NEWFOUNDLAND AND
LABRADOR
REGULATION 86/25
Newfoundland and Labrador Hydro - Exploits
Generation Assets Exemption Order
under the
Electrical Power Control Act, 1994
and the
Public Utilities Act
(O.C. 2025-159)
(Filed August 22, 2025)
Under the authority of
section 5.2 of the Electrical Power Control Act, 1994
and
section 4.1 of the Public Utilities Act,
the Lieutenant-Governor in Council makes the following Order.
Dated at St. Johns, June 18, 2025.
Denis Mahoney, K.C.
Clerk of the Executive Council
ORDER
Analysis
Short title
Definition
Exemption
Repeal
Short title
This Order may be cited as the Newfoundland and Labrador Hydro - Exploits Generation Assets Exemption Order.
86/25 s1
Back to Top
Definition
In this Order, "Exploits generation assets" means
(
a) the hydroelectric generation station and related facilities located at Bishop's Falls;
(
b) the hydroelectric generation station and related facilities located at Buchans;
(
c) the hydroelectric generation station and related facilities located at Grand Falls- Windsor;
(
d) the hydroelectric generation station and related facilities located at Star Lake;
(
e) the dams, dykes, control structures and other works required for the generation of power at the sites referred to in paragraphs (a), (b), (
c) and (d );
(
f) the transmission facilities necessary to deliver power generated at the sites referred to in paragraphs (a), (b), (
c) and (
d) to a suitable point of interconnection with existing transmission facilities; and
(
g) any other facilities and equipment necessary for the facilities, works or equipment referred to in paragraphs (
a) to (f).
86/25 s2
Back to Top
Exemption
Newfoundland and Labrador Hydro is
exempt from the Electrical Power Control Act, 1994
and the Public Utilities Act
for all aspects of its
activities pertaining to the Exploits generation assets.
86/25 s3
Back to Top
Repeal
The Newfoundland and Labrador Hydro-Exploits Generation Exemption Order , Newfoundland and Labrador Regulation 109/13, is repealed.
86/25 s4