British Columbia Gazette Part II — B.C. Reg. 370/2002
B.C. Reg. 370/2002
British Columbia — Gazette
Copyright © Queen's Printer,
Victoria, British Columbia, Canada
Licence
Disclaimer
Volume 45, No. 24
B.C. Reg. 370/2002
The British Columbia Gazette,
Part II
December 31, 2002
B.C. Reg. 370/2002, deposited December 19, 2002, pursuant to the ENVIRONMENTAL ASSESSMENT ACT [Sections 5 and 59]. Order in Council 1156/2002, approved and ordered December 18, 2002.
On the recommendation of the undersigned, the Administrator, by and with the advice and consent of the Executive Council, orders that, effective December 30, 2002,
(
a) the Environmental Assessment Act , S.B.C. 2002, c. 43, except
section 52, is brought into force by this regulation, and
(
b) the Reviewable Projects Regulation in the attached
Schedule is made. — S. HAGEN, Minister of Sustainable Resource Management; C. CLARK, Presiding Member of the Executive Council .
Schedule
REVIEWABLE PROJECTS REGULATION
Contents
Part 1 —
Interpretation
Definitions
How to calculate total waste discharge
Reviewable projects prescribed
What assessment of construction includes
Part 2 — Industrial Projects
Definitions for
Part 2
Criteria for proposed modifications of industrial projects
Tables 1 to 5
Part 3 — Mine Projects
Definitions for
Part 3
Criteria for proposed modifications of mine projects
Table 6
Part 4 — Energy Projects
Definitions for
Part 4
Whether modification results in significant adverse effects
Tables 7 and 8
Part 5 — Water Management Projects
Definitions for
Part 5
Table 9
Part 6 — Waste Disposal Projects
Definitions for
Part 6
Criteria for proposed modifications of waste disposal projects
Tables 10 to 12
Part 7 — Food Processing Projects
Definitions for
Part 7
Criteria for proposed modifications of food processing projects
Table 13
Part 8 — Transportation Projects
Definitions for
Part 8
Table 14
Part 9 — Tourist Destination Resort Projects
Definitions for
Part 9
Table 15
Appendices 1 to 3
Part 1 —
Interpretation
Definitions
1 In this regulation:
"Act" means the Environmental
Assessment Act ;
"applicable table" , in relation to a
new project, a modification to an existing facility or a dismantling and
abandonment of an existing facility, means whichever of Tables 1 to 15, set out
in this regulation, lists in Column 1 the category of facility within which the
new or existing facility fits;
"CWF" means the contaminant weighting
factor set out in Appendix 1 for a permitted contaminant;
"existing facility" means a constructed
or substantially constructed facility, whether or not operating, but does not
include a facility that has permanently ceased operations and has been
abandoned;
"facility" means one or more physical
works or structures that have been or will be constructed as part of a project;
"foreshore" means land in tidal or
non-tidal areas that, as a result of the rise and fall of the sea or water in an
estuary or stream between the natural boundary and the ordinary low water mark,
is periodically covered by salt water or fresh water and periodically exposed;
"natural boundary" has the same meaning
as in the Land Act ;
"new facility" means a proposed
facility, or a facility for which construction has begun but which has not
started regular operations;
"SIC code" means the code assigned to a
category of projects under the "Standard Industrial Classification",
1980, Fourth Printing March 1989, published by the Minister of Supply and
Services (Canada);
"stream" has the same meaning as in the
Water Act ;
"submerged land" means land that lies
below the ordinary low water mark of a stream, marine coast line or estuary and
that is normally covered by salt water or fresh water;
"waste discharge" means the quantity of
gaseous, liquid or solid waste contaminants introduced into the environment from
a facility.
How to calculate total waste
discharge
(1) The total waste discharge for a facility is
the quantity of waste that is permitted under the Waste Management Act to
be discharged from the facility.
(2) The total waste discharge for a facility is
calculated by adding the products obtained by multiplying the CWF for each
permitted contaminant by the permitted discharge rate, in tonnes or other unit
of measurement specified in Appendix 1, for that contaminant.
Reviewable projects prescribed
(1) A new project that is in a category
described in Column 1 of the applicable table is prescribed as a reviewable
project if it meets the criteria set out opposite in Column 2.
(2) A proposed modification of an existing project that
is in a category described in Column 1 of the applicable table is prescribed as
a reviewable project if it meets the criteria set out opposite in Column 3.
(3) A proposed dismantling and abandonment of an
existing facility that is in a category described in Column 1 of the applicable
table is prescribed as a reviewable project if it meets the criteria set out
opposite in Column 4.
(4) For the purposes of subsections (1) and (2), if a
new project or the modification of an existing project requires construction of
a facility before regular operations can proceed, the time when the new project
or the modification must meet the criteria is by the time the construction is
completed.
What assessment of construction
includes
(1) Subject to subsection (2) and unless
otherwise indicated in the applicable table,
(
a) an assessment of a new project includes the
assessment of the construction, operation, dismantling and abandonment phases of
the project, and
(
b) an assessment of the modification of an existing
project includes the assessment of the construction, operation, dismantling and
abandonment phases of the modified portion of the existing project.
(2) If an applicable table includes a Column 4 setting
out the criteria that, when met, result in the dismantling and abandonment of an
existing project in that category being prescribed as a reviewable project, an
assessment of the construction of a new project in that category or of the
modification of an existing project in that category does not include an
assessment of the dismantling and abandonment phases for projects in that
category.
Part 2 — Industrial Projects
Definitions for
Part 2
5 In this Part:
"integrated paper or paperboard
manufacturing" means a plant that produces pulp as part of the process
for producing paper or paperboard;
"non-integrated paper or paperboard
manufacturing" means a plant that does not produce pulp as part of the
process for producing paper or paperboard;
"threshold A" means the criteria
described in
section 6 (1);
"threshold B" means the criteria
described in
section 6 (2);
"threshold C" means the criteria
described in
section 6 (3);
"threshold D" means the criteria
described in
section 6 (4).
Criteria for proposed
modifications of industrial projects
(1) In this Part, threshold A is met for a
proposed modification of an existing facility if
(
a) the existing facility, were it a new facility in the
same category as the existing facility as described in Column 1 of the
applicable table, would meet the criteria set out opposite in Column 2, and
(
b) the modification will result in an increase of at
least 30% in the total waste discharge from the facility.
(2) In this Part, threshold B is met for a proposed
modification of an existing facility if
(
a) the existing facility, were it a new facility in the
same category as the existing facility as described in Column 1 of the
applicable table, would meet the criteria set out opposite in Column 2, and
(
b) the modification will result in
(
i) an increase in the production capacity of the
facility of at least 35% but less than 50%, and
(ii) a decrease in the total waste discharge from the
facility of less than 10%.
(3) In this Part, threshold C is met for a proposed
modification of an existing facility if
(
a) the existing facility, were it a new facility in the
same category as the existing facility as described in Column 1 of the
applicable table, would not meet the criteria set out opposite in Column 2, and
(
b) the modification will result in
(
i) an increase in the production capacity of the
facility of at least 35%,
(ii) a facility that, were it a new facility in the same
category as the existing facility as described in Column 1 of the applicable
table, would meet the criteria set out opposite in Column 2, and
(iii) a decrease in the total waste discharge from the
facility of less than 10%.
(4) In this Part, threshold D is met for a proposed
modification of an existing facility if
(
a) the existing facility, were it a new facility in the
same category as the existing facility as described in Column 1 of the
applicable table, would meet the criteria set out opposite in Column 2, and
(
b) the modification will result in an increase in the
production capacity of the facility of at least 50%.
Table 1 — Organic and Inorganic
Chemical Industry
Column 1
Column 2
Column 3
Project Category
New Project
Modification of Existing Project
Industrial Inorganic Chemical Industries not
elsewhere classified — SIC code 3711
Industrial Organic Chemical Industries not elsewhere
classified — SIC code 3712
Chemical Fertilizer and Fertilizer Materials
Industry — SIC code 3721
Mixed Fertilizer Industry — SIC code 3722
Other Agricultural Chemical Industries — SIC code
Plastic and Synthetic Resin Industry — SIC code
Paint and Varnish Industry — SIC code 3751
Other Chemical Products Industries not elsewhere
classified — SIC code 3799
Criteria:
(1) A new manufacturing facility
(
a) that has a production
capacity of > 100 000 tonnes/year, or
(
b) that
(
i) produces materials classified
under the Transportation of Dangerous Goods Act (Canada) as
"Explosives", "Flammable Solids",
"Corrosives", "Poisonous (toxic) and Infectious
Substances" or "Oxidizing Substances and Organic
Peroxides", and
(ii)
has a production capacity of > 5 000 tonnes/year.
Criteria:
(1) Modification of an existing facility that
meets
(
a) Threshold A,
(
b) Threshold B,
(
c) Threshold C, or
(
d) Threshold D.
Table 2 — Primary Metals Industry
Column 1
Column 2
Column 3
Project Category
New Project
Modification of Existing Project
Ferro-alloys Industry — SIC code 2911
Other Primary Steel Industries — SIC code
Primary Production of Aluminum Industry — SIC code
Other Primary Smelting & Refining of Non-Ferrous
Metal Industries — SIC code 2959
Criteria:
(1) Subject to subsection (2), a new manufacturing
facility, regardless of size.
(2) If refining processes, precious metal distillate
processes or ore roasting processes are integrated with ore milling
operations at, or in the vicinity of, a mine site and are dedicated to
the mining operations at the mine site, those processes are not
reviewable as part of a project that is a reviewable project under
subsection (1).
Criteria:
(1) Subject to subsection (2), modification of an
existing facility that meets
(
a) Threshold A,
(
b) Threshold B, or
(
c) Threshold D.
(2) If refining processes, precious metal distillate
processes or ore roasting processes are integrated with ore milling
operations at, or in the vicinity of, a mine site and are
dedicated to the mining operations at the mine site, those processes are
not reviewable as part of a project that is a reviewable project under
subsection (1).
Table 3 — Non-metallic Mineral Products Industries
Column 1
Column 2
Column 3
Project Category
New Project
Modification of Existing Project
Hydraulic Cement Industry — SIC code 3521
Primary Glass and Glass Containers Industry
— SIC code 3561
Lime Industry — SIC code 3581
Criteria:
(1) A new manufacturing facility with a production
capacity of > 100 000 tonnes/year.
Criteria:
(1) Modification of an existing facility that
meets
(
a) Threshold A,
(
b) Threshold B,
(
c) Threshold C, or
(
d) Threshold D.
Asbestos Products Industry
— SIC code 3592
Criteria:
(2) A new manufacturing facility, regardless of size.
Criteria:
(2) Modification of an existing facility that meets
(
a) Threshold A,
(
b) Threshold B, or
(
c) Threshold D.
Table 4 — Forest Products Industries
Column 1
Column 2
Column 3
Project Category
New Project
Modification of Existing Project
Pulp manufacturing facility in one of the following
SIC codes:
(
a) Pulp Industry – SIC code
2711;
(
b) Newsprint Industry –
SIC code 2712;
(
c) Paperboard Industry –
SIC code 2713;
(
d) Other Paper Industries– SIC code 2719.
Criteria:
(1) A new manufacturing facility, regardless
of size.
Criteria:
(1) Modification of an existing facility that
(
a) meets Threshold A, as it
applies to a modification in the facility's pulp production capability,
(
b) meets Threshold B, as it
applies to an increase in the facility's pulp production capability,
(
c) meets Threshold D, as it
applies to an increase in the facility's pulp production capability, or
(
d) results in creation of a new
paper or paperboard manufacturing capability with a production capacity
of > 250 000 tonnes/year of paper or paperboard.
Integrated Paper or Paperboard manufacturing
facility in one of the following SIC codes:
(
a) Pulp Industry – SIC code
2711;
(
b) Newsprint Industry –
SIC code 2712;
(
c) Paperboard Industry – SIC
code 2713;
(
d) Other Paper Industries –
SIC code 2719.
Criteria:
(1) A new manufacturing facility, regardless of size.
Criteria:
(1) Modification of an existing facility that
(
a) meets Threshold A, as it
applies to a modification in the facility's pulp production capability,
(
b) meets Threshold B, as it
applies to an increase in the facility's pulp production capability,
(
c) meets Threshold D, as it
applies to an increase in the facility's pulp production capability, or
(
d) results in an increase in
paper or paperboard production capacity of > 250 000
tonnes/year.
Non-integrated Paper and Paperboard manufacturing
facility in one of the following SIC codes:
(
a) Pulp Industry – SIC code
2711;
(
b) Newsprint Industry –
SIC code 2712;
(
c) Paperboard Industry – SIC
code 2713;
(
d) Other Paper Industries –
SIC code 2719.
Criteria:
(1) A new manufacturing facility with a production
capacity of > 250 000 tonnes/year.
Criteria:
(1) Modification of an existing facility that results in
(
a) for an existing project with
a production capacity of > 250 000 tonnes/year, an
increase in paper or paperboard production capacity of > 250 000
tonnes/year, or
(
b) the creation at the existing
facility of a new pulp production capability.
Paper de-inking plants
Criteria:
(1) A new facility, regardless of size.
Criteria:
(1) Modification of an existing facility that meets
Threshold A.
Wood Preservation Industry– SIC code 2591
Criteria:
(1) A new manufacturing facility with a production
capacity of > 25 000 m 3 /year.
Criteria:
(1) Modification of an existing facility that meets
(
a) Threshold A,
(
b) Threshold B,
(
c) Threshold C, or
(
d) Threshold D.
Building Board Industry –
SIC code 2714 – excluding medium-density fibreboard
Criteria:
(1) A new manufacturing facility with a production
capacity of > 100 000 tonnes/year.
Criteria:
(1) Modification of an existing facility that meets
(
a) Threshold A,
(
b) Threshold B,
(
c) Threshold C, or
(
d) Threshold D.
Sawmill and Planing Mill Products Industry (except
shingles and shakes) – SIC code 2512
Criteria:
(1) A new manufacturing facility with a production
capacity of > 750 000 board feet/day.
Criteria:
(1) Modification of an existing facility that meets
(
a) Threshold A,
(
b) Threshold B,
(
c) Threshold C, or
(
d) Threshold D.
Hardwood Veneer and Plywood Industry – SIC code
Softwood Veneer and Plywood Industry – SIC code
Criteria:
(1) A new facility manufacturing
(
a) plywood or both plywood and veneer with a
production capacity of > 170 000 m 3 /year, or
(
b) veneer, but not plywood, with a production
capacity of > 250 000 m 3 /year.
Criteria:
(1) Modification of an existing facility that meets
(
a) Threshold A,
(
b) Threshold B,
(
c) Threshold C, or
(
d) Threshold D.
Particle Board Industry –
SIC code 2592
Wafer Board Industry –
SIC code 2593
Medium-density Fibreboard plants
Criteria:
(1) A new manufacturing facility with a production
capacity of > 150 000 m 3 /year.
Criteria:
(1) Modification of an existing facility that meets
(
a) Threshold A,
(
b) Threshold B,
(
c) Threshold C, or
(
d) Threshold D.
Table 5 — Other Industries
Column 1
Column 2
Column 3
Project Category
New Project
Modification of Existing Project
Pharmaceutical and Medicine Industry – SIC code 3741
Criteria:
(1) A new manufacturing facility with a production capacity of
(a)
> 50 tonnes/year
of biopharmaceutical products, or
(b)
> 200 tonnes/year
of non-biopharmaceutical products.
Criteria:
(1) Modification of an existing facility that
meets
(
a) Threshold A,
(
b) Threshold B,
(
c) Threshold C, or
(
d) Threshold D.
Man-made Fibre and Filament Yarn Industry – SIC
code 1811
Contract Textile Dyeing and Finishing Industry – SIC code 1992
Criteria:
(1) A new manufacturing facility with a production capacity > 15 000 tonnes/year.
Criteria:
(1) Modification of an existing facility that meets
(
a) Threshold A,
(
b) Threshold B,
(
c) Threshold C, or
(
d) Threshold D
Tire and Tube Industry – SIC code 1511
Criteria:
(1) A new facility, regardless of size.
Criteria:
(1) Modification of an existing facility that meets
(
a) Threshold A,
(
b) Threshold B, or
(
c) Threshold D.
Leather Tanneries – SIC code 1711
Criteria:
(1) A new manufacturing facility with a production capacity of > 500 000 m 2 /year.
Criteria:
(1) Modification of an existing facility that meets
(
a) Threshold A,
(
b) Threshold B,
(
c) Threshold C, or
(
d) Threshold D.
Lead-acid Battery Plants
Criteria:
(1) A new facility manufacturing lead-acid
batteries, regardless of size.
Criteria:
(1) Modification of an existing facility that meets
(
a) Threshold A,
(
b) Threshold B, or
(
c) Threshold D.
Part 3 — Mine Projects
Definitions for
Part 3
7 In this Part:
"clean coal" means coal that requires
processing in a coal preparation plant before it is transported from the mine
site for marketing or testing;
"industrial minerals" means the
substances listed in Appendix 3;
"mine" has the same meaning as in the Mines
Act ;
"mineral mine" means a mine where a
mineral, as defined in the Mineral Tenure Act, is or could be mined, but
does not include a mine where industrial minerals are or could be mined;
"off-shore mine" means a platform,
artificial island or other physical work or structure, including any associated
facilities, that is intended to be used, or is used, for the exploration for or
production of a mineable substance from the foreshore or submerged land along a
marine coastline, or from an off-shore site located in salt water;
"pay-dirt" means mined placer gravel
that is or could be processed in a sluice box, wash plant or other device for
extracting precious metals;
"permitted for disturbance" in relation
to land, means that the land would be or has been disturbed by mining activities
approved under a Mines Act permit or another permit that was issued as
part of a previous mine approval;
"placer mineral mine" means a mine
where a placer mineral, as defined in the Mineral Tenure Act, is or could
be mined;
"quarry" means a quarry or other
operation where construction stone, an industrial mineral or another substance
is or could be mined, but does not include a mineral mine, placer mineral mine
or coal mine or a sand or gravel pit;
"raw coal" means coal that does not
require processing in a coal preparation plant before it is transported from the
mine site for marketing or testing;
"threshold E" means the criteria
described in
section 8 (1);
"threshold F" means the criteria
described in
section 8 (2);
"threshold G" means the criteria
described in
section 8 (3).
Criteria for proposed
modifications of mine projects
(1) In this Part, threshold E is met for a
proposed modification of an existing facility if
(
a) the existing facility, were it a new facility in the
same category as the existing facility as described in Column 1 of the
applicable table, would meet the criteria set out opposite in Column 2, and
(
b) the modification will result in the disturbance of
(
i) at least 750 hectares of land that was not
previously permitted for disturbance, or
(ii) an area of land that was not previously permitted
for disturbance and that is at least 50% of the area of land that was previously
permitted for disturbance at the existing facility.
(2) In this Part, threshold F is met for a proposed
modification of an existing facility if
(
a) the existing facility, were it a new facility in the
same category as the existing facility as described in Column 1 of the
applicable table, would meet the criteria set out opposite in Column 2, and
(
b) the modification will result in the disturbance of
an area of land that was not previously permitted for disturbance and that is at
least 35% of the area of land that was previously permitted for disturbance at
the existing facility.
(3) In this Part, threshold G is met for a proposed
modification of an existing facility if
(
a) the existing facility, were it a new facility in the
same category as the existing facility as described in Column 1 of the
applicable table, would meet the criteria set out opposite in Column 2, and
(
b) the executive director has determined under
subsection (4) that the modification has the potential to result in a
significant adverse environmental, economic, social, heritage or health effect.
(4) For the purposes of a modification of an existing
facility in the off-shore mine project category, the executive director must
determine whether the modification has the potential to result in a significant
adverse environmental, economic, social, heritage or health effect.
Table 6 — Mine Projects
Column 1
Column 2
Column 3
Project Category
New Project
Modification of Existing Project
Coal Mines — SIC code 063
Criteria:
(1) A new mine facility that, during operation, will
have a production capacity of > 250 000 tonnes/year of
clean coal or raw coal or a combination of both clean coal and raw coal.
Criteria:
(1) Modification of an existing mine facility that meets Threshold E.
Mineral Mines
Criteria:
(1) A new mine facility that, during operations, will
have a production capacity of > 75 000 tonnes/year of
mineral ore.
Criteria:
(1) Modification of an existing mine facility that
meets Threshold E.
Sand and Gravel Pits — SIC code 082
Criteria:
(1) A new pit facility that will have a production capacity of
(a)
> 500 000 tonnes/year of excavated sand or gravel or both sand and gravel during at least one year of its operation, or
(
b) over a period of < 4 years of operation, > 1 000 000 tonnes of excavated sand or gravel or both sand and gravel.
Criteria:
(1) Modification of an existing pit facility that meets Threshold F.
Placer Mineral Mines
Criteria:
(1) A new mine facility that, during operations, will have a production capacity of > 500 000 tonnes/year of pay-dirt.
Criteria:
(1) Modification of an existing pit facility that meets Threshold F.
Construction Stone and Industrial Mineral Quarries
Criteria:
(1) A new quarry facility or other operation that
(
a) involves the removal of construction stone or industrial minerals or both,
(
b) is regulated as a mine under
the Mines Act , and
(
c) during operations, will have a production capacity of > 250 000 tonnes/year of quarried product.
Criteria:
(1) Modification of an existing mine facility that meets Threshold E.
Off-shore Mines
Criteria:
(1) A new off-shore mine facility.
Criteria:
(1) Modification of an existing facility that meets Threshold G.
Part 4 — Energy Projects
Definitions for
Part 4
9 In this Part:
"another power plant" means a facility
for the generation of electricity from the sun, the wind or the movement of
tidal water, and includes all associated structures, machinery, appliances,
fixtures, equipment and storage and handling facilities;
"electric transmission line" means a
transmission line of 500 kV or higher voltage;
"energy" and "energy
resource" have the same meaning as in
Part 2 of the Utilities
Commission Act ;
"energy storage facility" means a place
where an energy resource is accumulated or stored in bulk as part of the process
of being transported or distributed, but does not include
(
a) a compressor, separator or dehydrator if the
compressor, separator or dehydrator is used as a part of the production of
natural gas or oil, or both, from a well, or
(
b) underground facilities used in conjunction with the
production of natural gas or oil, or both, from a well and located at the
wellhead;
"energy use project" means a mill,
factory, plant, smelter, oil refinery, metal refinery or other undertaking or
works, other than a natural gas processing plant, designed to use, convert or
process an energy resource or coal, ethanol, methanol, hydrogen or methyl
tertiary butyl ether (MTBE), or any combination of them, at the rate of 3 PJ or
more per year, and for the purpose of this definition, an energy resource, other
than electricity, is used, converted or processed at that rate if it is of a
quantity capable of yielding that amount of energy by combustion;
"hydroelectric power plant" means a
facility for the generation of electricity from the motion of water, or from the
position or potential motion of water, and includes associated dams, diversion
works, water conduits and all structures, machinery, appliances, fixtures and
equipment;
"natural gas processing plant" means a
facility for processing natural gas by removing from it natural gas liquids,
sulphur or substances other than water so that the natural gas meets
transmission pipeline specifications;
"off-shore oil or gas facility" means a
platform, artificial island or other physical work or structure, including any
associated facilities, that is intended to be used, or is used, for the
exploration for or production of oil or natural gas from the foreshore or
submerged land along a marine coastline, or from an off-shore site located in
salt water;
"process" means any process designed to
remove elements or compounds, whether hydrocarbon or non-hydrocarbon, from gas,
and includes absorption, adsorption or refrigeration, but does not include field
processing which normally takes place on or near the extraction site, such as
natural pressure reduction, mechanical separation, heating, cooling,
dehydration, and compression;
"thermal electric power plant" means a
facility for generating electricity from the combustion of natural gas, oil,
petroleum products, coal, wood, wood waste or plant products or from the use of
geothermal energy or from nuclear fission or fusion, and includes all associated
structures, machinery, appliances, fixtures and equipment, and storage and
handling facilities;
"transmission pipeline" means a pipe or
system of pipes through which natural gas, oil or solids, or a liquid or gas
derived from natural gas, oil or solids, whether in suspension or some other
form, is transported, and includes compressor or pumping facilities and other
equipment related to the operation of the transmission pipeline, associated
terminal or storage facilities.
Whether modification results in
significant adverse effects
10 For the purpose of determining whether the
modification of an offshore oil or gas facility is prescribed as a reviewable
project, the executive director must determine whether the modification has the
potential to result in a significant adverse environmental, economic, social,
heritage or health effect.
Table 7 — Electricity Projects
Column 1
Column 2
Column 3
Column 4
Project Category
New Project
Modification of Existing Project
Dismantling and Abandonment of
Existing Project
Power Plants
Criteria:
(1) A new facility with a rated nameplate capacity of > 50 MW of electricity that is
(
a) a hydroelectric power plant,
(
b) a thermal electric power plant, or
(
c) another power plant.
Criteria:
(1) Modification of an existing facility that results in the facility having a rated nameplate capacity that has increased by > 50 MW of electricity.
Criteria:
(1) Dismantling or abandonment of an existing dam facility associated with an existing hydroelectric power plant of any size, if the dam is, or was, permitted under the Water Act to impound > 10 million m 3 of water.
Electric Transmission Lines
Criteria:
(1) Subject to subsection (2), a new electric transmission line of > 40 km in length on a new right of way.
(2) Assessment of a new facility under subsection (1) does not include the dismantling and abandonment phases.
Criteria:
(1) Subject to subsections (2) and (3), modification of an existing facility if
(
a) the existing facility, were it a new facility, would meet the criteria set out opposite in Column 2, and
(
b) the modification results in
(
i) the rebuilding of all or part of the facility, the replacement of the existing towers and the rebuilt facility having a voltage of > 500 kV.
(ii)
the addition of one or more electric transmission lines within the right of way occupied by the existing facility, or
(iii)
construction of an extension to the facility having a voltage of > 500 kV.
(2) The following types of modifications are not reviewable under subsection (1) (b) (i):
(
a) relocation of existing transmission lines within an existing right of way;
(
b) increasing the capacity of existing transmission lines by conductor or tower modifications or replacements, or by changes to the terrain within an existing right of way;
(
c) relocation of transmission line rights of way and associated transmission facilities, provided they follow the existing general corridor and constitute a length of < 40 km;
(
d) replacement of towers or electric lines or other repairs to an existing facility primarily for maintenance purposes.
(3) Assessment of the modification of an existing facility under subsection (1) does not include the dismantling and abandonment phases.
Table 8 — Petroleum and Natural Gas Projects
Column 1
Column 2
Column 3
Project Category
New Project
Modification of Existing Project
Energy Storage Facilities
Criteria:
(1) Subject to subsection (2), a new energy storage facility with the capability to store an energy resource in a quantity that can yield by combustion > 3 PJ of energy.
(2) Development or use of naturally occurring underground reservoirs for the storage of petroleum or natural gas is not reviewable under subsection (1) if those reservoirs are located in the Western Canadian Sedimentary Basin of North East British Columbia within the map groups and blocks set out in Appendix 2.
Criteria:
(1) Subject to subsections (2) and (3), modification of an existing facility if
(
a) the existing facility, were it a new facility, would meet the criteria set out opposite in Column 2, and
(
b) the modification results in an increase in the capability of the facility to store an energy resource, other than electricity, by a quantity that can yield by combustion > 3 PJ of energy.
(2) Replacement of project components solely for maintenance purposes is not reviewable under subsection (1).
(3) Development or use of naturally occurring underground reservoirs for the storage of petroleum or natural gas is not reviewable under subsection (1) if those reservoirs are located in the Western Canadian Sedimentary Basin of North East British Columbia within the map groups and blocks set out in Appendix 2.
Facilities that use, convert or process energy
Criteria:
(1) A new facility that is an energy use project.
Criteria:
(1) Modification of an existing facility if
(
a) the existing facility, were
it a new facility, would meet the criteria set out opposite in Column 2,
and
(
b) the modification results in
an increase by > 3 PJ/year in the rate at which an energy
resource, other than electricity, or coal, ethanol, methanol, hydrogen
or MTBE, or any combination of them, is used, converted or processed.
Natural Gas Processing Plants
Criteria:
(1) A new natural gas processing plant facility
(
a) that
(
i) has the design capacity to process natural gas at a rate of < 5.634 million m 3 /day, and
(ii)
will result in sulphur emissions to the atmosphere of > 2 tonnes/day, or
(
b) that has the design capacity to process natural gas at a rate of > 5.634 million m 3 /day.
Criteria:
(1) Modification of an existing facility if
(
a) the existing facility, were
it a new facility, would meet the criteria set out opposite in Column 2,
and
(
b) the modification results in
(
i) an incremental increase in sulphur emissions to the atmosphere of > 2 tonnes/day, or
(ii)
a change in the design capacity of the facility resulting in an incremental increase of > 5.634 million m 3 /day in the capacity of the facility to process natural gas.
Transmission Pipelines
Criteria:
(1) Subject to subsection (2), a new transmission pipeline facility with
(
a) a diameter of > 114.3 mm and a length of > 60 km,
(
b) a diameter of between > 114.3 and > 323.9 mm and a length of > 50 km, or
(
c) a diameter of > 323.9 mm and a length of > 40 km.
(2) Assessment of a new facility under subsection (1) does not include the dismantling and abandonment phases.
Criteria:
(1) Subject to subsections (2) and (3), modification of an existing facility if
(
a) the existing facility, were it a new facility, would meet the criteria set out opposite in Column 2, and
(
b) the modification results in
(
i) for a facility that when modified will have a diameter of > 114.3 mm,
(
A) rebuilding over a length of > 60 km, or
(
B) an extension of > 60 km in length,
(ii)
for a facility that when modified will have a diameter of between > 114.3 and > 323.9 mm,
(
A) rebuilding over a length of > 50 km, or
(
B) an extension of > 50 km in length, or
(iii)
for a facility that when modified will have a diameter of > 323.9 mm,
(
A) rebuilding over a length of > 40 km, or
(
B) an extension of > 40 km in length.
(2) Assessment of the modification of an existing facility described in subsection (1) does not include the dismantling and abandonment phases.
(3) Replacement of pipe primarily for maintenance or repair purposes is not reviewable under subsection (1).
Off-shore Oil or Gas Facilities
Criteria:
(1) A new off-shore oil or gas facility.
Criteria:
(1) Modification of an existing facility if
(
a) the existing facility, were it a new facility, would meet the criteria set out opposite in Column 2, and
(
b) the executive director has determined that the modification has the potential to result in a significant adverse environmental, economic, social, heritage or health effect.
Part 5 — Water Management Projects
Definitions for
Part 5
11 In this Part:
"hydroelectric power plant" has the
same meaning as in
Part 4;
"mine" has the same meaning as in the Mines
Act.
Table 9 — Water Management Projects
Column 1
Column 2
Column 3
Column 4
Project Category
New Project
Modification of Existing Project
Dismantling and Abandonment
of Existing Project
Dams
Criteria:
(1) Subject to subsections (2) and (3), a new dam facility that
(
a) is > 15 m high, or
(
b) under the Water Act , will be permitted to impound a reservoir containing > 10 million m 3 of water above the natural boundary of the streams that supply the water to the reservoir.
(2) For the purposes of subsection (1) (a), "height" and "dam" have the same meaning as in the British Columbia Dam Safety Regulation, B.C. Reg. 44/2000.
(3) The following are not reviewable under subsection (1):
(
a) a dam that is a tailings impoundment constructed and operated solely to serve a single mine;
(
b) a dam or reservoir that is associated with a hydroelectric power plant.
Criteria:
(1) Subject to subsection (2), modification of an existing facility if
(
a) the existing facility, were it a new facility, would meet the criteria set out opposite in Column 2, and
(
b) the modification results in an increase of the flooded area of the reservoir, as permitted under the Water Act , by > 20 hectares.
(2) The following are not reviewable under subsection (1):
(
a) a dam that is a tailings impoundment constructed and operated solely to serve a single mine;
(
b) a dam or reservoir that is associated with a hydroelectric power plant.
Criteria:
(1) Subject to subsection (2), dismantling or abandonment of an existing dam facility that is, or was, permitted under the Water Act to impound > 10 million m 3 of water.
(2) The following are not reviewable under subsection (1):
(
a) a dam that is a tailings impoundment constructed and operated solely to serve a single mine;
(
b) a dam or reservoir that is associated with a hydroelectric power plant.
Dykes
Criteria:
(1) A new dyke facility that protects from flooding an area of > 10 km 2 .
Criteria:
(1) Modification of an existing facility if
(
a) the existing facility, were it a new facility, would meet the criteria set out opposite in Column 2, and
(
b) the modification results in the raising of the entire length of the dyke.
Criteria:
(1) Dismantling or abandonment of an existing facility that, if it were a new facility, would meet the criteria set out opposite in Column 2.
Water Diversion Projects
Criteria:
(1) Subject to subsection (2), a facility incorporating new works that
(
a) are constructed for the diversion of water, and
(
b) under the Water Act , are permitted to divert water at a maximum rate of > 10 million m 3 /year.
(2) The following are not reviewable under subsection (1):
(
a) works for the diversion of water which have been authorized under
section 8 of the Water Act ;
(
b) works that are intended solely for the purposes of a tailings pond constructed and operated to serve a single mine;
(
c) a water diversion project that is associated with a hydroelectric power plant.
Criteria: either (1) or (2)
(1) Subject to subsection (3), modification of an existing facility if
(
a) the existing facility, were it a new facility, would meet the criteria set out opposite in Column 2, and
(
b) the modification results in an increase of > 35% in the maximum rate of diversion of water per year permitted under the Water Act .
(2) Subject to subsection (3), modification of an existing facility if
(
a) the existing facility, were it a new facility, would not meet the criteria set out opposite in Column 2, and
(
b) the modification results in
(
i) an increase of > 35% in the maximum rate of diversion of water per year permitted under the Water Act , and
(ii)
a maximum rate of diversion of water permitted under the Water Act that is or will be > 10 million m 3 /year.
(3) The following are not reviewable under subsection (1) or (2):
(
a) works for the diversion of water which have been authorized under
section 8 of the Water Act ;
(
b) works that are intended solely for the purposes of a tailings pond constructed and operated to serve a single mine;
(
c) a water diversion project that is associated with a hydroelectric power plant.
Criteria:
(1) Subject to subsection (2), dismantling or abandonment of existing works that, if they were a new facility, would meet the criteria set out opposite in Column 2.
(2) The following are not reviewable under subsection (1):
(
a) works for the diversion of water which have been authorized under
section 8 of the Water Act ;
(
b) works that are intended solely for the purposes of a tailings pond constructed and operated to serve a single mine;
(
c) a water diversion project that is associated with a hydroelectric power plant.
Groundwater Extraction Projects
Criteria:
(1) Subject to subsection (2), a new facility that
(
a) consists of one or more works for the extraction of groundwater to be used for the same project or where, in the reasonable opinion of the executive director, the works are so closely related they can be considered to form a single project,
(
b) is operated intermittently or continuously for > 1 year, and
(
c) is designed to be operated so that groundwater is extracted at a rate of > 75 litres/second.
(2) A facility for the extraction of groundwater solely for the following purposes is not reviewable under subsection (1):
(
a) providing groundwater data for an application for an environmental assessment certificate;
(
b) providing groundwater data, if the testing is conducted by or under the supervision of a person registered as a member of the Association of Professional Engineers and Geoscientists of British Columbia with competency in the field of hydrogeology.
Criteria: either (1) or (2)
(1) Subject to subsection (3), modification of an existing facility if
(
a) the existing facility, were it a new facility, would meet the criteria set out opposite in Column 2, and
(
b) the modification results in
(
i) an increase of > 35% over the current extraction rate at which the facility has been designed to be operated, or
(ii)
an increase of > 75 litres/second over the current extraction rate at which the facility has been designed to be operated.
(2) Subject to subsection (3), modification of an existing facility if
(
a) the existing facility, were it a new facility, would meet the criteria set out in Column 2, subsection (1) (
a) and (b), but would not meet the criteria set out opposite in Column 2, subsection (1) (c), and
(
b) the modification results in
(
i) an increase of > 35% over the current extraction rate at which the facility has been designed to be operated, and
(ii)
an extraction rate of > 75 litres/second.
(3) A facility for the extraction of groundwater solely for the following purposes is not reviewable under subsection (1) or (2):
(
a) providing groundwater data for an application for an environmental assessment certificate;
(
b) providing groundwater data, if the testing is conducted by or under the supervision of a person registered as a member of the Association of Professional Engineers and Geoscientists of British Columbia with competency in the field of hydrogeology.
Shoreline Modification Projects
Criteria:
(1) Subject to subsections (2) and (3), a new facility, or a new activity unrelated to the construction of a new facility, that
(
a) results in changes in or about a stream, marine coastline or estuary, and
(
b) entails dredging, filling or other direct physical disturbance of
(i)
> 1 000 m of linear shoreline, or
(ii)
> 2 hectares of foreshore or submerged land, or a combination of foreshore and submerged land, below the natural boundary of a stream, marine coastline or estuary.
(2) Area flooded is not included in the calculation of area directly disturbed under subsection (1) (b) (ii).
(3) The following are not reviewable under subsection (1):
(
a) periodic shoreline cleanup projects;
(
b) periodic maintenance dredging of the foreshore or submerged land, or a combination of foreshore and submerged land, below the natural boundary of a stream, marine coastline or estuary;
(
c) a ferry terminal or marine port facility.
Criteria: either (1) or (2)
(1) Subject to subsections (3) and (4), modification of an existing facility if
(
a) the existing facility, were it a new facility, would meet the criteria set out opposite in Column 2, and
(
b) the modification results in an increase of > 35% in
(
i) the length of linear shoreline which is directly disturbed, or
(ii)
the area of foreshore or submerged land, or a combination of foreshore and submerged land, below the natural boundary of a stream, marine coastline or estuary that is directly disturbed.
(2) Subject to subsections (3) and (4), modification of an existing facility if
(
a) the existing facility, were it a new facility, would not meet the criteria set out opposite in Column 2, but has resulted in changes in or about a stream, marine coastline or estuary, and
(
b) the modification results in an increase of > 35% in
(
i) the length of linear shoreline which is directly disturbed, or
(ii)
the area of foreshore or submerged land, or a combination of foreshore and submerged land, below the natural boundary of a stream, marine coastline or estuary which is directly disturbed, and
(
c) the modification also results in changes in or about a stream, coastline or estuary which in total equal or exceed the criteria described in Column 2, subsection (1) (b) (
i) or (ii) for a new facility.
(3) Area flooded is not included in the calculation of area directly disturbed under subsection (1) (b) (ii) and (2) (b) (ii).
(4) The following are not reviewable under subsection (1) or (2):
(
a) periodic shoreline cleanup projects;
(
b) periodic maintenance dredging of the foreshore or submerged land, or a combination of foreshore and submerged land, below the natural boundary of a stream, marine coastline or estuary;
(
c) a ferry terminal or marine port facility.
Criteria:
(1) Dismantling or abandonment of an existing shoreline modification facility that, if it were a new facility, would meet the criteria set out opposite in Column 2.
Part 6 — Waste Disposal Projects
Definitions for
Part 6
12 In this Part:
"biomedical waste" means waste that is
generated by
(
a) human or animal health care facilities,
(
b) medical or veterinary teaching establishments,
(
c) health care teaching establishments,
(
d) clinical testing and research laboratories, or
(
e) facilities involved in the production or testing of
vaccines,
and includes
(
f) human anatomical waste consisting of human tissues,
organs and body parts, but does not include teeth, hair or nails,
(
g) animal waste consisting of all animal tissues,
organs, body parts, carcasses, bedding, fluid blood and blood products, items
saturated or dripping with blood, body fluids contaminated with blood, and body
fluids removed for diagnosis or removed during surgery, treatment or autopsy,
unless a trained person, as defined in the Transportation of Dangerous Goods
Regulations, (Canada), has certified that the waste does not contain the viruses
and agents listed in Risk Group IV, as that group is defined in those
regulations, but does not include teeth, hair, nails, hooves or feathers,
(
h) microbiology laboratory waste consisting of
laboratory cultures, stocks of specimens of micro-organisms, live or attenuated
vaccines, human or animal cell cultures used in research, and laboratory
material that has come into contact with any of these,
(
i) human blood and body fluid waste consisting of human
fluid blood and blood products, items saturated or dripping with blood, body
fluids contaminated with blood, and body fluids removed for diagnosis during
surgery, treatment or autopsy, but does not include urine or feces, and
(
j) clinical and laboratory waste sharps consisting of
needles, syringes, blades or laboratory glass capable of causing punctures or
cuts,
but does not include waste that
(
k) originates from animal husbandry,
(
l) is of household origin,
(
m) is controlled in accordance with the Health of
Animals Act (Canada),
(
n) is generated in food production, general building
maintenance and office administration activities of those facilities referred to
in paragraphs (
a) to (e), or
(
o) is microbiology laboratory waste, human blood and
body fluid waste or waste sharps after these wastes have been disinfected or
decontaminated;
"incinerator" , "land
treatment" , "long term storage" , "mobile
facility" , "off site facility" , "secure
landfill" , "short term storage" , "surface
impoundment" , "thermal treatment" , "treatment"
and "waste pile" have the same meanings as in the Special Waste
Regulation, B.C. Reg. 63/88;
"municipal liquid waste" , "municipal
solid waste" , "special waste" and "waste"
have the same meanings as in the Waste Management Act ;
"threshold H" means the criteria
described in
section 13 (1);
"threshold I" means the criteria
described in
section 13 (2).
Criteria for proposed
modifications of waste disposal projects
(1) In this Part, threshold H is met for a
proposed modification of an existing facility if,
(
a) the existing facility, were it a new facility in the
same category as the existing facility as described in Column 1 of the
applicable table, would meet the criteria set out opposite in Column 2, and
(
b) the modification will result in an increase of at
least 30% in the total waste discharge of the facility.
(2) In this Part, threshold I is met for a proposed
modification of an existing facility if,
(
a) the existing facility, were it a new facility in the
same category as the existing facility as described in Column 1 of the
applicable table, would not meet the criteria set out opposite in Column 2, and
(
b) the modification will result in
(
i) a facility that if it were a new facility would meet
the criteria set out opposite in Column 2, and
(ii) an increase of at least 30% in the total waste
discharge from the facility.
Table 10 — Special Waste Management Projects
Column 1
Column 2
Column 3
Project Category
New Project
Modification of Existing Project
Special Waste Facilities
Criteria:
(1) Subject to subsections (2) and (3), a proposal
(
a) for the storage, treatment or disposal of biomedical waste or special waste if the proposal
(
i) entails facilities of a type specified under subsection (2), and
(ii)
is for
(
A) construction of a new facility, or
(
B) modification of an existing facility for which the storage, treatment or disposal of biomedical waste or special waste has not previously been permitted under the Waste Management Act, or
(
b) to use special waste at an existing off-site facility whose principal function is not waste management, and that has not previously been permitted to use that type of special waste under the Waste Management Act , if there will be
(
i) off-site use of special waste by combustion or thermal processes, or
(ii)
off-site use of special waste other than by combustion or thermal processes if
(
A) one type of special waste listed in Column 1 of Table 1 of
Schedule 6 of the Special Waste Regulation, B.C. Reg. 63/88, is to be used and the daily maximum use is at least 100 times greater than the storage permit quantity listed in Column III of that Table, or
(
B) more than one type of special waste listed in Column 1 of Table 1 of
Schedule 6 of the Special Waste Regulation, B.C. Reg. 63/88, is to be used and the cumulative maximum design use is > 100 000 kg/day or > 100 000 litres/day, as appropriate.
(2) Subsection (1) (
a) applies to the following types of facilities:
(
a) an off-site incinerator or thermal treatment facility, excluding
(
i) a thermal treatment facility that utilizes non-combustion technologies for the disinfection or sterilization of biomedical waste, or
(ii)
an incinerator or thermal treatment facility that uses combustion or other related technologies for the treatment or disposal of biomedical waste, and that has a capacity of < 5 tonnes/day;
(
b) an off-site long term storage facility or secure landfill;
(
c) an off-site treatment facility, other than an incinerator, thermal treatment facility or land treatment facility,
(
i) if one type of special waste listed in Column I of Table 1 of
Schedule 6 of the Special Waste Regulation, B.C. Reg. 63/88, is to be treated, and the daily maximum design treatment capacity is at least 100 times greater than the storage permit quantity listed in Column III of that Table, or
(ii)
if more than one type of special waste listed in Column I of Table 1 of
Schedule 6 of the Special Waste Regulation, B.C. Reg. 63/88, is to be treated, and the cumulative maximum design treatment capacity is > 100 000 kg/day or > 100 000 litres/day, as appropriate.
(3) The following are not reviewable under subsections (1) and (2):
(
a) a facility for the treatment of a special waste which does not use or propose to use incineration or thermal treatment if the facility is
(
i) a mobile off-site treatment facility, or
(ii)
a research and demonstration facility;
(
b) any treatment authorized by
Part 6 of the Special Waste Regulation, B.C. Reg. 63/88.
Criteria:
(1) Subject to subsection (2), modification of an
existing facility that meets
(
a) Threshold H,
(
b) Threshold I, as it applies to modification of facilities described in Column 2, subsection (2) (
a) and (c), or
(
c) Threshold I as it applies to the modification of facilities that use special waste under Column 2, subsection (1) (b) (ii) (
A) or (B).
(2) The following are not reviewable under subsection (1):
(
a) a facility for the treatment of a special waste which does not use or propose to use incineration or thermal treatment if the facility is
(
i) a mobile off-site treatment facility, or
(ii)
a research and demonstration facility;
(
b) any treatment authorized by
Part 6 of the Special Waste Regulation, B.C. Reg. 63/88.
Table 11 — Solid Waste Management Projects
Column 1
Column 2
Column 3
Project Category
New Project
Modification of Existing Project
Local Government Solid Waste Management Facilities
Criteria:
(1) A new facility if
(
a) the board of a regional district has determined that the facility will be included in a solid waste management plan or a solid waste management plan amendment to be submitted to the Minister of Water, Land and Air Protection for approval as part of the Regional Solid Waste Management Planning Process, and
(
b) the facility is for the treatment or disposal of municipal solid waste by the operation of
(
i) a landfill with a design capacity of > 250 000 tonnes/year, or
(ii)
an incinerator with a design capacity of > 225 tonnes/day.
Criteria:
(1) Modification of an existing facility if the board of a regional district has determined that the modification will be included in a solid waste management plan or a solid waste management plan amendment to be submitted to the Minister of Water, Land and Air Protection for approval as part of the Regional Solid Waste Management Planning Process, and the criteria in either (
a) or (
b) are met:
(
a) the modification of the existing facility if
(
i) the existing facility, were it a new facility, would meet the criteria described opposite in Column 2, section (1) (b) (i), and
(ii)
the modification results in
(
A) an extension in the lifespan of the facility beyond that lifespan currently authorized in an approved solid waste management plan, or
(
B) an increase in the annual design capacity of the facility beyond that currently authorized in an approved solid waste management plan;
(
b) does not meet the criteria described in Column 2, subsection (1) (b) (
i) or (ii) for a new facility, but the modification results in an increase in the design capacity of the facility above the threshold under Column 2, subsection (1) (b) (
i) or (ii).
Table 12 — Liquid Waste Management Projects
Column 1
Column 2
Column 3
Project Category
New Project
Modification of Existing Project
Local Government Liquid Waste Management Facilities
Criteria:
(1) Subject to subsections (2) and (3), a new facility that is
(
a) for the treatment or disposal of municipal liquid waste, and
(
b) designed to serve > 10 000 people.
(2) Assessment of a new facility under subsection (1) does not include the dismantling and abandonment phases.
(3) A facility that is a component of a Municipal Liquid Waste Management Plan approved under the Waste Management Act is not reviewable under subsection (1).
Criteria:
(1) Subject to subsections (2) and (3), modification of an existing facility that meets the criteria in paragraph (
a) or (b):
(
a) Threshold H;
(
b) if the existing facility were a new facility, the existing facility would meet the criteria described in Column 2, subsection (1) (a), but would not meet the criteria described in Column 2, subsection (1) (
b) and the modification results in
(
i) an increase in its capacity sufficient to permit the plant to serve an existing or planned population of > 10 000 people, and
(ii)
an increase of > 30% in the total waste discharge from the facility.
(2) Assessment of the modification of an existing facility described in subsection (1) does not include the dismantling and abandonment phases.
(3) A modification that is a component of a Municipal Liquid Waste Management Plan approved under the Waste Management Act is not reviewable under subsection (1).
Part 7 — Food Processing Projects
Definitions for
Part 7
14 In this Part:
"threshold J" means the criteria
described in
section 15 (1);
"threshold K" means the criteria
described in
section 15 (2).
Criteria for proposed
modifications of food processing projects
(1) In this Part, threshold J is met for a
proposed modification of an existing facility if
(
a) the existing facility, were it a new facility in the
same category as the existing facility as described in Column 1 of the
applicable table, would meet the criteria set out opposite in Column 2, and
(
b) the modification will result in an increase of at
least 30% in the total waste discharge of the facility.
(2) In this Part, threshold K is met for a proposed
modification of an existing facility if
(
a) the existing facility, were it a new facility in the
same category as the existing facility as described in Column 1 of the
applicable table, would not meet the criteria set out opposite in Column 2, and
(
b) the modification will result in
(
i) a facility that if it were a new facility would meet
the criteria set out opposite in Column 2, and
(ii) an increase of at least 30% in the total waste
discharge of the facility.
Table 13 — Food Processing Projects
Column 1
Column 2
Column 3
Project Category
New Project
Modification of Existing Project
Meat and Meat Products Industry (except poultry) —
SIC code 1011
Poultry Products Industry — SIC code 1012
Fish Products Industry — SIC code 1021
Criteria:
(1) A new facility that has a maximum liquid waste
discharge permitted under the Waste Management Act of > 800 m 3 /day.
Criteria:
(1) Modification of an existing facility that meets
(
a) Threshold J, or
(
b) Threshold K.
Part 8 — Transportation Projects
Definitions for
Part 8
16 In this Part, "public highway"
means a road, street, lane, bridge or right of way designed or intended for use
by the general public for the passage of vehicles, but does not include a
private road.
Table 14 — Transportation Projects
Column 1
Column 2
Column 3
Project Category
New Project
Modification of Existing
Project
Public Highways
Criteria:
(1) Subject to subsection (2), a new facility consisting of > 20 continuous km of paved public highway with > 2 lanes.
(2) Assessment of a new facility under subsection (1) does not include the dismantling and abandonment phases.
Criteria:
(1) Subject to subsection (2), modification of an existing facility that results in the addition of > 2 lanes of paved public highway to an existing paved public highway over a continuous distance of > 20 km.
(2) Assessment of the modification of an existing facility described in subsection (1) does not include the dismantling and abandonment phases.
Railways
Criteria:
(1) Subject to subsection (2), a new railway facility that consists of
(a)
> 20 continuous km of developed track, or
(
b) a rail line designed to accommodate high-speed trains with a design speed of > 200 km/hour.
(2) Assessment of a new facility under subsection (1) does not include the dismantling and abandonment phases.
Criteria:
(1) Subject to subsection (2), modification of an existing facility that results in
(
a) the addition of one or more lines of track to an existing railway over a continuous distance of > 20 km, or
(
b) a railway designed to accommodate high-speed trains with a design speed of > 200 km/hour.
(2) Assessment of the modification of an existing facility described in subsection (1) does not include the dismantling and abandonment phases.
Ferry Terminals
Criteria:
(1) Subject to subsection (2), a new ferry terminal facility
(
a) that
(
i) serves marine ferry operations, and
(ii)
has an outbound annual vehicle throughput capacity of > 500 000 vehicles, or
(
b) that
(
i) serves either marine or freshwater ferry operations, and
(ii)
entails construction of the facility by dredging, filling or other direct physical disturbance of
(A)
> 1 000 m of linear shoreline, or
(B)
> 2 hectares of foreshore or submerged land, or a combination of foreshore and submerged land, below the natural boundary of a water body.
(2) Assessment of a new facility under subsection (1) does not include the dismantling and abandonment phases.
Criteria:
(1) Subject to subsections (2) and (3), modification of an existing facility if
(
a) the existing facility, were it a new facility, would meet the criteria set out opposite in Column 2, and
(
b) the modification
(
i) results in an increase in the outbound annual vehicle throughput capacity of > 35%, or
(ii)
entails dredging, filling or other direct physical disturbance of
(A)
> 1 000 m of linear shoreline, or
(B)
> 2 hectares of foreshore or submerged land, or a combination of foreshore and submerged land, below the natural boundary of a water body.
(2) Assessment of the modification of an existing facility described in subsection (1) does not include the dismantling and abandonment phases.
(3) Periodic maintenance dredging for an existing facility is not reviewable under subsection (1).
Marine Port Facilities (other than Ferry Terminals)
Criteria:
(1) Subject to subsection (2), a new marine port facility, other than a ferry terminal, if construction of the facility entails dredging, filling or other direct physical disturbance of
(a)
> 1 000 m of linear shoreline, or
(b)
> 2 hectares of foreshore or submerged land, or a combination of foreshore and submerged land, below the natural boundary of a marine coastline or marine estuary.
(2) Assessment of a new facility under subsection (1) does not include the dismantling and abandonment phases.
Criteria:
(1) Subject to subsections (2) and (3), modification of an existing facility, other than a ferry terminal, if
(
a) the existing facility, were it a new facility, would meet the criteria set out opposite in Column 2, and
(
b) the modification results in dredging, filling or other direct physical disturbance of
(i)
> 1 000 m of linear shoreline, or
(ii)
> 2 hectares of foreshore or submerged land, or a combination of foreshore and submerged land, below the natural boundary of a marine coastline or marine estuary.
(2) Assessment of the modification of an existing facility described in subsection (1) does not include the dismantling and abandonment phases.
(3) Periodic maintenance dredging for an existing facility is not reviewable under subsection (1).
Airports
Criteria:
(1) Subject to subsection (2), a new airport facility that has a runway > 1 500 m in length.
(2) Assessment of a new facility under subsection (1) does not include the dismantling and abandonment phases.
Criteria:
(1) Subject to subsection (2), modification of an existing facility that results in
(
a) installing a new runway > 1 500 m long,
(
b) extending an existing runway that is < 1 500 m long by > 1 500 m, or
(
c) extending an existing runway that is > 1 500 m long by > 500 m.
(2) Assessment of the modification of an existing facility described in subsection (1) does not include the dismantling and abandonment phases.
Part 9 — Tourist Destination Resort
Projects
Definitions for
Part 9
17 In this Part:
"bed unit" means the accommodation
required for one person to stay overnight, and includes accommodation which is
available on a night-by-night basis and permanent residential accommodation;
"commercial bed unit" means the
accommodation required for one person to stay overnight, but does not include
permanent residential accommodation;
"golf resort development" means a
resort development with attached golf facilities;
"marina resort development" means a
resort development with attached moorage facilities;
"resort development" means a commercial
operation, with attached commercial bed units, that caters to tourists and
serves local, regional, provincial or international markets;
"ski resort development" means a resort
development with attached skiing facilities.
Table 15 — Tourist Destination Resort Projects
Column 1
Column 2
Column 3
Project Category
New Project
Modification of Existing
Project
Resort Developments — not golf, marina or ski
Criteria:
(1) Subject to subsection (2), a new facility that
(
a) is a resort development, with
or without associated recreation facilities,
(
b) is not a golf resort
development, a marina resort development or a ski resort development,
and
(
c) has > 2 000
bed units, of which > 600 must be commercial bed units.
(2) Assessment of a new facility under subsection
(1) does not include the dismantling and abandonment phases.
Criteria:
(1) Subject to subsection (2), modification of an
existing facility if
(
a) the existing facility, were
it a new facility, would meet the criteria set out opposite in Column 2,
and
(
b) the modification results in
an increase in the number of bed units at the facility by > 2 000,
of which > 600 must be commercial bed units.
(2) Assessment of the modification of an existing
facility described in subsection (1) does not include the dismantling
and abandonment phases.
Golf Resorts
Criteria:
(1) Subject to subsection (2), a new facility that
(
a) is a golf resort development,
and
(
b) has
(
i) a developed base area of > 200
hectares, which includes
(A)
> 100 hectares
of golf courses, and
(B)
> 100 hectares
of area for the club house, hotel, restaurant, parking and ancillary
services, and
(ii)
> 600
commercial bed units.
(2) Assessment of a new facility under subsection
(1) does not include the dismantling and abandonment phases.
Criteria:
(1) Subject to subsection (2), modification of an
existing facility if
(
a) the existing facility, were
it a new facility, would meet the criteria set out opposite in Column 2,
and
(
b) the modification results in
(
i) an increase in the developed
base area of the facility by > 200 hectares, and
(ii)
an increase in the number of
commercial bed units at the facility by > 600.
(2) Assessment of the modification of an existing
facility described in subsection (1) does not include the dismantling
and abandonment phases.
Marina Resorts
Criteria:
(1) Subject to subsection (2), a new facility that
(
a) is a marina resort
development, and
(
b) has
(
i) a marina with > 1 000
linear metres of moorage, and
(ii)
> 600
commercial bed units.
(2) Assessment of a new facility under subsection
(1) does not include the dismantling and abandonment phases.
Criteria:
(1) Subject to subsection (2), modification of an
existing facility if
(
a) the existing facility, were
it a new facility, would meet the criteria set out opposite in Column 2,
and
(
b) the modification results in
(
i) an increase in the moorage at
the facility by > 1 000 linear metres, and
(ii)
an increase in the number of
commercial bed units at the facility by > 600.
(2) Assessment of the modification of an existing
facility described in subsection (1) does not include the dismantling
and abandonment phases.
Ski Resorts
Criteria:
(1) Subject to subsection (2), a new facility that
(
a) is a ski resort development, and
(
b) has > 2 000 bed units, of which > 600 must be commercial bed units.
(2) Assessment of a new facility under subsection
(1) does not include the dismantling and abandonment phases.
Criteria:
(1) Subject to subsection (2), modification of an
existing facility if
(
a) the existing facility, were
it a new facility, would meet the criteria set out opposite in Column 2,
and
(
b) the modification results in
an increase in the number of the bed units at the facility by > 2 000,
of which > 600 must be commercial bed units.
(2) Assessment of the modification of an existing
facility described in subsection (1) does not include the dismantling
and abandonment phases.
Appendix 1
Contaminant Weighting Factors
Table A
Air Contaminant
Weighting Factor
Carbon Dioxide
0.00
Methane
0.00
Ammonia
1.00
Asbestos*
1.00/unit
Carbon Monoxide
0.03
Chlorine and Chlorine Oxides
0.67
Fluorides
40.14
Hydrocarbons
1.00
Hydrogen Chloride
0.67
Metals
40.14
Nitrogen Oxides
0.67
Phenols
1.00
Sulphur and Sulphur Oxides
0.78
Total Particulate
1.00
Total Reduced Sulphur
33.45
Volatile Organic Compounds
1.00
Other contaminants not otherwise specified
1.00
* Units of Asbestos are equivalent to 5 cubic metres of
air emissions per minute at a concentration of 2 fibres per cubic centimetre.
Rates of discharge for other air contaminants are measured in tonnes.
Table B
Effluent Contaminant
Weighting Factor
Acute Toxicity**
1.10/unit
Ammonia
7.53
Adsorbable Organic Halides
20.00
Arsenic
20.00
Biochemical Oxygen Demand
1.51
Chlorine
20.00
Cyanide
20.00
Fluoride
7.53
Metals
20.00
Nitrogen and Nitrates
3.01
Oil and Grease
5.02
Other Petroleum Products
5.02
Other Solids
1.00
Phenols
20.00
Phosphorus and Phosphates
7.53
Sulphates
0.29
Sulphides
20.00
Surfactants
5.02
Suspended Solids
1.00
Other contaminants not otherwise specified
1.00
** Units of Acute Toxicity are determined using the following
formula:
Average Daily Flow
(100 LC 50 )
Units of Acute Toxicity =
Rates of discharge for other effluent
contaminants are measured in tonnes.
Table C
Solid Contaminant
Weighting Factor
Coarse Coal Refuse
8.00
Refuse
1.00
Rates of discharge for solid contaminants
are measured in tonnes.
Appendix 2
Map Groups and Blocks Contained Within the Western Canadian
Sedimentary Basin of North East British Columbia
(Table 8, Item 1, Column 2, subsection (2) and Column 3,
subsection (2))
MAP GROUP(
S) BLOCK(S)
93-H-01
I, J
93-H-07
H, I, J
93-H-08
A, B, C, E, F, G, H, I, J, K, L
93-H-09, 15, 16
ALL
93-H-10
A, B, C, E, F, G, H, I, J, K, L
93-H-11
H, I, J
93-H-13
H, I, J
93-H-14
A, B, C, E, F, G, H, I, J, K, L
93-I-01-03, 05-16
ALL
93-I-04
A, B, C, E, F, G, H, I, J, K, L
93-J-01
93-J-08
A, B, F, G, H, I, J, K, L
93-J-09, 16
ALL
93-J-10
H, I, J
93-J-15
A, B, C, F, G, H, I, J, K, L
93-N-16
93-O-01, 02, 07-11, 13-16
ALL
93-O-03
A, G, H, I, J
93-O-05
93-O-06
A, B, C, E, F, G, H, I, J, K, L
93-O-12
A, G, H, I, J, K
93-P (01-16)
ALL
94-A (01-16)
ALL
94-B (01-16)
ALL
94-G (01-16)
ALL
94-H (01-16)
ALL
94- I (01-16)
ALL
94- J (01-16)
ALL
94-K (01-16)
ALL
94-N (01-16)
ALL
94-O (01-16)
ALL
94-P (01-16)
ALL
94-C-01
A, B, G, H, I, J, K
94-C-07
94-C-08, 09, 15, 16
ALL
94-C-10
A, B, G, H, I, J, K
94-C-14
H, I
94-E-16
H, I
94-F-01, 02, 06-11, 13-16
ALL
94-F-03
A, B, F, G, H, I, J, K
94-F-05
94-F-12
A, B, G, H, I, J, K
94-L-01
A, B, F, G, H, I, J, K, L
94-L-07
A, G, H, I, J, K
94-L-08-10, 15, 16
ALL
94-L-11
H, I, J
94-L-13
94-L-14
A, B, C, E, F, G, H, I, J, K, L
94-M-01-03, 05-16
ALL
94-M-04
A, G, H, I, J, K
95-A (01-04)
A, B, C, D
95-B (01-04)
A, B, C, D
95-C (01-04)
A, B, C, D
95-D (01-04)
A, B, C, D
104-P-08
104-P-09
A, B, F, G, H, I, J, K, L
104-P-15
H, I, J
104-P-16
ALL
105-A-01
A, B, C, D
105-A-02
A, B
Appendix 3
Industrial Minerals
1 The following are industrial minerals for the
purposes of the definition in
section 7:
(
a) all rock or stone used to produce dimension stone or
building facing stone, or for any other ornamental or decorative purpose;
(
b) barite, calcite, dolomite, gypsum, limestone,
magnesite, phosphate rock, wollastonite;
(
c) bentonite, clay, diatomaceous earth, pozzolanic
materials, zeolite, kaolin clay, and all related substances;
(
d) pumice, lava, volcanic ash and all related
substances;
(
e) all substances in which silica is the predominant
mineral and which are used for an industrial purpose, including massive silica,
quartz, quartzite, garnet and corundum;
(
f) jade, rhodonite and all decorative stone and rock;
(
g) talc;
(
h) marl;
(
i) feldspar;
(
j) shale and slate;
(
k) graphite.
Copyright © 2002: Queen's Printer, Victoria, British Columbia, Canada