Emissions Regulations (N.S. Reg. 260/2009) (just regulations regs envgreenhouse.htm)
N.S. Reg. 260/2009
Nova Scotia — Regulations
This consolidation is unofficial and is for reference only.
For the official version of the regulations, consult the original documents on file with the Registry of Regulations , or refer to the Royal Gazette
Part II .
Regulations are amended frequently.
Please check the list of Regulations by Act to see if there are any recent amendments to these regulations filed with the Registry that are not yet included in this consolidation.
Although every effort has been made to ensure the accuracy of this electronic version, the Registry of Regulations assumes no responsibility for any discrepancies that may have resulted from reformatting.
This electronic version is copyright © 2011, Province of Nova Scotia , all rights reserved. It is for your personal use and may not be copied for the purposes of resale in this or any other form.
Greenhouse Gas Emissions Regulations
made under subsection 28(6) and
Section 112 of the
Environment Act
S.N.S. 1994-95, c. 1
O.I.C. 2009-341 (August 14, 2009), N.S. Reg. 260/2009
as amended to O.I.C. 2013-332 (September 10, 2013), N.S. Reg. 305/2013
Citation
1 These regulations may be cited as the Greenhouse Gas Emissions Regulations .
Definitions
2 In these regulations,
“Act” means the Environment Act ;
“compliance period” means a multi-year period prescribed in
Section 4 for which an
emission cap has been specified in
Section 4;
“emission cap” means the maximum total greenhouse gas emissions specified for a
compliance period for all facilities in the Province as set out in
Section 4, for the
purpose of reducing the total amount of greenhouse gases emitted from all facilities
in the Province;
“facility” means any building, structure, generation unit, equipment or stationary
item that is located on a single site, or on contiguous or adjacent sites that function as
a single integrated site for supplying electricity for sale, and that emits greenhouse
gases;
“facility owner” means any person who owns, operates or is responsible for a
facility, but does not include an individual employee;
“generation unit” means a combustion unit generating heat, steam or another form of
energy for the purposes of supplying electricity that is delivered on the Provincial
power grid;
“greenhouse gases” means the greenhouse gases listed in Table 1 of
Schedule A;
“global warming potential” means the 100-year global warming potential amount for
a greenhouse gas as listed in the applicable notice with respect to reporting of
greenhouse gases issued by the federal Minister of the Environment under subsection
46(1) of the Canadian Environmental Protection Act , 1999 (Canada) and published
in the Canada Gazette;
Definition replaced: O.I.C. 2013-332, N.S. Reg. 305/2013.
“ISO” means the International Organization for Standardization;
Definition added: O.I.C. 2013-332, N.S. Reg. 305/2013.
“ISO 14064-3" means ISO standard ISO 14064-3, “Greenhouse gases—Part 3:
Specification with guidance for the validation and verification of greenhouse gas
assertions”, as supplemented, amended, added to, replaced or superseded;
Definition added: O.I.C. 2013-332, N.S. Reg. 305/2013.
“ISO 14065" means ISO standard 14065, “Greenhouse gases—Requirements for
greenhouse gas validation and verification bodies for use in accreditation or other
forms of recognition”, as supplemented, amended, added to, replaced or superseded;
Definition added: O.I.C. 2013-332, N.S. Reg. 305/2013.
“low-emissions electricity” means electric energy produced from any source of
renewable energy, including any of the following:
(
i) solar energy,
(ii) wind energy,
(iii) biomass that has been harvested in a sustainable manner,
Subclause (iii) amended: O.I.C. 2013-332, N.S. Reg. 305/2013.
(iv) run-of-the-river hydroelectric energy,
(
v) ocean-powered energy,
(vi) tidal energy,
(vii) wave energy,
(viii) landfill gas,
(ix) liquid biofuel and other biogas energy,
(
x) nuclear power,
(xi) large hydro;
“new transmission incentive” means an increase in the emission cap for a
compliance period granted in accordance with
Section 7 in return for eligible
investments made by a facility owner.
Application of regulations
3 These regulations apply to any facility located in the Province that emits greater than
10 000 metric tonnes of carbon dioxide equivalent (10 kt CO 2 eq) greenhouse gases in a
calendar year.
Compliance periods and emission caps
(1) The compliance periods, the calendar years covered by the periods and the
corresponding total emission caps for all facilities in the Province are as set out in the
following table:
Compliance
Period
Calendar Years
Emission Cap for All
Facilities in the Province
(million tonnes CO 2 eq)
2010, 2011
19.22
(cumulative total)
2012, 2013
18.5
(cumulative total)
2014, 2015, 2016
26.32
(cumulative total)
2017, 2018, 2019
24.06
(cumulative total)
7.5
2021, 2022, 2023, 2024
27.5
(cumulative total)
2026, 2027, 2028, 2029
21.5
(cumulative total)
4.5
Subsection 4(1) amended: O.I.C. 2013-332, N.S. Reg. 305/2013.
(2) The emission caps must be met and each facility owner must ensure that the
emission caps are met.
(3) A facility owner must coordinate with other facility owners to reduce greenhouse gas
emissions and must implement measures to meet the emission caps.
(4) The Minister may allocate a maximum greenhouse gas emission to an individual
facility but the allocated maximum must not increase the total amount of greenhouse
gases specified in an emission cap.
Annual report
(1) Starting in the year 2009, and for every calendar year thereafter, a facility owner
must submit an annual report to the Minister no later than March 31 of the following
year.
(2) An annual report must include all of the following information about all of the
facility owner’s facilities:
(
a) the legal name of the facility owner;
(
b) the name and location of each of the facilities;
(
c) the National Pollutant Release Inventory identification number for each of the
facilities;
(
d) the name, position, mailing address and telephone number of the person
submitting the report;
(
e) the name, position, mailing address and telephone number of the authorized
signing officer certifying the statement as required under subsection (3);
(
f) the total quantity in metric tonnes of direct emissions from each facility and the
generation units;
(
g) the total quantity in metric tonnes of direct emissions of carbon dioxide from
each facility and the generation units of all of the following:
(
i) greenhouse gases and global warming potentials,
(ii) carbon dioxide,
(iii) methane and nitrous oxide,
(iv) sulphur hexafluoride, hydrofluorocarbons and perfluorocarbons by
individual species;
(
h) the method of estimation used to determine the quantities of emissions
reported, chosen from the following:
(
i) monitoring,
(ii) direct measurement,
(iii) mass balance,
(iv) emission factors,
(
v) engineering estimates;
(ha) the total quantity of each type of fuel used in the facility owner’s facilities;
Clause 5(2)(ha) added: O.I.C. 2013-332, N.S. Reg. 305/2013.
(
i) any information required by the Minister to determine compliance with these
regulations.
(3) An annual report must include a statement signed by an authorized signing officer on
behalf of the facility certifying that the information submitted in the report is true,
accurate and complete.
Compliance period report
(1) In this Section, “verifier” means an independent third party that meets all of the
following criteria:
(
a) it is accredited to meet the requirements of ISO 14065 by a member of the
International Accreditation Forum; and
(
b) it consists of accounting and financial auditing expertise and engineering and
environmental assessment expertise.
Subsection 6(1) replaced: O.I.C. 2013-332, N.S. Reg. 305/2013.
(2) A facility owner must submit a compliance period report to the Minister for each
compliance period, no later than March 31 of the year following the end of the
compliance period.
(3) A compliance period report must include all of the following information about all
of a facility owner’s facilities:
(
a) a
summary of the total greenhouse gas emissions produced over the
compliance period;
(
b) any new transmission incentives approved for the compliance period;
(
c) an assessment by a verifier of the total emissions produced over the
compliance period, as required by subsection (4).
(4) A facility owner must have a verifier assess, to a reasonable level of assurance in
accordance with ISO 14064-3, the total emissions produced over a compliance
period and must provide the verifier with any information or documentation that
relates to the assessment and allow the verifier to access any facility owned or
operated by the facility owner to do any of the following:
(
a) collect information used to calculate the greenhouse gas emissions;
(
b) take samples of any energy sources used to generate electricity;
(
c) take samples of emissions;
(
d) examine and collect documentation related to any energy sources purchased to
generate electricity.
Subsection 6(4) amended: O.I.C. 2013-332, N.S. Reg. 305/2013.
New transmission incentive
(1) Subject to subsection (6), a facility owner may apply to the Minister for a new
transmission incentive for a compliance period no later than 6 months before the end
of the compliance period to which it will apply.
(2) An application for a new transmission incentive must include documentation
demonstrating the facility owner has invested or will invest in new transmission
capacity that has or will increase the facility owner’s ability to move electrical power
generated in the Province by sources of low-emissions electricity.
(3) The amount of a new transmission incentive must be calculated in accordance with
the following scale of transmission investment costs:
Compliance
Period
Investment Cost of
Transmission Incentive per
Metric Tonne
Maximum Potential
Transmission Incentive (million
metric tonnes CO 2 eq)
$15
0.58
$25
0.56
$40
0.79
$60
0.72
(4) The amount allowed for a new transmission incentive will not be specified by the
Minister until documentation is provided that confirms the transmission investment
expenditure required by subsection (2).
(5) A new transmission incentive must be applied towards the emission cap for the
compliance period it was allowed for and cannot be carried over and applied to
subsequent emission caps.
(6) An application for a new transmission incentive may not be made for compliance
period number 5 (2020).
Penalties
8 Any fine imposed by a court for a contravention of these regulations must be designated to
be paid to the Nova Scotia Environmental Trust Fund.
Schedule A
Greenhouse Gases
Table 1: Greenhouse Gases Subject to Mandatory Reporting
Greenhouse Gas
Chemical formula
CAS Registry
Number
(see footnote 1)
Carbon dioxide
CO 2
124-38-9
Methane
CH 4
74-82-8
Nitrous oxide
N 2 O
10024-97-2
Sulphur hexafluoride
SF 6
2551-62-4
Hydrofluorocarbons (HFCs) :
HFC-23
CHF 3
75-46-7
HFC-32
CH 2 F 2
75-10-5
HFC-41
CH 3 F
593-53-3
HFC-43-10mee
C 5 H 2 F 10
138495-42-8
HFC-125
C 2 HF 5
354-33-6
HFC-134
C 2 H 2 F 4 (structure: CHF 2 CHF 2 )
359-35-3
HFC-134a
C 2 H 2 F 4 (structure: CH 2 FCF 3 )
811-97-2
HFC-143
C 2 H 3 F 3 (structure: CHF 2 CH 2 F)
430-66-0
HFC-143a
C 2 H 3 F 3 (structure: CF 3 CH 3 )
420-46-2
HFC-152a
C 2 H 4 F 2 (structure: CH 3 CHF 2 )
75-37-6
HFC-227ea
C 3 HF 7
431-89-0
HFC-236fa
C 3 H 2 F 6
690-39-1
HFC-245ca
C 3 H 3 F 5
679-86-7
Perfluorocarbons (PFCs) :
Perfluoromethane
CF 4
75-73-0
Perfluoroethane
C 2 F 6
76-16-4
Perfluoropropane
C 3 F 8
76-19-7
Perfluorobutane
C 4 F 10
355-25-9
Perfluorocyclobutane
c-C 4 F 8
115-25-3
Perfluoropentane
C 5 F 12
678-26-2
Perfluorohexane
C 6 F 14
355-42-0
1. The Chemical Abstracts Service (CAS) Registry Number is the property of the American Chemical Society
and any use or redistribution, except as required in supporting regulatory requirements and/or for reports to
the Government when the information and the reports are required by law or administrative policy, is not
permitted without the prior written permission of the American Chemical Society.