General Regulations (N.S. Reg. 95/1999) (just regulations regs eiicode.htm)
N.S. Reg. 95/1999
Nova Scotia — Regulations
This consolidation is unofficial and is for reference only.
For the official version of the regulations, consult the original documents on file with the Office of the Registrar of Regulations , or refer to the Royal Gazette
Part II .
Regulations are amended frequently.
Please check the list of Regulations by Act to see if there are any recent amendments to these regulations filed with our office that are not yet included in this consolidation.
Although every effort has been made to ensure the accuracy of this electronic version, the Office of the Registrar of Regulations assumes no responsibility for any discrepancies that may have resulted from reformatting.
This electronic version is copyright ©
, Province of Nova Scotia , all rights reserved. It is for your personal use and may not be copied for the purposes of resale in this or any other form.
Electrical Code Regulations
made under
Section 6 of the
Electrical Installation and Inspection Act
R.S.N.S. 1989, c. 141
O.I.C. 1999-470 (effective October 4, 1999), N.S. Reg. 95/1999
amended to O.I.C. 2022-59 (effective March 1, 2022), N.S. Reg. 31/2022
Table of Contents
Please note: this table of contents is provided for convenience of reference and does not form part of the regulations.
Click here to go to the text of the regulations .
Citation
Interpretation
Adoption of Code
Permits and inspections
Electrical permits
Communications permits
Requirements of inspection departments
Inspection procedures of inspection department
Inspector qualifications
Permit fees
Electrical permit exemptions
Communications cabling permit exemptions
General permit exemptions
Approved equipment
Hazardous installations
Special permission
Citation
1 These regulations may be cited as the Electrical Code Regulations .
Interpretation
2 For the purpose of these regulations
“Act” means the Electrical Installation and Inspection Act ;
“Chief Inspector” means the Chief Inspector appointed under the Act and includes
any person who may exercise the powers of the Chief Inspector;
“Code” means the latest issue of the Canadian Electrical Code ,
Part I, published
by the Canadian Standards Association, the current issue of which is CSA
Standard C22.1-18 and as supplemented, amended or added to from time to time
by the Canadian Standards Association;
“communications permit” means a permit for the installation of a communication
system, as defined in the Code, including any associated cabling and hardware;
“communications technician” means a person who
(
i) holds a valid certificate of qualification in the communications
technician trade as defined in the Communications Technician Trade
Regulations made under the Apprenticeship and Trades
Qualifications Act , or
(ii) holds a certificate of qualification from another jurisdiction
recognized under
Section 42 of the Apprenticeship and Trades
Qualifications Act General Regulations made under the
Apprenticeship and Trades Qualifications Act ;
“communications technician trade” means the communications technician trade as
defined in the Communications Technician Trade Regulations made under the
Apprenticeship and Trades Qualifications Act ;
“construction electrician” means a person who
(
i) holds a valid certificate of qualification in the construction electrician
trade, or
(ii) holds a certificate of qualification from another jurisdiction
recognized under
Section 31 or 42 of the Apprenticeship and Trades
Qualifications Act General Regulations made under the
Apprenticeship and Trades Qualifications Act.
“construction electrician trade” means the construction electrician trade as defined
in the Construction Electrician Trade Regulations made under the Apprenticeship
and Trades Qualifications Act ;
“electrical permit” means a permit for an electrical installation as defined in the
Code but does not include installations that require a communications permit;
“final inspection” means an inspection performed by an inspection department to
ensure that an electrical installation, an alteration or addition to an electrical
installation, or any work associated with a communication system installation has
been completed and conforms to the Code, the Act and these regulations and is
safe and free of any fire or shock hazards;
“inspection department”, when used in the Code and these regulations, means a
public utility that supplies or will supply electric power or energy and grants
permits to contractors;
“maintenance permit” means a permit for electrical installation work of a routine
nature and connected with the maintenance or operation of an industrial,
commercial or other establishment;
“permit” means a communications permit, an electrical permit or a maintenance
permit; and
“special permission” when used in clause (1) of
Section 2-030 (Deviation or
Postponement) of the Code means the written authority of the Chief Inspector.
Adoption of Code
(1) Except as varied or modified by these regulations or where inconsistent with the
Act, the Code is hereby adopted and constituted as regulations with respect to
matters enumerated in
Section 6 of the Act in addition to any other regulations
made under
Section 6 of the Act.
(2) The date of coming into force of the Code, including any supplement, amendment
or addition to the Code, shall be the first clear day of the fourth month following
the month of publication of the Code or any supplement, amendment or addition to
it.
4 Where a fire door of Class A Rating (3 hours fire resistance) is required under the Code,
the fire door shall have a 3-point latching.
5 [repealed]
6 [repealed]
Permits and inspections
(1) No person shall perform electrical or communications work without first obtaining
a permit.
(2) A contractor shall notify the inspection department when electrical or
communications work is ready for inspection, and upon notification the inspection
department shall complete all necessary inspections as required by the Act and
these regulations.
(3) In addition to other requirements under the Act and these regulations, a contractor
shall notify the inspection department when electrical or communications work is
ready for a final inspection, and upon notification the inspection department shall
perform a final inspection and issue a final inspection report.
(4) Subsection (3) does not apply to an industrial, commercial or other establishment
for which a maintenance permit under subsection 8(2) has been issued to the
contractor.
(5) An inspection department that issues a maintenance permit of the kind described in
subsection 8(2) to a contractor for an industrial, commercial or other establishment
shall, at least once in the year for which the permit is issued, perform a limited
inspection of the establishment, with the scope of the inspection to be determined
by the inspection department.
Electrical permits
(1) An inspection department shall not issue an electrical permit except to an electrical
contractor, as defined in the Code, who
(
a) is or employs a construction electrician; or
(
b) is or employs a construction electrician or an industrial electrician and is the
owner or occupant of any industrial, commercial or other establishment
where electrical installation work of a routine nature and connected with the
maintenance or operation of the establishment is required to be performed at
frequent intervals.
(2) A maintenance permit issued to an electrical contractor pursuant to clause (1)(
b) shall be for a term of 1 year provided that the owner or occupant keeps a record of
all work performed and the record is made available for inspection by an
inspection department.
(3) [repealed]
Communications permits
9 An inspection department may only issue a communications permit to a communications
technician or a construction electrician.
Requirements of inspection departments
(1) An inspection department that issues a permit or completes an inspection of an
electrical or a communications installation, or issues a maintenance permit or
completes an annual maintenance inspection, shall maintain a record of the permit
or inspection in electronic or written format for review and audit by the Chief
Inspector.
(2) Where an inspection department issues a permit to its subsidiary or a closely
related entity or performs an inspection pursuant to that permit, it shall maintain a
record of the permit or inspection in electronic or written format for review and
audit by the Chief Inspector.
Inspection procedures of inspection department
10A
(1) Upon request by the Chief Inspector, an inspection department shall provide, in a
manner determined by the Chief Inspector, a written report outlining its inspection
procedures for review and approval by the Chief Inspector.
(2) An inspection department shall only follow those inspection procedures that are
currently approved.
Inspector qualifications
10B An inspection department shall ensure to the satisfaction of the Chief Inspector that an
inspector in its employ
(
a) has at least the minimum qualifications required, as set by the Chief
Inspector in consultation with the inspection department;
(
b) performs inspections consistent with their qualifications; and
(
c) has upgrade and refresher training as required.
Permit fees
11 An inspection department shall charge permit fees and may require the person who
requests an inspection of an electrical or a communications installation to pay fees in
accordance with the scale of fees approved by the Utility and Review Board.
Electrical permit exemptions
12 An electrical permit is not required for the following categories of installations, provided
that the work is performed by a construction electrician who maintains a record of the
work completed for inspection by an inspection department or the Chief Inspector:
(
a) the replacement or repair of wiring devices or electrical equipment with an
electrical rating no greater than 30 A, 120 V to ground or 50 A, 240 V and
that are not in a location referred to in Sections 18 and 20 of the Code;
(
b) the installation of one 15 A to 30 A, 120 V branch circuit or one 15 A to
50 A, 240 V branch circuit that is not in a location referred to in
Section 18
and 20 of the Code;
(
c) the replacement of light fixtures in a dwelling unit;
(
d) the replacement of motors; and
(
e) wiring supplied from an approved class II transformer in a single dwelling,
provided it is not part of a lighting installation.
Communications cabling permit exemptions
13 A communications permit is not required for the following categories of
communications systems installations, provided that the work complies with the Code
and is performed by a communications technician or a construction electrician who
maintains a record of the work completed for inspection by an inspection department or
the Chief Inspector:
(
a) an installation that does not exceed 6 cabling drops and is not in a location
referred to in Sections 18 or 20 of the Code;
(
b) a relocation of 20 communication outlets where the installation does not
involve any new cable runs or penetrate any existing fire wall.
General permit exemptions
14 The following types of installations are exempt from the permit requirements of these
regulations:
(
a) communications and cable TV installations in a single dwelling as defined
by the Code;
(
b) security and intrusion alarm systems; and
(
c) installation of signs and outline lighting where the work is completed
according to
Section 34 of the Code by a certified electrical sign
manufacturer acceptable to the Chief Inspector.
Approved equipment
(1) No corporation, company, or person shall sell, have for sale, display, rent, lease,
advertise, install or use any electrical device, appliance or equipment unless it is
certified as approved equipment, as defined in the Code, by a certification
organization acceptable to the Chief Inspector.
(2) The Chief Inspector may approve the installation and use of electrical equipment in
accordance with the Code.
(3) If, in the opinion of the Chief Inspector, electrical equipment poses a fire or shock
hazard, the Chief Inspector may order the disconnection of the equipment.
(4) Where the Chief Inspector finds uncertified electrical equipment stocked by a
retailer, wholesale supplier, distributor, manufacturer or contractor, the Chief
Inspector may order the retailer, wholesale supplier, distributor, manufacturer or
contractor, within a reasonable period of time, to
(
a) provide the Chief Inspector with a list of persons to whom the equipment
has been supplied;
(
b) remove from shelves and discontinue selling, renting or leasing the
equipment; and
(
c) recall the uncertified electrical equipment from the persons to whom it was
supplied.
(5) Where an inspection department or the Chief Inspector finds uncertified electrical
equipment installed in an electrical installation, the inspection department or the
Chief Inspector may order the disconnection of the equipment.
(6) An inspection department or the Chief Inspector shall tag uncertified equipment to
warn persons that the equipment must not be connected to an electrical supply.
Hazardous installations
16 Where an inspection department or the Chief Inspector finds a hazardous installation, the
inspection department or the Chief Inspector may
(
a) order or effect the disconnection of the installation; and
(
b) take whatever action the inspection department or the Chief Inspector
considers necessary to ensure safety in the area of the installation.
Special permission
17 The Chief Inspector may grant special permission in writing to a contractor for a
deviation or postponement under the Code.
Legislative History
Reference Tables
Electrical Code Regulations
N.S. Reg.
95/1999
Electrical Installation and Inspection Act
Note: The
information in these tables does not form part of the regulations and is
compiled by the Office of the Registrar of Regulations for reference only.
Source Law
The current consolidation of the Electrical Code Regulations made under the Electrical Installation and Inspection Act includes all of the following regulations:
N.S.
Regulation
In force
date*
How in force
Royal Gazette
Part II Issue
95/1999
Oct 4, 1999
and Mar 1, 2000 1
date specified
Oct 22, 1999
139/2001
Oct 1, 2000
date specified
Nov 30, 2001
174/2003
Oct 10, 2003
date specified
Oct 31, 2003
64/2004
Apr 1, 2004
date specified
Apr 6, 2004
99/2007
Apr 1, 2007
date specified
Mar 30, 2007
156/2008
Apr 1, 2008
date specified
Apr 18, 2008
98/2009
Apr 1, 2009
date specified
Apr 14, 2009
70/2011
Apr 1, 2011
date specified
Apr 15, 2011
96/2013
Apr 1, 2013
date specified
Apr 12, 2013
95/2015
Apr 1, 2015
date specified
Apr 8, 2015
31/2022
Mar 1, 2022
date specified
Mar 11, 2022
The following regulations are not yet in force and are
not included in the current consolidation:
N.S.
Regulation
In force
date*
How in force
Royal Gazette
Part II Issue
*See subsection 3(6) of the Regulations Act for
rules about in force dates of regulations.
Amendments by Provision
ad. = added
am. = amended
fc. = fee change
ra. = reassigned
rep. = repealed
rs . = repealed and substituted
Provision affected
How affected
2 ........................................................
am. 31/2022 (clause letters removed)
2, defn . of “Code” .......................
am. 174/2003, 31/2022
2, defn . of
“communications cabling specialist” .................................
rep. 31/2022
2, defn . of
“communications certificate” ................................
rep. 31/2022
2, defn . of
“communications permit” ..................................................
rs . 31/2022
2, defn . of
“communications technician” ...............................
ad. 31/2022
2, defn . of
“communications technician trade” ......................
ad. 31/2022
2, defn . of “construction
electrician” ..................................................
rs . 31/2022
2, defn . of “construction
electrician trade” ........................................
ad. 31/2022
2, defn . of “final
inspection” .......
ad. 174/2003 ; am. 31/2022
5 ........................................................
rep. 31/2022
5(2)(c) ..........................................
fc. 64/2004, 99/2007, 156/2008, 98/2009, 70/2011,
96/2013, 95/2015
5(9) ...............................................
fc. 64/2004, 99/2007, 156/2008, 98/2009, 70/2011,
96/2013, 95/2015
5(11) .............................................
rep. 139/2001
6 ........................................................
rep. 31/2022
7 ........................................................
ra. as 7(1) 174/2003
7(1) ..............................................
ra. from 7 174/2003 ; am. 31/2022
7(2) ..............................................
ad. 174/2003 ; am. 31/2022
7(3) ..............................................
ad. 174/2003 ; am. 31/2022
7(4) ..............................................
ad. 174/2003
7(5) ..............................................
ad. 174/2003
8(1)(a) ...............................................
am. 31/2022
8(2) ...................................................
am. 174/2003
8(3) ...................................................
rep. 174/2003
9 ........................................................
rs . 31/2022
10A-10B ...........................................
ad. 174/2003
13 ......................................................
rs . 31/2022
17 ......................................................
am. 31/2022
Schedule A .......................................
fc. 99/2007
Note that changes to headings are not
included in the above table.
Editorial Notes and Corrections:
Note
Effective
date
Clause (
b) to O.I.C. 1999-470 approves the regulations
effective Oct 4, 1999, except for s. 9(2) of the regulations, which is
effective on Mar 1, 2000.
The reference in s. 11 to the Utility and Review
Board should be read as a reference to the Energy Board under the Energy
and Regulatory Boards Act , S.N.S. 2024, c. 2, Sch A, in accordance with s.
5 and s. 41 of that Act effective on proclamation (N.S. Reg 233/2024) .
Apr 1, 2025
Repealed and Superseded:
N.S.
Regulation
Title
In force
date
Repealed
date
Note: Only
regulations that are specifically repealed and replaced appear in this
table. It may not reflect the entire
history of regulations on this subject matter.