular to
the barrier and sump surface, or
(ii) 0.3 metres for a Class II registered site, measured perpendicular to
the barrier surface.
4.1.6 No person shall commence or continue land treatment of SCH in a land cell
on a Class I registered site unless that Class I registered site has a run-off
retention pond that:
(
a) collects and retains all run-off removed from the land cell(s);
(
b) has the capacity to retain precipitation resulting from a one (1) in
twenty-five (25) year, twenty-four (24)-hour duration rainfall event;
and
(
c) has a maximum seepage rate equivalent to that of a compacted clay
liner that:
(
i) is under 0.3 metres head of water,
(ii) has a hydraulic conductivity of 1 x 10-7 cm/s, and
(iii) is 0.3 metres in thickness.
4.1.7 Clauses 4.1.1(e), 4.1.1(f), 4.1.2(b), and 4.1.2(
c) do not apply to a land cell
that contains a barrier.
PART 5: OPERATIONAL REQUIREMENTS
Section 5.1: General Operating Requirements
5.1.1 No person shall commence or continue land treatment of SCH at any
location on a registered site except in a land cell.
5.1.2 No person shall land treat SCH at a registered site unless:
(
a) representative samples have been collected of
(
i) the SCH prior to treatment, and
(ii) the SCH or treated soil already present in the land cell if
additional SCH is to be placed on top.
(
b) representative samples referred to in (
a) have been analyzed for:
(
i) F1,
(ii) F2,
(iii) F3, and
(iv) F4;
(
c) results of the analyses required under (
b) have been recorded, and
(
d) the total concentration of F1, F2, F3, and F4 does not exceed three
(3) percent by dry weight, as indicated by the results of the analyses of
each representative sample.
5.1.3 In addition to any other requirements in the Act or the regulations, and
notwithstanding any other provision in this Code of Practice, the registration
holder shall temporarily store SCH in a land cell prior to land treatment on a
registered site only where the following conditions are met:
(
a) stored SCH will be treated in a land cell on that registered site; and
(
b) the total concentration of petroleum hydrocarbons in the SCH to be
stored in the land cell does not exceed three (3) percent by dry weight.
5.1.4 No person shall apply SCH in a land cell on a registered site if any of the
following conditions are present:
(
a) the thickness of the layer of SCH in the land cell after application of
SCH exceeds the depth that can be cultivated where:
(
i) the treatment process requires cultivation of SCH, and
(ii) no barrier is used;
(
b) the thickness of the layer of SCH that will be in the land cell after
application of SCH would be greater than twenty (20) centimetres
where:
(
i) the treatment process requires cultivation of SCH, and
(ii) a barrier is used;
(
c) the SCH that will be applied to the land cell would be placed on top of
SCH that does not meet all the parameter concentration limits
specified for soil remediation in the Alberta Tier 1 Soil and
Groundwater Remediation Guidelines, as amended, for the applicable
use of the registered site after it is reclaimed, as determined by testing
in accordance with 6.1.1.
5.1.5 No person shall commence or continue land treatment of SCH on a
registered site unless:
(
a) access to the registered site is restricted to persons authorized by the
registration holder;
(
b) signage is posted around the boundaries on each side of the registered
site:
(
i) stating that land treatment of SCH is being carried on, and
(ii) providing a contact telephone number; and
(
c) subject to 5.1.6, where the treatment process requires cultivation of
SCH, at least once every four (4) weeks:
(
i) where no barrier is used, the full thickness of the SCH that has
been applied to the land cell is cultivated, or
(ii) where a barrier is used, at least seventy-five (75) percent of the
full thickness of the SCH that has been applied over the barrier is
cultivated.
5.1.6 Where the SCH or the receiving soil in the land cell is saturated with water,
covered with ice or snow, or is frozen, a person carrying on land treatment
of SCH on a registered site is not required to cultivate the SCH as specified
in 5.1.5(c).
5.1.7 Run-off on a Class I registered site shall be removed from the land cell to
the run-off retention pond.
5.1.8 No person shall permit the release of any run-off from:
(
a) a Class II registered site; or
(
b) a run-off retention pond, referred to in 4.1.6, of a Class I registered
site,
unless the run-off:
(
i) has been tested prior to the release, and is released into a
wastewater system of a municipality where:
(
A) the wastewater system has been issued an approval or
registration under the Act, and
(
B) the municipality has consented in writing to the release of
run-off into its wastewater system; or
(ii) is released to the environment where the quality of the run-off that
is released meets all of the limits specified in Table 5-1, as
determined from a sample analyzed for all of the parameters
specified in Table 5-1, or
(iii) is disposed of at a facility authorized under the Act or the Oil and
Gas Conservation Act for the disposal of that type of waste.
5.1.9 The registration holder shall record results of the analyses required under
5.1.8.
Table 5-1: Quality Limits for Release of Run-off
Parameter
Limit
Total Suspended Solids
25 mg/L maximum
Chemical Oxygen Demand
50 mg/L maximum
Oil and Grease
No visible sheen
6.0 to 9.5 units
5.1.10 Upon request of the Director or an inspector, the registration holder shall:
(
a) obtain samples of run-off and liquids;
(
b) conduct analyses as requested by the Director or inspector;
(
c) record results of analyses; and
(
d) provide results of analyses conducted on samples to the Director or
inspector.
5.1.11 Subject to 5.1.12, no person shall remove soil or SCH from a registered site
unless:
(
a) samples have been collected of the soil and SCH that will be removed
from the registered site in accordance with the sampling requirements
specified in Table 5-2 or Table 5-4, as the case may be;
(
b) the samples referred to in (
a) have each been analyzed for:
(
i) Benzene,
(ii) Toluene,
(iii) Ethylbenzene,
(iv) Xylenes,
(
v) F1,
(vi) F2,
(vii) F3,
(viii) F4, and
(ix) Lead;
(
c) results of analyses referred to in (
b) have been recorded;
(
d) the analytical results of the analyses in (
b) comply with each parameter
concentration limit specified for soil remediation the Alberta Tier 1
Soil and Groundwater Remediation Guidelines, as amended, for the
applicable soil type, and land use of the receiving land; and
(
e) the following information regarding the receiving land has been
recorded:
(
i) legal land description, and
(ii) land use zoning.
5.1.12 Clause 5.1.11 does not apply to the removal of soil or SCH from the
registered site to:
(
a) a registered site declared to be Class I, that is the subject of a
registration under the Act;
(
b) a site or facility that is approved under the Act or the Oil and Gas
Conservation Act for the land treatment of SCH; or
(
c) a landfill approved or registered under the Act where the landfill
operator accepts the soil or SCH into the landfill.
Table 5-2: Soil Monitoring at a Class II Registered Site
Location -
Sampling Zone
Determination
Type and Number
of Samples in Each
Sampling Zone
Frequency
Parameter
For each
hectare, or
portion thereof,
upon which
SCH will or
has been
applied, divide
the area into 6
equal-sized
square
sampling
zones.
Where a barrier is
not used, a
minimum of one
sample from the
following depths:
* the depth of
treated SCH,
and
* the underlying
soil from
immediately
under the
treated SCH to
a depth of 15
1. Subject to
5.1.12, prior to
removal of soil
and SCH; and
2. Prior to closure
of the
registered site
* benzene,
toluene,
ethylbenzene,
xylenes and
lead
* F1, F2, F3, and
Where a barrier is
used and the
barrier consists of
fine-grained soil, a
minimum of one
sample from the
following depths:
* the depth of
treated SCH,
and
* the barrier
from
immediately
under the
treated SCH to
a depth of 15
Where a barrier is
used and the barrier
consists of a
material other than
a fine-grained soil,
a minimum of one
sample from the
following depths:
* the depth of
treated SCH,
and
the underlying soil
from immediately
under the treated
SCH to the barrier,
or to a depth of 15
cm if the barrier
has been
perforated
5.1.13 No person shall continue to operate a registered site for which the
registration application in 3.1.1 contained a declaration that the site was to
be a Class II registered site unless the registered site complies with 2.3.1.
5.1.14 No person shall continue to operate a registered site:
(
a) for which the registration application in 3.1.1 contained a declaration
that the site was to be a Class II registered site; and
(
b) that no longer complies with 2.3.1;
unless information has been submitted by the registration holder to the
Director including at a minimum:
(
c) a declaration that the site is a Class I registered site; and
(
d) an acknowledgement that the registration holder is bound by all Class I
requirements within this Code of Practice.
Section 5.2: Monitoring Requirements for a Class I Registered Site
5.2.1 A registration holder for a Class I registered site shall monitor the:
(
a) soil; and
(
b) groundwater
in accordance with this Code of Practice.
5.2.2 All groundwater monitoring wells shall be
(
a) protected from damage; and
(
b) locked, except when being sampled,
unless otherwise authorized in writing by the Director.
5.2.3 If a groundwater sample cannot be collected because the monitoring well is
damaged or is no longer capable of producing a representative groundwater
sample:
(
a) the groundwater monitoring well shall be cleaned, repaired, or
replaced; and
(
b) a representative groundwater sample shall be collected prior to the next
scheduled sampling date unless otherwise authorized in writing by the
Director.
5.2.4 Groundwater samples from a registered site shall be:
(
a) collected; and
(
b) analyzed
in accordance with Table 5-3.
Table 5-3: Groundwater Monitoring at a Class I Registered Site
Sample Type and
Number
Frequency
Parameter
One representative
groundwater sample
from each groundwater
monitoring well
1. Before
commencement of
land treatment; and
2. Annually; and
3. Prior to closure of the
registered site
* benzene, toluene,
ethylbenzene, and
xylenes
* F1and F2
5.2.5 The results of the analyses required in 5.2.4 shall be recorded.
5.2.6 At the time of collection of each groundwater sample referred to in 5.2.4, the
static water level in the water well shall be:
(
a) measured; and
(
b) recorded
prior to collecting a sample.
5.2.7 If the results of the analyses in 5.2.4 show the concentration of one or more
of F1, F2, benzene, toluene, ethylbenzene, or xylenes exceeded the
respective laboratory detection limits, then the registration holder must
immediately report the results to the Director in accordance with the
procedures set out in 7.1.1.
5.2.8 Soil samples from a registered site must be:
(
a) collected; and
(
b) analyzed
in accordance with Table 5-4.
5.2.9 The results of the analyses required in 5.2.8 shall be recorded.
Table 5-4: Soil Monitoring at a Class I Registered Site
Location -
Sampling
Zone
Determination
Type and
Number of
Samples in Each
Sampling Zone
Frequency
Parameter
For each hectare,
or portion
thereof, upon
which SCH will
or has been
applied, divide
the area into 9
equal-sized
square sampling
zones.
Where a barrier is
not used, a
minimum of one
sample from the
following depths:
* the depth of
treated SCH;
and
* the underlying
soil from
immediately
under the
treated SCH to
a depth of 15
1. Before
commence-
ment of land
treatment;
2. Subject to
5.1.12, prior to
removal of soil
and SCH; and
3. Prior to closure
of the
registered site
* benzene,
toluene,
ethylbenzene,
xylenes, and
lead
* F1, F2, F3, F4
Where a barrier is
used and the
barrier consists of
fine-grained soil, a
minimum of one
sample from the
following depths:
* the depth of
treated SCH;
and
* the barrier
from
immediately
under the
treated SCH to
a depth of 15
1. Subject to
5.1.12, prior to
removal of soil
and SCH; and
2. Prior to closure
of the
registered site
Where a barrier is
used and the
barrier consists of
a material other
than a fine-grained
soil, a minimum of
one sample from
the following
depths:
* the depth of
treated SCH,
and;
* the underlying
soil from
immediately
under the
treated SCH to
the barrier or to
a depth of 15
cm if the
barrier has
been perforated
1. Subject to
5.1.12, prior to
removal of soil
and SCH; and
2. Prior to closure
of the
registered site
PART 6: DECOMMISSIONING AND CLOSURE REQUIREMENTS
6.1.1 No person shall commence closure of a registered site unless:
(
a) the samples of:
(
i) SCH; and
(ii) soil
have been collected from each registered site in accordance with the
sampling requirements specified in Table 5-2 or Table 5-4, as the case
may be;
(
b) the samples referred to in (
a) have been analyzed for:
(
i) Benzene,
(ii) Toluene,
(iii) Ethylbenzene,
(iv) Xylenes,
(
v) F1,
(vi) F2,
(vii) F3,
(viii) F4, and
(ix) Lead;
(
c) the analytical results of the analyses in (
b) comply with the maximum
soil remediation concentrations specified for each parameter in the
Alberta Tier 1 Soil and Groundwater Remediation Guidelines, as
amended, for the applicable intended land use category of the
registered site after closure; and
(
d) the results of analyses required in (
b) have been recorded.
6.1.2 Closure of the registered site shall include, but is not limited to:
(
a) removing all ponds, berms, and barriers that were constructed for the
operation of the registered site; and
(
b) recontouring the land surface to blend in with the adjacent land.
6.1.3 In addition to the requirements specified in 6.1.1, closure of a Class II
registered site must be completed within three (3) years from the first date
on which the SCH was received at the registered site.
6.1.4 A registration holder shall notify the Director in writing within thirty
(30) calendar days after the date on which closure of a registered site was
completed.
6.1.5 The notification to the Director under 6.1.4 shall include:
(
a) for a Class I registered site,
(
i) an
interpretation of the results of the analyses, as specified in
6.1.1, and
(ii) an
interpretation of the monitoring results referred to in 5.2.1,
5.2.3, 5.2.4, 5.2.5, 5.2.6, 5.2.8, and 5.2.9;
(
b) for a Class II registered site, an
interpretation of the results of the
analyses as specified in 6.1.1.
(
c) a completed Record of Site Condition.
PART 7: REPORTING REQUIREMENTS
Section 7.1: Contravention Reporting
7.1.1 In addition to any other reporting required pursuant to this Code of Practice,
the Act, or the regulations, the registration holder shall immediately report
to the Director any contravention of this Code of Practice either:
(
a) by telephone at (780) 422-4505; or
(
b) by a method:
(
i) in compliance with the release reporting provisions in the Act and
the regulations, or
(ii) authorized in writing by the Director.
7.1.2 In addition to the immediate report in 7.1.1, the registration holder shall
provide a report to the Director:
(
a) in writing; or
(
b) by a method:
(
i) in compliance with the release reporting provisions in the Act and
the regulations, or
(ii) authorized in writing by the Director
within seven (7) calendar days of the discovery of the contravention, or
within another time period specified in writing by the Director.
7.1.3 The report required under 7.1.2 shall contain, at a minimum, the following
information:
(
a) a description of the contravention;
(
b) the date of the contravention;
(
c) the duration of the contravention;
(
d) the legal land description of the location of the contravention;
(
e) an explanation as to why the contravention occurred;
(
f) the name of the registered owner or owners of the land on which the
contravention occurred;
(
g) a
summary of all preventive measures and actions that were taken prior
to the contravention;
(
h) a
summary of all measures and actions that were taken to mitigate any
effects of the contravention;
(
i) a
summary of all measures that will be taken to address the remaining
effects and potential effects related to the contravention;
(
j) the number of the registration issued under the Act for the land
treatment registered site, and the name of the person who held the
registration at the time the contravention occurred;
(
k) the name, address, phone number, and responsibilities of all persons
constructing, operating, or reclaiming the registered site at the time the
contravention occurred;
(
l) the name, address, phone number, and responsibilities of all persons
who had charge, management, or control of the registered site at the
time the contravention occurred;
(
m) a
summary of proposed measures that will prevent future
contraventions, including a
schedule of implementation for these
measures;
(
n) any information that was maintained or recorded under this Code of
Practice, as a result of the incident; and
(
o) any other information required by the Director in writing.
PART 8: RECORD KEEPING REQUIREMENTS
8.1.1 The registration holder shall:
(
a) record the following information; and
(
b) keep the following records available for five (5) years from the date of
the completion of closure of the registered site:
(
i) all records that are required under this Code of Practice,
(ii) the results of any monitoring and analysis that are carried on, and
information that is recorded, pursuant to 5.1.2, 5.1.8, 5.1.9, 5.1.10,
5.1.11, 5.2.1, 5.2.3, 5.2.4, 5.2.5, 5.2.6, 5.2.8, 5.2.9, 6.1.1, and
6.1.5,
(iii) for each source of SCH:
(
A) the name of the person supplying the SCH;
(
B) the source of the SCH, including but not limited to, a legal
land description and any available municipal address of the
parcel of land from which the SCH was taken; and
(
C) the quantity of SCH received from the source referred to in
clause (B); and
(
D) the date of arrival of the SCH on the registered site,
(iv) a description of all maintenance and repairs made to the registered
site,
(
v) all applications submitted to Alberta Environment for a
registration,
(vi) all engineering drawings and specifications for the registered site,
including but not limited to the design specifications,
(vii) construction documents,
(viii) record drawings,
(ix) all reports of inspections conducted by Alberta Environment,
(
x) all registrations issued under the Act for the registered site, and
(xi) all correspondence sent to Alberta Environment.
8.1.2 The results and records in 8.1.1(b)(ii) shall contain, at a minimum, all of the
following information:
(
a) the date, place and time of monitoring, and the name of the person
collecting the sample;
(
b) identification of the sample type;
(
c) date of analysis;
(
d) laboratory name and person responsible for performing analysis;
(
e) the analytical method used; and
(
f) the results of the analysis.
8.1.3 The registration holder shall immediately provide any records, reports, or
data required to be created under this Code of Practice to the Director or an
inspector, upon request.
PART 9: CODE OF PRACTICE ADMINISTRATION
9.1.1 This Code of Practice will be reviewed as changes in technological and
other standards warrant.
SCHEDULE 1
REGISTRATION INFORMATION
Pursuant to 3.1.1(
a) of this Code of Practice, all of the following information shall be
provided to the Director:
(
a) The name of the applicant, and their address, phone number, facsimile
number, and e-mail address;
(
b) The company name, if any, and the name, job title, address, phone number,
facsimile number, e-mail address, and signature of the person who submitted
the registration application on behalf of the applicant;
(
c) If a person other than the applicant submitted the registration application,
written authorization from the applicant, stating that the person who
submitted the registration application was authorized to do so on behalf of
the applicant;
(
d) The name, job title, address, phone number, facsimile number, and e-mail
address of the person designated by the applicant as the primary contact for
the registered site;
(
e) The municipal address, if one exists, and legal land description (LLD),
including the quarter section(
s) of the land and the zoning classification on
which the registered site is or will be located;
(
f) The names, addresses and phone numbers of the current registered owner or
owners of the parcel or parcels on which the land treatment of SCH would
be carried out, and the written consent of the owner or owners;
(
g) The names, addresses, and phone numbers of the current occupant or
occupants or lessees of the parcel or parcels on which the land treatment of
SCH would be carried out;
(
h) A brief description of the SCH treatment method; and
(
i) A scale drawing that shows the location of:
(
i) the site,
(ii) the boundaries of the parcel or parcels of land on which the land
treatment of SCH would be carried out,
(iii) any existing and proposed access road(s),
(iv) any existing and proposed structures or equipment,
(
v) adjacent land use, and
(vi) any surface water bodies within five hundred (500) metres of the site.
In consideration of the information required above, the Director waives the
requirements of subsection 3(1)(
a) through (
q) of the Approvals and Registration
Procedure Regulation, A.R. 113/93, as amended from time to time, for a registration
application under this Code of Practice.
Finance and Enterprise
Supplementary Letters Patent
(Loan and Trust Corporations Act)
Notice is hereby given that a Supplementary Letters Patent was issued to Cidel Trust
Company Ltd. effective August 21, 2008 changing the name to Cidel Trust Company.
James T. Flett,
Deputy Superintendent.
Safety Codes Council
Corporate Accreditation - Cancellation
(Safety Codes Act)
Pursuant to
Section 28 of the Safety Codes Act it is hereby ordered that
The Wiser Oil Company of Canada, Accreditation No. C000237, Order No. 1325
Is to cease administration under the Safety Codes Act within their jurisdiction for
Electrical
Consisting of all parts of the Canadian Electrical Code, Code for Electrical
Installations at Oil and Gas Facilities and Alberta Electrical Utility Code.
Accredited Date: March 7, 2001. Issued Date: August 15, 2008.
Municipal Accreditation - Cancellation
(Safety Codes Act)
Pursuant to
Section 26 of the Safety Codes Act it is hereby ordered that
Municipal District of Spirit River No. 133, Accreditation No. M000140, Order No.
Due to voluntary withdrawal from accreditation is to cease administration under the
Safety Codes Act within it's jurisdiction for Building
Date: September 30, 2008.
______________
Pursuant to
Section 26 of the Safety Codes Act it is hereby ordered that
Municipal District of Spirit River No. 133, Accreditation No. M000140, Order No.
Due to voluntary withdrawal from accreditation is to cease administration under the
Safety Codes Act within it's jurisdiction for Electrical
Date: September 30, 2008.
______________
Pursuant to
Section 26 of the Safety Codes Act it is hereby ordered that
Municipal District of Spirit River No. 133, Accreditation No. M000140, Order No.
Due to voluntary withdrawal from accreditation is to cease administration under the
Safety Codes Act within it's jurisdiction for Fire
Date: September 30, 2008.
______________
Pursuant to
Section 26 of the Safety Codes Act it is hereby ordered that
Municipal District of Spirit River No. 133, Accreditation No. M000140, Order No.
Due to voluntary withdrawal from accreditation is to cease administration under the
Safety Codes Act within it's jurisdiction for Gas
Date: September 30, 2008.
______________
Pursuant to
Section 26 of the Safety Codes Act it is hereby ordered that
Municipal District of Spirit River No. 133, Accreditation No. M000140, Order No.
Due to voluntary withdrawal from accreditation is to cease administration under the
Safety Codes Act within it's jurisdiction for Plumbing
Date: September 30, 2008.
Tourism, Parks and Recreation
Hosting Expenses Exceeding $600.00
For the period April 1 to June 30, 2008
Function: 2008 Spring Training - Travel Alberta and Community Visitor
Information Centre Staff - Regional Familiarization Tour - Royal Alberta Museum
Date: May 1, 2008
Amount: $3,519.45
Purpose: To provide dinner for the visitor information centre contractors, travel
counsellors and representatives of community participating in the Familiarization
Tour, which are an important way for travel counsellors to get familiar with various
attractions, destinations, points of interest, tourism operators, etc.
Location: Royal Alberta Museum, Edmonton, AB
BU#: 309A
Function: 2008 Spring Training - Travel Alberta and Community Visitor
Information Centre Staff - First Aid Training
Date: May 6, 2008
Amount: $1,065.38
Purpose: To provide breakfast, lunch and refreshments for the attendees of the
training.
Location: Ramada Inn & Water Park, Edmonton, AB
BU#: 309A
Function: 2008 Spring Training - Travel Alberta and Community Visitor
Information Centre Staff - Regional Familiarization Tour - Rocky Mountains
Date: May 11-12, 2008
Amount: $974.75
Purpose: To provide breakfast, lunch and two dinners for Travel Alberta and
Community Visitor Information staff participating in a Regional Familiarization Tour.
Familiarization Tours are an important way for travel counsellors to get familiar with
various attractions, destinations, points of interest, tourism operators, etc.
Location: Bayshore Inn, Waterton, AB., Great Canadian Barn Dance, Rocky
Mountains
BU#: 309A
Function: Travel Alberta - Tourism Destination Region Chairs, Marketing Directors
and Portfolio Managers Meeting
Date: June 6, 2008.
Amount: $1,041.95
Purpose: To provide breakfast, lunch and refreshments for the attendees of the
meeting.
Location: Marriot River Cree Resort, Edmonton, AB
BU#: 309A
Transportation
Contract Increases Approved Pursuant to Treasury Board Directive 08/93
Contract No: 7432/07
Contractor: West-Can Seal Coating Inc.
Reason for Increase: This contract involves chip seal coat and other work on Hwy.'s
3:03, 64:02, 674:02 & 733:02 and graded aggregate seal coat and other work on
Hwy.'s 725:02 & 150:04 & 06. The contract was extended to include graded
aggregate seal coat on Hwy. 35:12, 672:02, 750:02 & 2:48
Contract Amount: $2,680,981.82
% of Increase: 10.00
Amount of Increase: $268,204.23
Date Approved: May 3, 2007
Contract No: 7422/07
Contractor: Carmacks Enterprises Ltd.
Reason for Increase: This contract involves asphalt concrete pavement and other
work on Hwy. 617:02 - Hwy. 21 to Hwy. 623. Quantities increased in overburden
removal and excess repair on roads was required after the 75% ban had been lifted.
Contract Amount: $3,156,266.50
% of Increase: 19.20
Amount of Increase: $606,108.64
Date Approved: August 14, 2007
Contract No: 7473/07
Contractor: Canadian Pipeline Construction Inc.
Reason for Increase: This contract involves grading and other work on Hwy. 35:12
Access Removal and Service Road Construction. The contract was extended to
include grading of an additional service road.
Contract Amount: $501,882.00
% of Increase: 26.49
Amount of Increase: $132,972.98
Date Approved: August 20, 2007
Contract No: 7294/06
Contractor: Brooks Asphalt & Aggregate Ltd.
Reason for Increase: This contract involves granular base course, asphalt concrete
pavement (EPS) and other work on Hwy. 561:04 Hwy. 56 to County Boundary. Extra
work was required for unforeseen site conditions concerning subgrade preparation.
Contract Amount: $6,301,890.70
% of Increase: 12.04
Amount of Increase: $758,627.74
Date Approved: August 22, 2007
Contract No: 7295/07
Contractor: Brooks Asphalt & Aggregate Ltd.
Reason for Increase: This contract involves granular base courses, asphalt concrete
pavement and other work on Hwy. 561:04 E. of Hwy. 56 to Jct. Hwy. 862. Extra
work was required for unforeseen site conditions concerning subgrade preparation.
Contract Amount: $5,367,490.55
% of Increase: 19.37
Amount of Increase: $1,039,849.02
Date Approved: August 22, 2007
Contract No: 6925/05
Contractor: Sureway Construction Management Ltd.
Reason for Increase: This contract involves grading, granular base course, asphalt
concrete pavement, street lighting, traffic signals and other work on Hwy. 216:08
AHD- Jct. Hwy. 16 to Jct. 137 Ave. Erosion repairs were required as a result of spring
runoff and heavy rain.
Contract Amount: $9,773,784.95
% of Increase: 16.21
Amount of Increase: $1,583,908.42
Date Approved: September 19, 2007
Contract No: 7308/07
Contractor: Border Paving Ltd.
Reason for Increase: This contract involved grading, granular base course, asphalt
concrete pavement and other work on Hwy. 36:18 Intersection Improvement at Jct.
Hwy. 14, Viking. Extra work was required due to unusable common excavation and
unstable ground conditions encountered at the site.
Contract Amount: $2,807,881.00
% of Increase: 15.43
Amount of Increase: $ 433,321.10
Date Approved: October 23, 2007
Contract No: 7376/06
Contractor: Canadian Pipeline Construction Inc.
Reason for Increase: This contract involves emergency slide repair and other work
on Hwy. 2:68 Dunvegan South Hill. dditional quantities were incurred due to
remediation of the new slide and additional top soil placement, centerline culvert and
drainage channel to complete the project.
Contract Amount: $1,116,510.00
% of Increase: 107.4
Amount of Increase: $1,199,284.14
Date Approved: December 4, 2007
Contract No: 7301/06
Contractor: Border Paving Ltd.
Reason for Increase: This contract involves grading, granular base course, median
cable barrier, asphalt concrete pavement and other work on Hwy. 39:06/08 - E. of
Hwy. 23 to W. of Hwy. 770 (
N) and bridge work on Hwy. 39:08 - B.F. 71223 -
Carrying Hwy. 39 over Watercourse, Tributary to Strawberry Creek near Alsike.
Geotechnical Slide Remediation was more complex than originally estimated
resulting in higher construction costs.
Contract Amount: $13,956,123.00
% of Increase: 11.83
Amount of Increase: $1,651,617.89
Date Approved: November 21, 2007
Contract No: 7442/07
Contractor: Sandstar Construction Ltd.
Reason for Increase: This contract involves intersection improvements, asphalt
concrete pavement and other work on Hwy. 36:24 Jct. Hwy. 29 to Jct. Hwy. 28, Hwy.
28:10 W. of Ashmont to Jct. Hwy. 36, Hwy. 29:10 Jct. Hwy. 36 to E. of St. Brides, &
Hwy. 646:04 Jct. Hwy. 41 to E. of Jct. Hwy. 41. An extension to the contract was
undertaken to include the Ashmont south access and quantity of ACP increase to
complete the leveling, repair, and sealing of crack filler and superelevation
corrections.
Contract Amount: $7,480,729.00
% of Increase: 13.84
Amount of Increase: $1,035,609.92
Date Approved: Feb 27, 2008
Contract No: 7593/07
Contractor: Kichton Contracting Ltd.
Reason for Increase: This contract involves site remediation on the North Edmonton
Ring Road 66th Street Interchange. Extra work was required to excavate and dispose
of an increase of material in an old pig lagoon.
Contract Amount: $2,370,000.00
% of Increase: 60.64
Amount of Increase: $1,437,207.73
Date Approved: May 6, 2008
Contract No: 6884/07
Contractor: Wells Construction Ltd.
Reason for Increase: This contract involves grading, storm sewer installation, MSE
Wall construction, bridge approach slab construction, granular base course, asphalt
concrete pavement, street lighting and other work on Hwy. 216:04 & 06 Anthony
Henday Drive - Jct. Hwy. 2 (Calgary Trail/Gateway Blvd.) to W. of 127 St., in the
City of Edmonton and Hwy. 2:32 Calgary Trail/Gateway Blvd. Realignment, in the
City of Edmonton. The scope of work expanded to include base and paving of a
section of Anthony Henday Drive through Whitemud Creek and paving on Ellerslie
Drive. Overruns were encountered in Class B concrete, cement stabilized subgrade
and common excavation.
Contract Amount: $17,866,646.83
% of Increase: 40.3
Amount of Increase: $7,152,273.47
Date Approved: June 18, 2008
ADVERTISEMENTS
Notice of Application for a Certificate of Dissolution
of a Provincial Company
pursuant to
Part 2, Division 11 of the Insurance Act
(Insurance Act)
Notice is hereby given that Innovative Insurance Corporation intends to apply to the
Minister for a Certificate of Dissolution pursuant to
Part 2, Division 11,
Section
184(2) of the Insurance Act, c. 1-5.1 on the basis that it has no property and no
liabilities and is authorized by a special resolution of the shareholders.
Any persons wishing to receive further information concerning the subject application
should address their queries to applicant's legal counsel Fraser Milner Casgrain LLP
10180 101 Street Edmonton, Alberta T5J 3V5, Attention: Shelley L. Miller, Q.C.
Dated at Edmonton, Alberta, September 15, 2008.
Public Sale of Land
(Municipal Government Act)
Clearwater County
Notice is hereby given that, under the provisions of the Municipal Government Act,
Clearwater County will offer for sale, by public auction, in the Municipal Office,
4340 - 47 Avenue, Rocky Mountain House, Alberta, on Monday, November 3, 2008,
at 10:00 a.m., the following lands:
Legal
C. of T.
SW 5-38-4-W5M
Each parcel will be offered for sale, subject to a reserve bid and to the reservations
and conditions contained in the existing certificate of title.
The County may, after the public auction, become the owner of any parcel of land not
sold at the public auction.
Terms: Cash or Certified Cheque. Deposit: 10 % of bid at time of the sale, November
3, 2008. Balance: 90 % of bid within 30 days of receipt by the County.
Redemption may be effected by payment of all arrears of taxes and costs at any time
prior to the sale.
Dated at Rocky Mountain House, Alberta, September 2, 2008.
Ron Leaf, Municipal Manager.
County of Lethbridge
Notice is hereby given that, under the provisions of the Municipal Government Act,
the County of Lethbridge will offer for sale, by public auction, in the County Office,
#100, 905 - 4 Avenue South, Lethbridge, Alberta, on Friday, November 14, 2008, at
9:00 a.m., the following lands:
Title
Linc
Plan, Blk., Lot
M., Rg., Twp., Sc.,
Pt. of Sec.
Acres
21P45
4;17;8;19;SW LSD 3
TZ29
4;19;9;8; SW
.600
4;20;8;20; SE
4;20;8;23; SE
89.1
8183EA, 2, 5
138A, 4, 7-10
138A, 4, 11-14
187LK, 18, 3
Each parcel will be offered for sale, subject to a reserve bid and to the reservations
and conditions contained in the existing certificate of title.
The County of Lethbridge may, after the public auction, become the owner of any
parcel of land not sold at the public auction.
Terms: Cash
Redemption may be effected by payment of all arrears of taxes and costs at any time
prior to the sale.
Dated at Lethbridge, Alberta, August 29, 2008.
Dennis Shigematsu, County Manager.
______________
Mackenzie County
Notice is hereby given that, under the provisions of the Municipal Government Act,
the Mackenzie County will offer for sale, by public auction, in the Council Chambers
located at 4511 - 46 Avenue in the Hamlet of Fort Vermilion, Alberta, on
Wednesday, October 29, 2008, at 4:00 p.m., the following lands:
Qtr.
Sec.
Twp.
Rge.
Mer.
Acres
C. of T.
Linc
9.74
Lot
Blk.
Plan
C. of T.
Linc
2938RS
2938RS
Each parcel will be offered for sale, subject to a reserve bid and to the reservations
and conditions contained in the existing certificate of title. Additional conditions of
building demolition and leveling of lot and/or repair of unsightly conditions will
apply.
The land is being offered for sale on an "as is, where is" basis, and the Mackenzie
County makes no representation and gives no warranty whatsoever as to the adequacy
of services, soil conditions, absence or presence of environmental contamination, or
the developability of the subject land for any intended use by the purchaser.
No bid will be accepted where the bidder attempts to attach conditions precedent to
specified by the Mackenzie County. Not further information is available at the auction
regarding the lands to be sold. This list is subject to deletions.
Terms: Cash
The Mackenzie County may, after the public auction, become the owner of any parcel
of land not sold at the public auction.
Redemption may be effected by payment of all arrears of taxes and costs at any time
prior to the sale.
Dated at the Hamlet of Fort Vermilion, Alberta, August 29, 2008.
Joulia Whittleton, Director of Corporate Services.
______________
Yellowhead County
Notice is hereby given that, under the provisions of the Municipal Government Act,
Yellowhead County will offer for sale, by public auction, in the Yellowhead County
Office, 2716 - 1 Avenue, Edson, Alberta, on Wednesday, October 29, 2008, at 10:00
a.m., the following lands:
Tax
Roll
Legal Description
Title
Number
Acreage
W 1/2 SW 36-53-8 W5M
69.47 Acres
NE 25-53-14 W5M
87.45 Acres
SE 1-53-11-W5M
158.97
Plan4023HW Block C
NE 27-53-9 W5M
Wildwood
Lot
Plan 7823295 Block 4 Lot 5
NE 27-53-9 W5M
Wildwood
Lot
Plan 8120712 Block 1 Lot 12
SE 30-53-7 W5M
Evansburg
Lot
Plan 2505KS Block 11 Lots 6 & 7
SE 30-53-7 W5M
Evansburg
992322385+1
Lot
Plan 482CH Block 2 Lot 17
NE 19-53-7-W5M
Evansburg
Lot
Each parcel will be offered for sale, subject to a reserve bid and to the reservations
and conditions contained in the existing certificate of title.
The land is being offered for sale on an "as is, where is" basis, and Yellowhead
County makes no representation and gives no warranty whatsoever as to the adequacy
of services, soil conditions, land use districting, building and development conditions,
absence or presence of environmental contamination, vacant possession or the
developability of the subject land for any intended use by the Purchaser.
No bid will be accepted where the bidder attempts to attach conditions precedent to
specified by Yellowhead County.
Yellowhead County may, after the public auction, become the owner of any parcel of
land not sold at the public auction.
Terms and condition of the sale will be announced at the sale or may be obtained
from the undersigned.
Redemption may be effected by payment of all arrears of taxes and costs at any time
prior to the sale.
Dated at Edson, Alberta, August 5, 2008.
Barb Lyons, Director Corporate Services.
Municipal District of Smoky River No. 130
Notice is hereby given that, under the provisions of the Municipal Government Act,
the Municipal District of Smoky River No. 130 will offer for sale, by public auction,
in the Municipal Office, Falher, Alberta, on Friday, November 28, 2008, at 2:00 p.m.,
the following lands:
Pt. of Sec.
Sec.
Twp.
Rge.
Area
160.00 Acres
(C of T 802 102 091 B)
160.00 Acres
(C of T 052 504 213 003)
160.00 Acres
(C of T 052 504 213 004)
Pt. NE
10.00 Acres
(C of T 952 315 197)
Pt. NE
1.01 Acres
Plan 1229BV RLY 77
(C of T 002 267 135 020)
Pt. SW
18.36 Acres
Plan 1186BV RLY 78
(C of T 002 267 135 024)
Pt. NE
6.07 Acres
Plan 1186BV RLY 78
(C of T 002 267 135 022)
Pt. NE
13.71 Acres
Plan 1186BV RLY 78
(C of T 002 267 135 023)
Pt. NW
14854.00 Sq. Ft.
(C of T 002 267 135 013)
Pt. SE
31800.00 Sq. Ft.
Plan 2155KS RW 78
(C of T 002 267 135 005)
Pt. NW
14.22 Acres
Plan 631MC
(C of T 002 267 135 019)
Pt. SW
2.72 Acres
Plan 631MC RLY 78
(C of T 002 267 135 012)
Pt. NE
1.51 Acres
Plan 631MC RLY 78
(C of T 002 267 135 014)
Pt. SE
39642.00 Sq. Ft.
Plan 788MC RW 78
(C of T 002 267 135 009)
Pt. SW
43124.00 Sq. Ft.
Plan 1454EO RLY 78
(C of T 002 267 135 001)
Pt. SE
3.62 Acres
Plan 2033ET RLY 78
(C of T 002 267 135 007)
Pt. NE
4.52 Acres
Plan 2034ET RLY 78
(C of T 002 267 135 017)
Pt. NW
7.14 Acres
(C of T 002 267 135 004)
Pt. NE
6534.00 Sq. Ft.
Plan 3375EU
(C of T 002 267 135)
Pt. SE
2.58 Acres
Plan 2032ET RLY 78
(C of T 002 267 135 011)
Each parcel will be offered for sale, subject to a reserve bid and to the reservations
and conditions contained in the existing certificate of title.
The Municipal District of Smoky River No. 130 may, after the public auction,
become the owner of any parcel of land not sold at the public auction.
Terms: Cash or certified cheque. 10 % deposit and balance within 30 days of the date
of the public auction. G.S.T. will apply on properties sold at the public auction.
Redemption may be effected by payment of all arrears of taxes and costs at any time
prior to the sale.
Dated at Falher, Alberta, September 2, 2008.
Lucien G. Turcotte, Municipal Administrator.
______________
Town of Beaverlodge
Notice is hereby given that, under the provisions of the Municipal Government Act,
the Town of Beaverlodge will offer for sale, by public auction, in the Council
Chambers, at the Municipal Office, Beaverlodge, Alberta, on Wednesday, October
29, 2008, at 10:30 a.m., the following lands:
Lot
Block
Plan
C. of T. or Linc
729E0
0017 631 714
Each parcel will be offered for sale, subject to a reserve bid and to the reservations
and conditions contained in the existing certificate of title.
The Town of Beaverlodge may, after the public auction, become the owner of any
parcel of land not sold at the public auction.
Terms: Cash
Redemption may be effected by payment of all arrears of taxes and costs at any time
prior to the sale.
Dated at Beaverlodge, Alberta, September 3, 2008.
Ivan Hegland, Administrator.
______________
Town of Provost
Notice is hereby given that, under the provisions of the Municipal Government Act,
the Town of Provost will offer for sale, by public auction, in the Town of Provost
Administration Office, 4904 - 51 Avenue, Provost, Alberta, on Thursday, November
13, 2008, at 9:00 a.m., the following lands:
Item Title
Legal Description
Plan; Block; Lot
Street Address
Reserve Bid
912 049 507
683NY;34;20
5516-50 Street
$159,793.00
042 380 725
75MC;C;1
5223-49 Avenue
$35,773.00
042 380 987
75MC;C;2
5219-49 Avenue
$12,215.00
Each parcel will be offered for sale, subject to a reserve bid and to the reservations
and conditions contained in the existing certificate of title.
The land is being offered for sale on an "as is, where is" basis, and the Town of
Provost makes no representation and gives no warranty whatsoever as to the adequacy
of services, soil conditions, land use districting, building and development conditions,
absence or presence of environmental contamination, or the developability of the
subject land for any intended use by the Purchaser.
The Town of Provost may, after the public auction, become the owner of any parcel
of land not sold at the public auction.
Terms: Cash or Certified Cheque. Minimum 10% down payment, non refundable,
payable the day of the sale. Balance due within 10 days from the date of auction.
Redemption may be effected by payment of all arrears of taxes and costs at any time
prior to the sale.
Dated at Provost, Alberta, August 26, 2008.
Judy Larson, Administrator.
____________
Town of Stettler
Notice is hereby given that, under the provisions of the Municipal Government Act,
the Town of Stettler will offer for sale, by public auction, in the Town of Stettler
Council Chambers, 4840 - 50 Street, Stettler, Alberta, on Tuesday, October 28, 2008,
at 1:00 p.m., the following lands:
Lot
Block
Plan
C. of T.
5128KS
4427AJ
942167901+1
Each parcel will be offered for sale, subject to a reserve bid and to the reservations
and conditions contained in the existing certificate of title.
The land is being offered for sale on an "as is, where is" basis, and the Town of
Stettler makes no representation and gives no warranty whatsoever as to the adequacy
of services, soil conditions, land use districting, building and development conditions,
absence or presence of environmental contamination, or the developability of the
subject land for any intended use by the Purchaser.
No bid will be accepted where the bidder attempts to attach conditions precedent to
those specified by the Town. No further information is available at the auction
regarding the lands to be sold.
The Town of Stettler may, after the public auction, become the owner of any parcel of
land not sold at the public auction.
Terms: Cash or Certified Cheque.
Redemption may be effected by payment of all arrears of taxes and costs at any time
prior to the sale.
Dated at Stettler, Alberta, September 15, 2008.
Greg Switenky,
Director of Finance & Administration.
Village of Hughenden
Notice is hereby given that, under the provisions of the Municipal Government Act,
the Village of Hughenden will offer for sale, by public auction, at the Village Office,
210 - 3rd Avenue, Hughenden, Alberta, on Wednesday, November 12, 2008, at 10:00
a.m., the following lands:
Lot
Block
Plan
Roll
C. of T.
6-7-8
655Z
Each parcel will be offered for sale, subject to a reserve bid and to the reservations
and conditions contained in the existing certificate of title.
The land is being offered for sale on an "as is, where is" basis, and the Village of
Hughenden makes no representation and gives no warranty whatsoever as to the
adequacy of services, soil conditions, land use districting, building and development
conditions, absence or presence of environmental contamination, or the developability
of the subject land for any intended use by the Purchaser.
No bid will be accepted where the bidder attempts to attach conditions precedent to
those specified by the Village of Hughenden. No further information is available at
the auction regarding the lands to be sold.
The Village of Hughenden may, after the public auction, become the owner of any
parcel of land not sold at the public auction.
Terms: Cash or Certified cheque. A 10% deposit is payable upon the acceptance of
the bid at public auction. The balance of the accepted bid is due within thirty days
from the auction or the deposit will be forfeited and the Village will consider the next
bid.
Redemption may be effected by payment of all arrears of taxes and costs at any time
prior to the sale.
Dated at Hughenden, Alberta, August 28, 2008.
Trudy Martineau, Chief Administrative Officer.
______________
Village of Warner
Notice is hereby given that, under the provisions of the Municipal Government Act,
the Village of Warner will offer for sale, by public auction, at the Village Office, 210
- 3rd Avenue, Warner, Alberta, on Friday, October 24, 2008, at 10:00 a.m., the
following lands:
Lot
Block
Plan
C. of T.
7-12
6442Y
951 280 877
27-29
4068N
961 097 598
13-15
4068N
971 009 996
Each parcel will be offered for sale, subject to a reserve bid and to the reservations
and conditions contained in the existing certificate of title.
The land is being offered for sale on an "as is, where is" basis, and the Village of
Warner makes no representation and gives no warranty whatsoever as to the adequacy
of services, soil conditions, land use districting, building and development conditions,
absence or presence of environmental contamination, or the developability of the
subject land for any intended use by the Purchaser.
No bid will be accepted where the bidder attempts to attach conditions precedent to
those specified by the Village. No further information is available at the auction
regarding the lands to be sold.
The Village of Warner may, after the public auction, become the owner of any parcel
of land not sold at the public auction.
Terms: 10% deposit and balance within 90 days of Public Auction. All sales are
subject to current taxes. GST may apply on properties sold at the Public Auction.
Redemption may be effected by payment of all arrears of taxes and costs at any time
prior to the sale.
Dated at Warner, Alberta, August 30, 2008.
Kim Dalton, Chief Administrative Officer.
NOTICE TO ADVERTISERS
The Alberta Gazette is issued twice monthly, on the 15th and last day.
Notices and advertisements must be received ten full working days before the
date of the issue in which the notices are to appear. Submissions received after
that date will appear in the next regular issue.
Notices and advertisements should be typed or written legibly and on a sheet separate
from the covering letter. An electronic submission by email or disk is preferred.
Email submissions may be sent to the Editor of The Alberta Gazette at
albertagazette@gov.ab.ca. The number of insertions required should be specified and
the names of all signing officers typed or printed. Please include name and complete
contact information of the individual submitting the notice or advertisement.
Proof of Publication: Statutory Declaration is available upon request.
A copy of the page containing the notice or advertisement will be mailed to each
advertiser without charge.
The dates for publication of Tax Sale Notices in The Alberta Gazette are as follows:
Issue of
Earliest date on which
sale may be held
September 30
November 10
October 15
November 25
October 31
December 11
November 15
December 26
November 29
January 8
December 15
January 25
December 31
February 10
January 15
February 25
January 31
March 13
February 14
March 27
February 28
April 10
March 14
April 25
The charges to be paid for the publication of notices, advertisements and documents
in The Alberta Gazette are:
Notices, advertisements and documents that are 5 or fewer pages $20.00
Notices, advertisements and documents that are more than 5 pages $30.00
Please add 5% GST to the above prices (registration number R124072513).
PUBLICATIONS
Annual Subscription (24 issues) consisting of:
Part I/Part II, and annual index - Print version $150.00
Part I/Part II, and annual index - Electronic version $75.00
Alternatives:
Single issue (Part I and
Part II) $10.00
Annual Index to
Part I or
Part II $5.00
Alberta Gazette Bound
Part I $140.00
Alberta Gazette Bound Regulations $92.00
Please note: Shipping and handling charges apply for orders outside of Alberta.
The following shipping and handling charges apply for the Alberta Gazette:
Annual Subscription - Print version $40.00
Individual Gazette Publications $6.00 for orders $19.99 and under
Individual Gazette Publications $10.00 for orders $20.00 and over
Please add 5% GST to the above prices (registration number R124072513).
Copies of Alberta legislation and select government publications are available from:
Alberta Queen's Printer
Main Floor, Park Plaza
10611 - 98 Avenue
Edmonton, Alberta T5K 2P7
Phone: 780-427-4952
Fax: 780-452-0668
(Toll free in Alberta by first dialing 310-0000)
qp@gov.ab.ca
www.gov.ab.ca/qp
Cheques or money orders (Canadian funds only) should be made payable to the
Minister of Finance and Enterprise. Payment by Visa and MasterCard is also
accepted. No orders will be processed without payment.