Mineral Regulations

N.L.R. 1143/1996

Newfoundland and Labrador — Regulations

Mineral Regulations

N.L.R. 1143/1996

Newfoundland and Labrador — Regulations

This is an official version.

Copyright 2024: Queen’s Printer,

St. John's, Newfoundland and Labrador, Canada

Important Information

(Includes details about the availability of printed and electronic versions of the Statutes.)

Table of Regulations

Main Site

How current is this regulation?

CONSOLIDATED NEWFOUNDLAND

AND LABRADOR

REGULATION 1143/96

Mineral Regulations

under the

Mineral Act

(O.C. 96-299)

Amended by:

57/97

85/97

71/98

104/98

107/98

32/99

38/99

81/99

97/00

36/01

2001 c42 s45

31/04

16/05

46/06

78/06

100/06

2006 c40 s12

8/08

28/09

63/09

20/10

66/10

5/13

79/14

34/15

3/17

2018 c8 s1812/22

76/23

88/23

34/24

83/24

CONSOLIDATED NEWFOUNDLAND AND LABRADOR

REGULATION 1143/96

Mineral Regulations

under the

Mineral Act

(O.C. 96-299)

Under the authority of

section 41 of the Mineral Act

and the Subordinate Legislation Revision and Consolidation Act

, the Lieutenant-Governor in Council makes the following regulations.

REGULATIONS

Analysis

Short title

Definitions

Exemptions

PART I

MAP STAKED LICENCES

Rep. by 20/10 s2

Rep. by 20/10 s3

Boundaries of map staked licences

6.1

Rep. by 16/05 s1

Applications rejected

Application fee and deposit

Size of licence area

Applications for map staked licence

Assessment work and refunds

Fractional map staked claims

12.1

Fractional claims at zone boundaries

Deposit not required

Licence reduction and partial surrender

PART II - Rep. by 20/10 s5

Rep. by 20/10 s5

Rep. by 20/10 s5

Rep. by 20/10 s5

Rep. by 20/10 s5

Rep. by 20/10 s5

Rep. by 20/10 s5

Rep. by 20/10 s5

Rep. by 20/10 s5

Rep. by 20/10 s5

Rep. by 20/10 s5

Rep. by 20/10 s5

Rep. by 20/10 s5

Rep. by 20/10 s5

Rep. by 20/10 s5

Rep. by 20/10 s5

Rep. by 20/10 s5

Rep. by 20/10 s5

Rep. by 20/10 s5

Rep. by 20/10 s5

Rep. by 20/10 s5

Rep. by 20/10 s5

PART III

GROUPING OF LICENCES

Grouping of licences

PART IV

EXTENDED LICENCES

Conditions of extended licence

Reduction and partial surrender of extended licence

PART V

MINING LEASES

Survey required

Annual rental

PART VI

ASSESSMENT WORK

Notification and approval

Assessment plans

Camps

Exploration sites

Duties upon completion

Guidelines

Assessment work requirements

Acceptable expenditures

Report acceptable to minister

Good faith compliance

Evidence required

Reports not approved

Credit for personal work

Distribution of assessment work

Reports

Substantiating information

PART VII

GENERAL

Preservation of diamond drill core

Disposal or transfer of drill core

Grievance notice filed

Defective descriptions

Errors and omissions

Licence surrender and cancellation

Fees

Formal validity

Repeal

Schedule A

Schedule B

Short title

These regulations may be cited as the Mineral Regulations

132/83 s1

Back to Top

Definitions

In these regulations

(a)

"Act" means the Mineral Act;

(b)

"authorized representative" means a person authorized by the minister to act as the ministers official representative;

(c)

[Rep. by 20/10 s1]

(d)

"coterminous" means having at least one claim side in common;

(e)

"department" means the department presided over by the minister;

(f)

"extended licence" means a licence giving the holder the exclusive right to continue to explore for minerals and to carry out development work in an area previously held by the holder as a map staked licence;

(g)

[Rep. by 20/10 s1]

(h)

[Rep. by 20/10 s1]

( i

"map staked claim" means a plot of land shown on maps maintained at the department constituting one-quarter part of a UTM grid square and bounded by one corner of a UTM grid square and comprising 25 hectares or less;

(j)

"map staked licence" means a licence giving the holder the exclusive right to explore for minerals in an area shown on maps maintained in the department and described in accordance with

section 6;

(k)

"mining lease" means a lease issued under

section 31 of the Act;

(l)

"minister" means the minister appointed under the Executive Council Act

to administer the Act;

(m)

"recorded" means entered by the Mineral Claims Recorder in the relevant electronic register maintained by the department;

(n)

"staking rush" means an occasion where it can be demonstrated that more than one applicant has endeavoured or will endeavour to stake the same area at the same time and in that instance, the recorder shall consider the situation to be a staking rush;

(o)

"surveyor" means a surveyor who is a registered member of the Association of Newfoundland Land Surveyors;

(p)

[Rep. by 20/10 s1]

(q)

[Rep. by 20/10 s1]

(r)

"UTM grid" means the 1,000 metre

universal transverse mercator

grid, as defined by NAD 27.

132/83 s2; 181/86 s1; 171/93 s1; 2006 c40 s12 ; 20/10 s1 ; 88/23 s1

Back to Top

Exemptions

All land and land under water listed or referred to in

Schedule A is exempted from the application of these regulations under paragraph 4(1)(

b) of the Act.

132/83 s3

PART I

MAP STAKED LICENCES

Back to Top

Rep. by 20/10 s2

[Rep. by 20/10 s2]

20/10 s2

Back to Top

Rep. by 20/10 s3

[Rep. by 20/10 s3]

20/10 s3

Back to Top

Boundaries of map staked licences

Map staked licence boundaries shall be described by reference to UTM grid co-ordinates NAD 27.

132/83 s33

Back to Top

Rep. by 16/05 s1

6.1

[Rep. by 16/05 s1]

16/05 s1

Back to Top

Applications rejected

An application for a map staked licence may be rejected by the recorder if, in the recorders opinion, the description provided by the applicant is inadequate or defective.

132/83 s36; 88/23 s2

Back to Top

Application fee and deposit

Applications for map staked licences shall not be accepted unless

(

a) they are in a form approved by the minister; and

(

b) they are accompanied by

( i

the fee prescribed by the minister, and

(ii)

a deposit in the amount and in a form set by the minister.

132/83 s37; 16/05 s2

Back to Top

Size of licence area

A map staked licence may be issued by the recorder for up to 256 coterminous map staked claims.

208/92 s4

Back to Top

Applications for map staked licence

(1)An application for a map staked licence shall be submitted electronically in the manner provided by the recorder.

(2) The recorder shall maintain a computer storage and retrieval system to receive and accept electronic applications.

(3) The order of acceptance of applications for map staked licences shall be governed by the system referred to in subsection (2) and an application is not accepted unless confirmation is transmitted electronically to the applicant.

(4) If access to the system referred to in subsection (2) is not available for any reason, the minister may authorize the recorder to accept applications in a format approved by the minister.

(5) When access to the system referred to in subsection (2) is restored, the recorder shall enter the accepted applications in the system before permitting any other applications.

(6) Where an application is withdrawn by the applicant after acceptance but before a licence is issued, the fee and the deposit referred to in paragraph 8(

b) shall be forfeited to the minister.

(7) The recorder is not liable for loss or damage suffered by a person because of the failure of the system referred to in subsection (2) to accept an application or to correctly accept an application.

16/05 s3

Back to Top

Assessment work and refunds

(1)The deposit referred to in subparagraph 8(b)(ii) shall be refunded to the licensee if the licensee has completed all of

the assessment work required to be done during the first year of the map staked licence and has filed with the department a report of all the work done that has been approved and accepted by the minister.

(2) If a map staked licence has been surrendered, cancelled

or partially surrendered and the assessment work required to be done during the first year of the map staked licence has not been completed, the deposit or a portion of the deposit in proportion to the partial surrender, referred to in subparagraph 8(b)(ii) shall be forfeited to the minister.

(3) Where a licensee is granted an extension under Condition 2 of

Schedule A to the Act, in order to

complete the assessment work for the first year of the map staked licence, for reasons other than those set out in Condition 2(4) of

Schedule A to the Act, the deposit referred to in subparagraph 8(b)(ii) shall be refunded to the licensee.

(4) Where a licensee is granted an extension under Condition 2 of

Schedule A to the Act, in order to complete the assessment work for the first year of the map staked licence, for the reasons set out in Condition 2(4) of

Schedule A to the Act, the deposit referred to in subparagraph 8(b)(ii) shall not be refunded to the licensee until all the assessment work required to be done for the first year of the map staked licence is completed.

(5) Where a licensee completes a portion of the assessment work required for the first year and has filed with the department a report, acceptable to the minister, of the work done, an equivalent proportion of the deposit referred to in subparagraph 8(b)(ii) shall be refunded to the licensee, the balance of the deposit referred to in subparagraph 8(b)(ii) shall be forfeited to the minister.

(6) Where a map staked licence is transferred in the manner provided for in the Act and regulations, rights to the deposit and the refund of it, as provided, shall pass with the licence.

79/14 s1

Back to Top

Fractional map staked claims

(1)Where the boundary of an existing licence area, mining claim, licence, lease

or grant has been established on the ground and that results in fractions of claims becoming available for map staking, those fractions may be

(

a) applied for as if it were a full size

claim; or

(

b) included in an application for a map staked licence for the adjacent claim.

(2) Every fractional claim shall be treated as a full size

claim for the purpose of calculating recording fees, security deposits and assessment work requirements.

(3) When areas with boundaries established on the ground lapse and become available for staking, an adjacent fractional map staked claim included in a map staked licence in good standing shall become full claims and the boundary of the area to come open for staking shall be adjusted accordingly.

132/83 s34; 16/05 s5 ; 79/14 s2

Back to Top

Fractional claims at zone boundaries

12.1

(1)Where an application is made for a map staked licence for an area that crosses a UTM zone boundary and that results in fractions of claims being staked, the total area of the fractional claims in hectares shall be divided by 25 and the result, rounded down to the nearest whole number, shall be considered the number of full-size claims represented by the area of fractional claims.

(2) The number produced by the calculation in subsection (1) shall be used for the purpose of recording fees, security deposits and assessment work requirements for the fractional claims staked.

16/05 s6

Back to Top

Deposit not required

(1)A genuine prospector may make application electronically, in the manner provided by the recorder, for map staked licences without submitting the deposit referred to in subparagraph 8(b)(ii), but

(

a) no more than 5 map staked licences shall be granted to the genuine prospector in a calendar year;

(

b) map staked licences granted to the genuine prospector in the calendar year shall include a maximum of 30 claims; and

(

c) the deposit referred to shall become payable in full where a transfer, except to the heir of the genuine prospector, is registered with respect to one or more of the map

staked licences.

(2) In this section, "genuine prospector" means a person who is ordinarily resident in the province who applies to the minister for that designation and who provides clear evidence with the application that the person

(

a) is seriously intending to undertake mineral prospecting activities in the future; and

(

b) either

( i

is qualified as a mineral prospector, having successfully completed a recognized mineral prospecting training program, or

(ii)

has undertaken mineral prospecting activities on the persons own behalf or on behalf of a mineral-industry employer within the 12 months before making the application.

(3) A designation as a genuine prospector is valid for a period of 5 years and may be renewed upon application but may be cancelled by the minister on notice to the person.

83/96 s1 ; 16/05 s7 ; 2006 c40 s12 ; 79/14 s3 ; 88/23 s3

Back to Top

Licence reduction and partial surrender

(1)The holder of a map staked licence may apply to surrender portions of the area described in the map staked licence in a form approved by the minister during the currency of the map staked licence and the portion of the deposit made under subparagraph 8(b)(ii) or in compliance with Condition 2 of

Schedule A to the Act relating to the area surrendered shall be forfeited to the minister and shall, on application, be granted a map staked licence for claims being retained free of charge for the unexpired term of the map staked licence.

(2) On receipt by the recorder of the application referred to in subsection (1), the rights of the licence holder to all areas not included in the application referred to in subsection (1) shall be considered to be

surrendered immediately and shall be further dealt with in accordance with

section 27 of the Act and

section 62 of these regulations.

(3) Where surrender of some of the area included in a map staked licence results in physical separation of claims, separate map staked licences shall be issued for the physically separated claims.

(4) The anniversary date of a map staked licence referred to in subsection (1) shall be that of the map staked licence which is being relinquished for that area.

79/14 s4

PART II - Rep. by 20/10 s5

20/10 s5

Back to Top

Rep. by 20/10 s5

[Rep. by 20/10 s5]

20/10 s5

Back to Top

Rep. by 20/10 s5

[Rep. by 20/10 s5]

20/10 s5

Back to Top

Rep. by 20/10 s5

[Rep. by 20/10 s5]

20/10 s5

Back to Top

Rep. by 20/10 s5

[Rep. by 20/10 s5]

20/10 s5

Back to Top

Rep. by 20/10 s5

[Rep. by 20/10 s5]

20/10 s5

Back to Top

Rep. by 20/10 s5

[Rep. by 20/10 s5]

20/10 s5

Back to Top

Rep. by 20/10 s5

[Rep. by 20/10 s5]

20/10 s5

Back to Top

Rep. by 20/10 s5

[Rep. by 20/10 s5]

20/10 s5

Back to Top

Rep. by 20/10 s5

[Rep. by 20/10 s5]

20/10 s5

Back to Top

Rep. by 20/10 s5

[Rep. by 20/10 s5]

20/10 s5

Back to Top

Rep. by 20/10 s5

[Rep. by 20/10 s5]

20/10 s5

Back to Top

Rep. by 20/10 s5

[Rep. by 20/10 s5]

20/10 s5

Back to Top

Rep. by 20/10 s5

[Rep. by 20/10 s5]

20/10 s5

Back to Top

Rep. by 20/10 s5

[Rep. by 20/10 s5]

20/10 s5

Back to Top

Rep. by 20/10 s5

[Rep. by 20/10 s5]

20/10 s5

Back to Top

Rep. by 20/10 s5

[Rep. by 20/10 s5]

20/10 s5

Back to Top

Rep. by 20/10 s5

[Rep. by 20/10 s5]

20/10 s5

Back to Top

Rep. by 20/10 s5

[Rep. by 20/10 s5]

20/10 s5

Back to Top

Rep. by 20/10 s5

[Rep. by 20/10 s5]

20/10 s5

Back to Top

Rep. by 20/10 s5

[Rep. by 20/10 s5]

20/10 s5

Back to Top

Rep. by 20/10 s5

[Rep. by 20/10 s5]

20/10 s5

PART III

GROUPING OF LICENCES

Back to Top

Grouping of licences

(1)The holder of licences may apply to group those licences to a single mapped staked licence provided however that no map staked licence shall include more than 256 map staked claims.

(2) The date of issue of a map staked licence issued under subsection (1) shall be considered to be the date of issue of the first issued map staked licence grouped under subsection (1), the area of which is included in the licence that is being issued to replace the grouped map staked licences and the provisions of the Act and these regulations shall apply as if the map staked licence had been issued on the earliest date of issue.

(3) A person shall not be issued a map staked licence under subsection (1) unless the Act and these regulations have been complied with in respect of all the map staked licences that are to be grouped, including the payment of a renewal fee on a licence being joined with a licence in a later renewal term.

(4) A map staked licence issued under subsection (1) shall not include areas that at the date of grouping have been licensed for less than one year unless the first year

assessment work is completed and an assessment report accepted.

(5) This

section does not apply to licences extended under

section 28.1 of the Act.

208/92 s3; 16/05 s10 ; 20/10 s6 ; 79/14 s5

PART IV

EXTENDED LICENCES

Back to Top

Conditions of extended licence

(1)The holder of a licence may apply to the minister for not more than 3 extensions of the term of the licence in accordance with

section 28 of the Act for all or a portion of the area described in the licence and the minister shall issue a licence for the extended period subject to

(

a) payment of the fee prescribed by the minister; and

(

b) assessment work requirements as set out in

section 47 for each year of the extended period instead of the assessment work required during the original term of the licence.

(2) The holder of an extended licence may apply to the minister for an extension of the extended licence in accordance with

section 28.1 of the Act for the area described in the licence, where the area is 100 coterminous map staked claims or less, or for a portion of the area described in the licence subject to

(

a) payment of the fee prescribed by the minister; and

(

b) assessment work requirements as set out in

section 47 for the extension, instead of the assessment work required during the original term of the licence.

79/14 s6

Back to Top

Reduction and partial surrender of extended licence

(1)The holder of an extended licence may apply to the minister for a reduction of the area covered by the extended licence and the minister may grant the reduction and reduce the assessment work requirement for the licensee for the current and subsequent years of the extended licence.

(2) If the extended licence is in an extension period under Condition 2 of

Schedule A or B to the Act, the security deposit shall be forfeited in proportion to the reduction of the size of the extended licence.

(3) Applications for a reduction of the area covered by an extended licence shall be as prescribed under

section 14.

79/14 s7

PART V

MINING LEASES

Back to Top

Survey required

(1)Where a mining lease is applied for by the holder of a licence, the survey referred to in paragraph 31(3)(

b) of the Act shall be filed with the recorder within 6 months of the date of application.

(2) If the survey referred to in paragraph 31(3)(

b) of the Act is not filed within the period designated in subsection (1), then the application for a mining lease shall be considered to be

null and void.

(3) A surveyor conducting a survey under paragraph 31(3)(

b) of the Act shall proceed with the survey in a manner acceptable to the recorder.

(4) Paragraph 31(3)(

b) of the Act applies, with the necessary changes, to a survey required under this Part.

132/83 s54; 20/10 s9 ; 79/14 s8

Back to Top

Annual rental

A mining lease issued under

section 31 of the Act shall provide for an annual rental as set out in

Schedule B.

132/83 s56

PART VI

ASSESSMENT WORK

Back to Top

Notification and approval

(1)A licensee or lessee who intends to conduct a detailed systematic search for minerals on areas either licensed or leased under the Act, or granted or issued by another Act must submit a description of the planned exploration work before commencing the work.

(2) (3) Reconnaissance surveys over areas where the mineral rights are vested in the Crown and available for staking under subsection 4(1) of the Act will not require prior notification of the department except when the activities require the establishment of a camp and then only the prescribed details regarding the camp must be reported and approved.

87/95 s1

Back to Top

Assessment plans

(1)The plans referred to in

section 41 shall

(

a) describe the equipment to be utilized and all materials to be consumed in carrying out the activity;

(

b) identify the project supervisor, contractors and approximate number of people involved with the project;

(

c) describe the location and planned depth of all drill holes, consumables that may be employed to complete the drilling and plans regarding removal of casing;

(

d) describe location and dimensions of all trenching and stripping, planned date for backfilling the trenches and precautions to be taken while trenches are open;

(

e) identify the location of all base camps and fly camps, the facilities existing or to be installed at each camp, the period of occupation and the number of people to occupy the camp;

(

f) identify the location of all existing roads, woods roads or trails that will be used to access the site or move to and from locations within the project area;

(

g) identify the location of all new trails to be prepared to facilitate the planned program;

(

h) identify the location of all new grids and cut lines to be established by the planned current program.

(2) All information required under subsection (1) shall be identified on 1:25,000; 1:20,000; 12,500 or 1:10,000 scale maps or aerial photographs as appropriate.

(3) Exploration work is to be carried out without deviation from the exploration plan.

(4) Notwithstanding subsection (2), where the holder of an exploration approval proposes to alter the work or deviate from the plan to an extent which does not impact the environment in a significantly adverse way, the department must be informed of changes to or deviation from the approved exploration plan.

(5) Notwithstanding subsection (3), where the holder of an exploration approval proposes to conduct exploration work in a manner which deviates substantially from the approved exploration plan or in a manner which may significantly impact the environment, a new exploration plan shall be submitted

and a revised exploration approval shall be issued before the work is undertaken.

(6) Notwithstanding subsection (3), where exploration work is to be conducted in sensitive environmental areas, the exploration approval shall provide that the exploration plan cannot be amended or deviated from unless a new exploration plan is submitted and a revised exploration approval issued as provided in these regulations.

87/95 s1

Back to Top

Camps

(1)A licence of occupation under the Lands Act

is required for a camp location where use or occupation of it is proposed to involve

(

a) long term, seasonal or permanent, use and occupation of the camp;

(

b) ground disturbance to prepare the site including but not limited to bulldozing to level an area or trenching to drain water from the site; or

(

c) a cache of fuel or equipment left at the site for more than one year.

(2) Camps that require a licence of occupation will be referred to as base camps and as a minimum shall

(

a) not be located within 30 metres of a body of water;

(

b) have the necessary sanitation facilities in accordance with the Department of Health and Department of Environment and Labour legislation;

(

c) have all garbage removed from the camp to an established waste disposal area, notwithstanding the permission of the owner or operator for use of the site;

(

d) have fuel properly stored with the necessary certificates or approvals and be properly equipped to handle any spills;

(

e) be properly equipped to fight forest fires.

(3) Small temporary camps involving no ground disturbance and requiring the cutting of just enough trees necessary to site or construct tents and to allow for the safe use of rotary-winged aircraft to support the site if necessary

will not require a licence of occupation.

(4) Camps that do not require a licence of occupation will be referred to as fly camps and may be located within 30 metres of a body of water but shall comply as a minimum with the following requirements:

(

a) a pit privy must be located at least 25 metres from the camp in a direction away from bodies of water and shall be backfilled upon abandonment of the camp;

(

b) dishwater and wash water shall be disposed of in a pit large enough to contain the volume of water to be discarded, located at least 30 metres away from all water bodies and the pit backfilled upon abandonment of the camp;

(

c) all other garbage and waste shall be taken from the camp to either the supporting base camp or directly to an established waste disposal area for final disposal as frequently as possible;

(

d) on abandonment, all equipment, building materials, unused consumable and waste brought into the camp shall be removed to either the base camp or an established waste disposal area as appropriate;

(

e) all trees used as tent frames or foundations shall be neatly stacked in a pile or piles for salvage or reuse at a future date.

(5) All used consumable items, packaging, refuse and discarded material must be properly contained and handled to avoid contamination or littering of the exploration site, some materials, such as waste oil and used batteries, shall not be disposed of at a waste disposal site and must be either delivered to or collected by an approved collection service.

87/95 s1

Back to Top

Exploration sites

(1)Where areas are to be cleared of trees to prepare access trails, those areas and operations shall comply as a minimum with the following requirements

(

a) the trees shall be cut as close to the ground as possible to minimize ground disturbance caused by the uprooting of trees or tree stumps by movement of the equipment along the trail;

(

b) the portions of the tree trunk larger than 9 centimetres in diameter shall be limbed and stacked at intervals along the trail for salvage or for use to corduroy sections of the trail where ground conditions warrant;

(

c) trees and tops with trunk diameter less than 9 centimetres shall be piled to the side of the trail or lopped and scattered if conducive to reducing ground disturbance.

(2) Trees and slash which are cleared shall not be felled or discarded into streams or water bodies.

(3) The procedure described in subsection (1) must be used to clear areas for campsites, marshalling yards or lay-down areas and in preparing a trench or a drill site.

(4) Where a site is to be trenched, sufficient area shall be cleared to allow excavated material to be piled and placed back into the trench without uprooting trees or having the excavated material mixed with the trees cleared from the trench site.

(5) Persons clearing areas under this

section shall comply with all provisions of the Forestry Act

and regulations under that Act.

87/95 s1

Back to Top

Duties upon completion

(1)Upon completion of the exploration work,

(

a) all trenches, stripped areas or sample sites shall be backfilled as soon as practical

and the topsoil and organic material shall be placed on top of the backfilled trench;

(

b) all disturbed areas including trench locations, sections of trails, drill sites and camp sites that could cause siltation into nearby bodies of water shall be stabilized with vegetation mats or have properly installed filter-fabric barriers to avoid siltation of the water body; and

(

c) at the end of the field season or before periods of hiatus longer than 6 months in the exploration program, all materials and equipment shall be removed from the area or properly secured at a base camp and garbage, broken equipment or other waste material shall be removed from the site to an established waste disposal area.

(2) At the conclusion and abandonment of an exploration project, all camps and cleared areas shall have stockpiled soil and organic material spread back over the area.

(3) Abandoned exploration access roads shall have installed permanent structures, culverts, retaining banks, to control potential erosion and siltation caused by the road.

(4) If the site is a potential illegal dump site, the road shall be permanently bared

or ditched.

87/95 s1

Back to Top

Guidelines

The minister may issue guidelines to clarify and illustrate intentions and practical implementation of this regulation and other legislation that regulate activities related to mineral exploration work.

87/95 s1

Back to Top

Assessment work requirements

(1)The holder of a map staked licence shall be required to expend or cause to be expended on the licensed area on assessment work of a type described in

section 48 the following amounts:

(a)

$200 per map staked claim during the first year;

(b)

$250 per map staked claim during the second year;

(c)

$300 per map staked claim during the third year;

(d)

$350 per map staked claim during the fourth year; and

(e)

$400 per map staked claim during the fifth year.

(2) The holder of an extended licence under

section 28 of the Act shall be required to expend or cause to be expended on the licensed area on assessment work of a type described in

section 48 the following amounts:

(

a) for each year of the first extended term, years 6-10, by multiplying the number of claims held under the licence by $600;

(

b) for each year of the second extended term, years 11-15, by multiplying the number of claims held under the licence by $900; and

(

c) for each year of the third extended term, years 16-20, by multiplying the number of claims held under the licence by $1,200.

(3) The holder of an extended licence under

section 28.1 of the Act shall be required to expend or cause to be expended on the licensed area on assessment work of a type described in

section 48 the following amounts:

(a)

$2,000 per map staked claim per year for years 21 to 25;

(b)

$2,500 per map staked claim per year for years 26 to 30; and

(c)

$3,000 per map staked claim per year for each year after year 30.

79/14 s9 ; 88/23 s4

Back to Top

Acceptable expenditures

(1)Expenditures upon the following activities, when carried out for the purpose of exploration and development within the area of a licence issued under these regulations, shall, subject to

section 49 be credited as assessment work:

(

a) prospecting;

(

b) trenching, pitting and stripping;

(

c) line cutting and flagging;

(

d) surface and underground geological surveys;

(

e) airborne, surface and underground geochemical surveys;

(

f) airborne, surface and underground geophysical surveys and borehole geophysical surveys;

(

g) photogeological and remote imagery

interpretations;

(

h) drilling and core transportation to storage facilities of the department;

( i

land surveys;

(

j) topographic surveys;

(

k) shaft sinking and other underground development work;

(

l) engineering evaluation reports;

(

m) beneficiation studies, analyses, assays

and microscopic studies; and

(

n) others that may be approved by the minister.

(2) The issuance of a mining lease shall not affect the size of the licence for the purpose of calculating the assessment work required to be done on the licence for the years during or following the issuance of the mining lease.

(3) Expenditures acceptable under subsection (1) and undertaken within a mining lease may be credited as assessment work for the licence of which the mining lease is a part.

132/83 s57; 165/85 s9

Back to Top

Report acceptable to minister

The minister may reject a report of assessment work if, in the ministers opinion, the work has not been performed or the report or reports have not be

compiled to the ministers satisfaction.

132/83 s58; 88/23 s5

Back to Top

Good faith compliance

The minister may accept reports if the minister is satisfied that the person submitting it has attempted in good faith and to the best of the persons ability to comply with the requirements of the Act and these regulations.

132/83 s59; 88/23 s6

Back to Top

Evidence required

Reports of assessment work or statements of expenditures required to be submitted under the Act or these regulations shall not be credited to a licensee until the evidence of that work and those expenditures has been approved and accepted by the minister.

132/83 s60

Back to Top

Reports not approved

If the minister refuses to approve and accept the reports or statements submitted by a licensee, then the minister shall

(

a) provide the holder with a description of the deficiencies noted; and

(

b) either

( i

allow the holder a period of time

, not exceeding 30 days, in which to remedy the deficiencies and return the relevant data to the minister,

(ii)

permit the holder to apply for an extension in accordance with Condition 2 of

Schedule A or B to the Act notwithstanding the proviso regarding the anniversary date of the licence contained in the condition, but within a period not exceeding 30 days from the date of notification under this subparagraph.

132/83 s61; 79/14 s10 ; 88/23 s7

Back to Top

Credit for personal work

When field work is personally conducted upon the licence area by the holder of the licence or by an individual holding a registered interest in that licence, without remuneration, then that work may be credited at the rate of $200 for each 8 hour

period that the holder is so employed.

132/83 s62; 88/23 s8

Back to Top

Distribution of assessment work

When a licence holder submits the account of expenditure required under Condition 3 of

Schedule A or B to the Act the recorder shall apply the minimum expenditures required under these regulations equally to all claims comprising the original licence area or the licence area retained.

79/14 s11

Back to Top

Reports

(1)Subject to

section 50, every report submitted for assessment work pertaining to a licence and describing any one or combination of the activities listed in

section 48 shall be

(

a) a detailed logistical account of the work, including all raw data,

interpretations, conclusions and recommendations in an appropriate form;

(

b) suitable for reproduction; and

(

c) submitted in an acceptable digital form and medium if the data was collected in or transcribed to digital form.

(2) Notwithstanding subsection (1), reports shall be in the form prescribed by the minister.

132/83 s64; 165/85 s10

Back to Top

Substantiating information

The minister may require a licensee to submit to the minister the information the minister may consider necessary to substantiate the expenditures claimed.

132/83 s65; 88/23 s9

PART VII

GENERAL

Back to Top

Preservation of diamond drill core

A person, whether a holder of mineral rights issued under the Act or these regulations or not, shall not intentionally abandon, discard, dump, destroy or otherwise reduce the original technical value of a diamond drill core or rotary drill cuttings obtained for information purposes within the province or remove them from the province, except for those sections submitted for assaying, testing, microscopic, metallurgical and beneficiation studies, without the permission of the minister.

132/83 s66

Back to Top

Disposal or transfer of drill core

(1)All persons proposing to dispose of a diamond drill core in their possession or lodged with them for safe-keeping

, shall notify the minister of their desire to do so and upon receipt of that notification, the minister

(

a) shall provide those persons with permission in accordance with

section 57; or

(

b) may direct the ministers authorized representative to take possession of that drill core for the Crown and take other action that the minister may consider necessary.

(2) The actions directed by the minister under subsection (1) shall be undertaken at the expense of the Crown.

132/83 s67; 88/23 s10

Back to Top

Grievance notice filed

(1)When a notice of grievance is served upon the minister under

section 39 of the Act, the minister shall authorize the recorder to enter upon the record a note of the disputed title.

(2) Action shall not be taken by the recorder with respect to the disputed title pending decision by the Mineral Rights Adjudication Board and specific instructions from the minister.

132/83 s68

Back to Top

Defective descriptions

When it has been shown to the satisfaction of the minister that the description of a licence or mining lease issued under the Act, under a predecessor Act or under these regulations is defective, then the minister may

(

a) authorize a resurvey and revision of the description; and

(

b) in the case of licences not requiring ground surveys, order the revision of the defective licence or the issuance of an amending document,

but that action shall not affect the effective dates of the licence or mining lease.

132/83 s69; 88/23 s11

Back to Top

Errors and omissions

(1)Where a licence or mining lease has been issued to or in the name of the wrong party or contains a clerical error or misnomer, or there is an omission of the conditions of the licence or mining lease, the minister may, provided there is no adverse claim, order the defective licence or mining lease to be cancelled and a correct one to be issued in its place but that action shall not affect the effective dates of the licence or mining lease.

(2) Where the system referred to in

section 10 for acceptance of applications for map staked licences incorrectly accepts 2 or more applications for the same claim or claims, the recorder shall not issue a licence to any of the applicants and a draw shall be held to determine which application shall be accepted for that claim or claims.

(3) The recorder is not liable for loss or damage suffered by a person arising out of the non-acceptance of their application in the circumstances described in subsection (2).

16/05 s11

Back to Top

Licence surrender and cancellation

(1)The recorder shall publish in the Gazette

a notice describing the lands in respect of which a licence has been surrendered or considered surrendered or expired.

(2) Where the recorder has notified a licensee under

section 26 of the Act of the cancellation of a licence, the recorder shall, after expiry of the time for filing a notice of grievance under

section 39 of the Act against that cancellation or after final disposition of adjudication proceedings under

section 39 of the Act, publish in the Gazette

a notice describing the lands in respect of which a licence has been cancelled.

(3) Land affected by a surrender, expiration or cancellation of a licence shall be available for application in accordance with the Act as if no licence had been issued in respect of the land after the hour of 9:00 in the forenoon of the thirty-second clear day after publication of a notice under subsection (1) or (2).

(4) Notwithstanding subsections (1) to (3), where land is or becomes a reserve, a provisional reserve or emergency reserve under the Wilderness and Ecological Reserve Act

that land and the minerals in, on or under that land are unavailable for application under the Mineral Act

until

(

a) the land is no longer a reserve, a provisional reserve

or an emergency reserve; and

(

b) subsequent to

that, a notice in respect of the land is published under subsection (1) and the time is after the hour of 9:00 in the forenoon of the thirty-second clear day after that publication.

132/83 s70; 181/86 s4; 79/14 s12

Back to Top

Fees

The fees under these regulations shall be prescribed by the minister.

1992 cF-7.1 s30

Back to Top

Formal validity

For the purposes of

section 6 of the Act, an instrument shall not be registered by the Mineral Claims Recorder which does not comply with the requirements for formal validity set out in the Registration of Deeds Act, 2009

165/85 s12; 2019 c8 s18

Back to Top

Repeal

The Mineral Regulations, 1983, Newfoundland Regulation 132/83, are repealed.

Back to Top

Schedule A

LANDS REGISTERED IN CROWN LANDS REGISTRY

Fee Simple Mining Grants

Volume

Folio

All that piece or parcel of land situate and being on the eastern shore of St. John's Harbour in the province and being more particularly described as follows:

Commencing at a point being the southernmost point at ordinary low water in Gunners Cove, Freshwater Bay;

Then from the point of commencement so determined and running in a general northwesterly direction passing through a point being the intersection of the centre line of the Southside Road and the centre line of Job's Bridge, crossing to a point on the eastern shore of St. John's Harbour, at ordinary low water;

Then in a general northeasterly direction and following the eastern shore of St. John's Harbour to Cahill Point;

Then running by the southern shore of the Narrows in a general easterly direction to South Head;

Then running in a general southwesterly direction by the waters of St. John's

Bay

and by the waters of Freshwater

Bay

to the point of commencement.

All that piece or parcel of land, subtitled Julienne Lake, described in

Schedule B to Appendix C to the Statutory Agreement annexed to the Nalco-Javelin, Mineral Lands Act, 1957

as amended (Amdt. Nfld. Reg, 5/78).

All those pieces or parcels of land described in Appendix B to the draft Lease annexed to the Hamilton Falls Power Corporation Limited Lease Act, 1961

, as amended.

All that piece and parcel of land situate and being at Conne River in the province bounded and abutted as follows:

Beginning at a point that point having UTM coordinates 5,304,636.94 north 596,048.32 east;

Then south 36

27' 13" east 876.62 metres;

Then north 60

42' 19" east 1,914.197 metres;

Then north 40

39' 16" east 2,191.238 metres;

Then north 47

58' 09" east 991.160 metres;

Then north 56

39' 43" east 1,790.942 metres;

Then north 29

41' 58" east 240.384 metres;

Then south 28

35' 36" east 796.0095 metres;

Then south 52

16' 31" west 9,836.243 metres;

Then south 86

32' 16" west 1,761.381 metres;

Then south 32

01'40" west 819.852 metres;

Then south 34

45'17" east 759.529 metres;

Then south 29

12'56" west 1,809.124 metres;

Then south 37

33' 26" west 1,937.551 metres;

Then north 76

24' 48" west 651.244 metres;

Then south 70

27' 20" west 848.933 metres;

Then north 00

58' 54" east 642.099 metres;

Then north 53

46' 05" east 1,331.502 metres;

Then north 08

08' 50" east 472.773 metres;

Then north 23

20' 06" west 277.711 metres;

Then north 72

50' 54" east 678.180 metres;

Then north 01

49' 39" west 909.460 metres;

Then north 50

55' 35" east 2,287.744 metres;

Then south 80

19' 21" east 481.865 metres;

Then north 44

02' 27" east 383.118 metres;

Then south 85

26' 19" west 2,007.257 metres;

Then north 29

16' 48" west 443.683 metres;

Then along the southeast shoreline of Bay dEspoir

, in a generally northeast direction, for a distance of approximately

9,500 metres, more or less to the point of beginning and containing an area of 3,403 ha.

All bearings are referred to the UTM Grid Zone 21, NAD27.

All that piece of land and land under water in the general area of Rigolet in the province being described as follows:

Beginning at a point that point having UTM co-ordinates of 403,500 metres east, 6,037,000 metres north;

Then on a bearing of 90

for 4,000 metres;

Then on a bearing of 180

for 1,500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 2,500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 2,500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 2,500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 2,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 2,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 4,000 metres;

Then on a bearing of 180

for 13,500 metres;

Then on a bearing of 270

for 10,000 metres;

Then on a bearing of 180

for 6,000 metres;

Then on a bearing of 270

for 9,000 metres;

Then on a bearing of 180

for 23,000 metres;

Then on a bearing of 270

for 45,000 metres;

Then on a bearing of 360

for 12,000 metres;

Then on a bearing of 90

for 7,000 metres;

Then on a bearing of 360

for 8,500 metres;

Then on a bearing of 90

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 2,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 2,000 metres;

Then on a bearing of 270

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres to the point of beginning.

All bearings refer to the UTM Grid Zone 21, NAD 27.

All that piece of land and land under water in the general area of Postville and Makkovik in the province being described as follows:

Beginning at a point that point having UTM co-ordinates of 352,000 metres east, 6,125,000 metres north;

Then on a bearing of 90

for 15,000 metres;

Then on a bearing of 180

for 11,000 metres;

Then on a bearing of 90

for 13,000 metres;

Then on a bearing of 180

for 39,000 metres;

Then on a bearing of 270

for 17,000 metres;

Then on a bearing of 180

for 5,000 metres;

Then on a bearing of 270

for 3,000 metres;

Then on a bearing of 180

for 4,000 metres;

Then on a bearing of 270

for 3,000 metres;

Then on a bearing of 180

for 2,500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 2,000 metres;

Then on a bearing of 360

for 5,500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 4,500 metres;

Then on a bearing of 360

for 2,500 metres;

Then on a bearing of 270

for 6,000 metres;

Then on a bearing of 360

for 6,000 metres;

Then on a bearing of 270

for 10,000 metres;

Then on a bearing of 180

for 3,000 metres;

Then on a bearing of 270

for 3,000 metres;

Then on a bearing of 180

for 6,000 metres;

Then on a bearing of 270

for 5,000 metres;

Then on a bearing of 180

for 14,000 metres;

Then on a bearing of 270

for 13,056 metres;

Then on a bearing of 2

for 12,010 metres;

Then on a bearing of 90

for 556 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 3,500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 3,500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 2,500 metres;

Then on a bearing of 360

for 4,000 metres;

Then on a bearing of 90

for 3,000 metres;

Then on a bearing of 360

for 3,000 metres;

Then on a bearing of 270

for 3,000 metres;

Then on a bearing of 360

for 9,000 metres;

Then on a bearing of 90

for 11,000 metres;

Then on a bearing of 360

for 5,000 metres;

Then on a bearing of 90

for 6,000 metres;

Then on a bearing of 360

for 2,000 metres;

Then on a bearing of 90

for 16,000 metres;

Then on a bearing of 360

for 2,000 metres to the point of beginning.

All bearings refer to the UTM Grid Zone 21, NAD 27 and;

beginning at a point that point having UTM co-ordinates of 692,555 metres east, 6,083,000 metres north;

Then on a bearing of 177

for 12,010 metres;

Then on a bearing of 265

for 6,943 metres;

Then on a bearing of 355

for 4,601 metres;

Then on a bearing of 88

for 229 metres;

Then on a bearing of 358

for 512 metres;

Then on a bearing of 91

for 518 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 56 metres to the point of beginning.

All bearings refer to UTM Grid Zone 20, NAD 27; and

Beginning at a point that point having UTM co-ordinates of 342,000 metres east, 6,084,000 metres north;

Then on a bearing of 90

for 2,000 meters;

Then on a bearing of 180

for 2,000 meters;

Then on a bearing of 270

for 1,500 meters;

Then on a bearing of 180

for 500 meters;

Then on a bearing of 270

for 500 meters;

Then on a bearing of 360

for 2,500 meters to the point of beginning.

All bearings refer to the UTM Grid Zone 21, NAD 27.

All that piece of land and land under water in the general area of Hopedale in the province being described as follows:

Beginning at a point that point having UTM co-ordinates of 680,000 metres east, 6,194,000 metres north;

Then on a bearing of 180

for 51,000 metres;

Then on a bearing of 270

for 4,000 metres;

Then on a bearing of 180

for 13,000 metres;

Then on a bearing of 270

for 6,000 metres;

Then on a bearing of 180

for 3,000 metres;

Then on a bearing of 270

for 9,000 metres;

Then on a bearing of 180

for 4,000 metres;

Then on a bearing of 270

for 2,000 metres;

Then on a bearing of 180

for 9,000 metres;

Then on a bearing of 270

for 9,000 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 2,500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 2,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 2,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 5,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 13,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 2,500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 4,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 3,500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 2,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 2,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 4,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 3,500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 3,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 2,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 2,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 2,000 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 5,000 metres;

Then on a bearing of 270

for 6,500 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 7,000 metres;

Then on a bearing of 270

for 7,500 metres;

Then on a bearing of 180

for 19,000 metres;

Then on a bearing of 270

for 2,000 metres;

Then on a bearing of 180

for 3,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 5,000 metres;

Then on a bearing of 270

for 2,000 metres;

Then on a bearing of 180

for 6,500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 2,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 1,500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 3,000 metres;

Then on a bearing of 270

for 2,500 metres;

Then on a bearing of 360

for 2,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 270

for 2,500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 270

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 2,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 3,000 metres;

Then on a bearing of 90

for 3,000 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 90

for 4,000 metres;

Then on a bearing of 360

for 3,000 metres;

Then on a bearing of 90

for 5,000 metres;

Then on a bearing of 360

for 3,000 metres;

Then on a bearing of 90

for 2,000 metres;

Then on a bearing of 360

for 9,000 metres;

Then on a bearing of 90

for 2,000 metres;

Then on a bearing of 360

for 19,000 metres;

Then on a bearing of 90

for 28,000 metres to the point of beginning.

All bearings refer to the UTM Grid Zone 20, NAD 27.

All that piece of land and land under water in the general area of Nain in the province being described as follows:

Beginning at a point that point having UTM co-ordinates of 582,000 metres east, 6,323,000 metres north;

Then on a bearing of 90

for 20,000 metres;

Then on a bearing of 180

for 13,000 metres;

Then on a bearing of 90

for 30,000 metres;

Then on a bearing of 180

for 80,500 metres;

Then on a bearing of 270

for 20,500 metres;

Then on a bearing of 180

for 1,500 metres;

Then on a bearing of 270

for 11,500 metres;

Then on a bearing of 360

for 2,000 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 2,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 2,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 7,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 270

for 1,500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 2,500 metres;

Then on a bearing of 180

for 2,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 2,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 6,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 2,500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 6,500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 270

for 2,000 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 270

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 2,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,500 metres;

Then on a bearing of 360

for 8,500 metres;

Then on a bearing of 270

for 5,000 metres;

Then on a bearing of 360

for 13,000 metres;

Then on a bearing of 270

for 5,000 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 2,500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 2,500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 2,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 2,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 6,500 metres;

Then on a bearing of 360

for 9,600 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 5,500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 3,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 4,500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 3,500 metres;

Then on a bearing of 90

for 3,000 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 3,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 2,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 2,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 90

for 14,000 metres;

Then on a bearing of 360

for 11,000 metres;

Then on a bearing of 90

for 6,000 metres;

Then on a bearing of 360

for 7,000 metres to the point of beginning.

All bearings refer to the UTM Grid Zone 20, NAD 27.

Reserving nevertheless out of the above described

parcel of land all that are covered by map staked licences, portions of map staked licences and mining leases.

All that piece of land and land under water in the general area of Okak

Bay in the province being described as follows:

Beginning at a point that point having UTM co-ordinates of 552,000 metres east, 6,390,000 metres north;

Then on a bearing of 90

for 14,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 2,000 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 3,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 2,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 2,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 3,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 3,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 3,000 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 270

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 2,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 4,000 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 90

for 4,000 metres;

Then on a bearing of 360

for 3,000 metres to the point of beginning.

All bearings refer to the UTM Grid Zone 20, NAD 27; and

Beginning at a point that point having UTM co-ordinates of 562,000 metres east, 6,360,000 metres north;

Then on a bearing of 90

for 3,500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 3,500 metres;

Then on a bearing of 360

for 1,000 metres to the point of beginning.

All bearings refer to the UTM Grid Zone 20, NAD 27.

All that piece of land and land under water in the general area of Hebron Fiord in the province being described as follows:

Beginning at a point that point having UTM co-ordinates of 509,000 metres east, 6,457,000 metres north;

Then on a bearing of 90

for 16,000 metres;

Then on a bearing of 180

for 9,500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 1,500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 90

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 4,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 360

for 1,100 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 2,500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 2,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 180

for 1,500 metres;

Then on a bearing of 270

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 2,000 metres;

Then on a bearing of 270

for 1,500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 4,000 metres;

Then on a bearing of 270

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 2,500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 2,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 4,500 metres;

Then on a bearing of 180

for 5,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 2,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 2,000 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 2,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 2,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 2,500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 2,500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 7,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 270

for 2,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 3,000 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 2,500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 2,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 90

for 3,500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 2,000 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 2,500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 2,500 metres;

Then on a bearing of 90

for 3,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 3,500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 3,500 metres;

Then on a bearing of 360

for 3,000 metres to the point of beginning.

All bearings refer to the UTM Grid Zone 20, NAD 27.

All that piece of land and land under water in the general area of Saglek

Fiord in the province being described as follows:

Beginning at a point that point having UTM co-ordinates of 510,500 metres east, 6,484,500 metres north;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 1,500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 2,500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 3,000 metres;

Then on a bearing of 270

for 3,000 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 2,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 2,000 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 270

for 2,000 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 270

for 2,000 metres;

Then on a bearing of 180

for 2,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 2,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 5,500 metres;

Then on a bearing of 270

for 3,000 metres;

Then on a bearing of 360

for 2,500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 3,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 2,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 2,000 metres;

Then on a bearing of 270

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 1,500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 2,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 270

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 360

for 2,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 504 metres;

Then on a bearing of 180

for 3,500 metres;

Then on a bearing of 90

for 1,500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 2,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 2,500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 4,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 90

for 3,500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 270

for 500 metres;

Then on a bearing of 180

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 1,000 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 2,000 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 1,000 metres;

Then on a bearing of 180

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 500 metres;

Then on a bearing of 90

for 500 metres;

Then on a bearing of 360

for 2,000 metres to the point of beginning.

All bearings refer to the UTM Grid Zone 20, NAD 27.

All that piece or parcel of land and land under water surrounding and including the community of Davis Inlet in the province and being described as follows:

Beginning at a point that point having UTM co-ordinates of 6,208,000 metres north, 652,000 metres east, then south 29,000 metres, west 58,000 metres, then north 29,000 metres, then east 58,000 metres to the point of beginning. All bearings are referred to the UTM Grid Zone 20, NAD 27. Reserving nevertheless out of the above described

parcel of land all that area covered by map staked licences, portions of map staked licences and ares

or portions of areas for which applications for map staked licences have been received before the effective date of this regulation and for which issuance of a map staked licence is pending.

All that piece or parcel of land and land under water surrounding and including the community of Sheshatshiu

in the province being described as follows:

Beginning at a point that point having UTM co-ordinates of 5,934,000 metres north, 698,000 metres east, then south 17,000 metres, then west 11,000 metres, then north 3,000 metres, then west 4,000 metres, then nor

Document details

CollectionNewfoundland and Labrador — Regulations
CitationN.L.R. 1143/1996
Typeregulation
Volume / chapterN.L.R. 1143/1996
Languageen
Formathtm
SourcePROVINCIAL
Identifier4df94f97524f6883b7a08f5822c35b2564405af9

Source file is stored in the law ingest library (htm).