following regulations (N.S. Reg. 234/2024) (just regulations regs pupreprojects.htm)
N.S. Reg. 234/2024
Nova Scotia — Regulations
This consolidation is unofficial and is for reference only.
For the official version of the regulations, consult the original documents on file with the Office of the Registrar of Regulations , or refer to the Royal Gazette
Part II .
Regulations are amended frequently.
Please check the list of Regulations by Act to see if there are any recent amendments to these regulations filed with our office that are not yet included in this consolidation.
Although every effort has been made to ensure the accuracy of this electronic version, the Office of the Registrar of Regulations assumes no responsibility for any discrepancies that may have resulted from reformatting.
This electronic version is copyright ©
, Province of Nova Scotia , all rights reserved. It is for your personal use and may not be copied for the purposes of resale in this or any other form.
Prescribed Projects Regulations
made under
Section 118 of the
Public Utilities Act
R.S.N.S. 1989, c. 380
O.I.C. 2024-401 (effective October 24, 2024), N.S. Reg. 234/2024
Table of Contents
Please note: this table of contents is provided for convenience of reference and does not form part of the regulations.
Click here to go to the text of the regulations .
Citation
Definitions
Prescribed project under
Section 21B of Act
Citation
1 These regulations may be cited as the Prescribed Projects Regulations .
Definitions
2 In these regulations,
“Act” means the Public Utilities Act .
Prescribed project under
Section 21B of Act
(1) The NS-NB Reliability Intertie Project is prescribed as a project under
Section 21B
of the Act.
(2) The project includes all of the following:
(
a) designing, developing, engineering, procuring, constructing, owning,
operating and maintaining a new 345 kV transmission line, and the
associated station upgrades, which will traverse from Onslow, Nova Scotia,
to the New Brunswick border, and includes, without limitation, all
associated works, activities, infrastructure and rights of way;
(
b) funding the construction of and, in co-operation with New Brunswick
Power Corporation, designing, developing, engineering and procuring a new
345 kV transmission line, and the associated station upgrades, that New
Brunswick Power Corporation will own, operate and maintain at no
additional cost to Nova Scotia Power Incorporated and which will traverse
from the New Brunswick border to Salisbury, New Brunswick, and
includes, without limitation, all associated works, activities, infrastructure
and rights of way.
(3) Nova Scotia Power Incorporated is authorized to enter into an ownership
arrangement for the prescribed project with the Canada Infrastructure Bank through
which the Canada Infrastructure Bank may partially own and/or invest in the
ownership arrangement.
(4) In determining an ownership arrangement’s revenue requirement, the Energy
Board must consider all costs, charges and fees incurred by the ownership
arrangement in connection with the prescribed project.
Legislative History
Reference Tables
Prescribed Projects Regulations
N.S. Reg.
234/2024
Public Utilities Act
Note: The
information in these tables does not form part of the regulations and is
compiled by the Office of the Registrar of Regulations for reference only.
Source Law
The current consolidation of the Prescribed Projects Regulations made
under the Public Utilities Act includes all of the following regulations:
N.S.
Regulation
In force
date*
How in force
Royal Gazette
Part II Issue
234/2024
Oct 24, 2024
date specified
Nov 15, 2024
The following regulations are not
yet in force and are not included in the current consolidation:
N.S.
Regulation
In force
date*
How in force
Royal Gazette
Part II Issue
*See subsection 3(6) of the Regulations Act for
rules about in force dates of regulations.
Amendments by Provision
ad. = added
am. = amended
fc. = fee change
ra. = reassigned
rep. = repealed
rs . = repealed and substituted
Provision affected
How affected
..........................................................
Note that changes to headings are not
included in the above table.
Editorial Notes and Corrections
Note
Effective
date
Repealed and Superseded
N.S.
Regulation
Title
In force
date
Repealed
date
Note: Only
regulations that are specifically repealed and replaced appear in this
table. It may not reflect the entire
history of regulations on this subject matter.