Newfoundland and Labrador Hydro - Exploits Generation Assets Exemption Order

N.L.R. 86/25

Newfoundland and Labrador — Regulations

Newfoundland and Labrador Hydro - Exploits Generation Assets Exemption Order

N.L.R. 86/25

Newfoundland and Labrador — Regulations

This is an official version.

Copyright 2025: King's Printer,

St. John's, Newfoundland and Labrador, Canada

Important Information

(Includes details about the availability of printed and electronic versions of the Statutes.)

Table of Regulations

Main Site

How current is this regulation?

NEWFOUNDLAND AND

LABRADOR

REGULATION 86/25

Newfoundland and Labrador Hydro - Exploits

Generation Assets Exemption Order

under the

Electrical Power Control Act, 1994

and the

Public Utilities Act

(O.C. 2025-159)

(Filed August 22, 2025)

Under the authority of

section 5.2 of the Electrical Power Control Act, 1994

and

section 4.1 of the Public Utilities Act,

the Lieutenant-Governor in Council makes the following Order.

Dated at St. Johns, June 18, 2025.

Denis Mahoney, K.C.

Clerk of the Executive Council

ORDER

Analysis

Short title

Definition

Exemption

Repeal

Short title

This Order may be cited as the Newfoundland and Labrador Hydro - Exploits Generation Assets Exemption Order.

86/25 s1

Back to Top

Definition

In this Order, "Exploits generation assets" means

(

a) the hydroelectric generation station and related facilities located at Bishop's Falls;

(

b) the hydroelectric generation station and related facilities located at Buchans;

(

c) the hydroelectric generation station and related facilities located at Grand Falls- Windsor;

(

d) the hydroelectric generation station and related facilities located at Star Lake;

(

e) the dams, dykes, control structures and other works required for the generation of power at the sites referred to in paragraphs (a), (b), (

c) and (d );

(

f) the transmission facilities necessary to deliver power generated at the sites referred to in paragraphs (a), (b), (

c) and (

d) to a suitable point of interconnection with existing transmission facilities; and

(

g) any other facilities and equipment necessary for the facilities, works or equipment referred to in paragraphs (

a) to (f).

86/25 s2

Back to Top

Exemption

Newfoundland and Labrador Hydro is

exempt from the Electrical Power Control Act, 1994

and the Public Utilities Act

for all aspects of its

activities pertaining to the Exploits generation assets.

86/25 s3

Back to Top

Repeal

The Newfoundland and Labrador Hydro-Exploits Generation Exemption Order , Newfoundland and Labrador Regulation 109/13, is repealed.

86/25 s4

King's Printer

Document details

CollectionNewfoundland and Labrador — Regulations
CitationN.L.R. 86/25
Typeregulation
Volume / chapterN.L.R. 86/25
Languageen
Formathtm
SourcePROVINCIAL
Identifier18392e5c1d705d9f2e94970c660ed237678bddc3

Source file is stored in the law ingest library (htm).