Construction Regulations (N.S. Reg. 176/2015) (just regulations regs envfees.htm)
N.S. Reg. 176/2015
Nova Scotia — Regulations
This consolidation is unofficial and is for reference only.
For the official version of the regulations, consult the original documents on file with the Office of the Registrar of Regulations , or refer to the Royal Gazette
Part II .
Regulations are amended frequently.
Please check the list of Regulations by Act to see if there are any recent amendments to these regulations filed with our office that are not yet included in this consolidation.
Although every effort has been made to ensure the accuracy of this electronic version, the Office of the Registrar of Regulations assumes no responsibility for any discrepancies that may have resulted from reformatting.
This electronic version is copyright ©
, Province of Nova Scotia , all rights reserved. It is for your personal use and may not be copied for the purposes of resale in this or any other form.
Fees Regulations
made under clause 8A(1)(
a) of the
Environment Act
S.N.S. 1994-95, c. 1
N.S. Reg. 176/2015 (effective April 1, 2015)
amended to N.S. Reg. 85/2026 (effective March 24, 2026)
Table of Contents
Please note: this table of contents is provided for convenience of reference and does not form part of the regulations.
Click here to go to the text of the regulations .
Citation
Part 1: Environment Act
Filing fees for remediation reports
Fee for request for information from the environmental registry
Industrial air emission fees
Application fee for appeal to Minister
Part 2: Regulations Made Under the Environment Act
Activities Designation Regulations
Application fee for Division I water (water withdrawal) approval or renewal
Annual administration fee for Division I water (water withdrawal) approval
Annual approval to use fee for Division I water (water withdrawal) approval
Application fee for Division I water (non-water withdrawal) approval or renewal
Application fee for Division IV salvage yard approval or renewal
Application fees for Division V industrial approval or renewal
Environmental Assessment Regulations
Fees for undertakings requiring environmental assessments
Motive Fuel and Fuel Oil Approval Regulations
Application fee for initial motive fuel wholesaler and fuel oil wholesaler approval
Application fee for 10-year motive fuel retailer and fuel oil retailer approval
Transfer and amendment fee
Application fee for renewal of motive fuel wholesaler approval
Application fee for renewal of fuel oil wholesaler approval
On-site Sewage Disposal Systems Regulations
Fee for reviewing subdivision report
Application fee for on-site sewage installer certificate of qualification or renewal
Application fee for on-site sewage disposal system approval or renewal
Pesticide Regulations
Application fee for pesticide certificate of qualification or renewal
Application fee for pesticide approval or renewal
Petroleum Management Regulations
Annual registration fees for petroleum storage tank or system
Used Oil Regulations
Application fees for a used oil collector approval or renewal
Water and Wastewater Facilities and Public Drinking Water Supplies Regulations
Application fee for facility classification or reclassification
Examination fee for operator in training operator certification exam
Application fees for operator certification certificate or renewal
Well Construction Regulations
Application fees for well construction certificate of qualification or renewal
Citation
1 These regulations may be cited as the Fees Regulations .
Part 1: Environment Act
Filing fees for remediation reports
(1) In this Section, a “remediation report” includes any report filed with the
Department that documents a risk assessment, site management, or site
remediation of a residual contamination on a site regardless of whether or not
active site remediation was necessary.
(2) The types of remediation reports are as follows:
(
a) Type A – a remediation report for a domestic fuel oil spill, if the report is
either
(
i) criteria-based, or
(ii) Tier I risk assessment or remediation;
(
b) Type B – a remediation report for a domestic fuel oil spill, if the report is
either
(
i) Tier II risk assessment or remediation, or
(ii) Tier III risk assessment or remediation;
(
c) Type C – a remediation report for a non-domestic site, if the report is either:
(
i) criteria-based, or
(ii) Tier I risk assessment or remediation;
(
d) Type D – a remediation report for a non-domestic site with a single
contaminant of concern if the report, with risk-based corrective action, is
either
(
i) Tier II risk assessment or remediation, or
(ii) Tier III risk assessment or remediation
and the report has no use restrictions, no controls and no off-site impacts;
(
e) Type E – a remediation report for a non-domestic site with multiple
contaminants of concern if the report, with risk-based corrective action, is
either
(
i) Tier II risk assessment or remediation, or
(ii) Tier III risk assessment or remediation
and the report has no use restrictions, no controls and no off-site impacts;
(
f) Type F – a remediation report for a non-domestic site if the report, with risk-based corrective action, is either
(
i) Tier II risk assessment or remediation, or
(ii) Tier III risk assessment or remediation
and the report has use restrictions, controls or off-site impacts.
(3) The filing fees for a report on the remediation of contaminated sites and releases
under
Part VI and
Part VIII of the Environment Act, by the type of report identified
in subsection (2), are as set out in the following table:
Table 1
Remediation Report Filing Fees
Type of Remediation Report
Filing Fee
Type A
$149.60
Type B
$311.45
Type C
$311.45
Type D
$685.25
Type E
$1027.95
Type F
$1526.30
(4) If a remediation report does not adequately demonstrate that the requirements of
the Department are met and a new report is required by the Department, the filing
fee prescribed in subsection (3) must be re-paid in full when the report is re-filed .
(5) Confirmatory monitoring conditions may be included in a Record of Site
Compliance, Certificate of Compliance or other conditional release from site action
requirements, and if the person responsible asks the Department to be formally
released from further confirmatory monitoring obligations, the applicable fee
prescribed in subsection (3) must be paid in full to the Department.
Fee for request for information from the environmental registry
3 The fee for a request for information from the environmental registry established under
Section 10 of the Environment Act is $26.50 for each civic address submitted for a search.
Industrial air emission fees
(1) In this Section, “pollutants” means a total release to air including any one of or
combination of the following:
(
a) sulphur dioxide;
(
b) particulate matter, which includes reported annual emissions of total
particulate matter, PM 10 , or PM 2.5 , whichever is greatest;
(
c) other releases to air, as listed in subsection (2).
(2) The other releases to air referred to in clause (1)(
c) are as set out in the following
table:
Table 2
Other Releases to Air—Pollutants
• ammonia (total)
• antimony and its
compounds
• carbon monoxide
• chlorine
• chromium and its
compounds
• cobalt and its compounds
• copper and its compounds
• cresol (mixed isomers and
their salts)
• di-ethanolamine and its
salts
• hydrochloric acid
• hydrogen cyanide
• hydrogen sulphide
• manganese and its
compounds
• nickel and its compounds
• oxides of nitrogen (NO 2 )
• phosphorus (total)
• selenium and its
compounds
• sulphuric acid
• vanadium (except when in
an alloy) and its
compounds
• zinc and its compounds
• volatile organic compounds
(VOCs), including:
- 1, 2, 4-trimethylbenzene
- 7H-dibenzo(c,g)carbazole
- acetaldehyde
- benzene
- benzo(a)anthracene
- benzo(a)phenathrene
- benzo(a)pyrene
- benzo(b)flouranthene
- benzo(e)pyrene
- benzo(g,h,i)perylene
- benzo(j)flouranthene
- benzo(k)flouranthene
- biphenyl
- chloromethane
- cumene
- cyclohexane
- dibenz(a,j)acridine
- dibenzo(a,h)anthracene
- dibenzo(a,i)pyrene
- dibutyl phthalate
- dichloromethane
- ethylbenzene
- ethylene
- ethylene glycol
- flouranthene
- formaldehyde
- isopropyl alcohol
- methanol
- naphthalene
- n-hexane
- perylene
- phenanthrene
- phenol and its salts
- propylene
- pyrene
- styrene
- toluene
- trichloroethylene
- xylene (all isomers)
(3) The industrial air emission fees per year for facilities in Nova Scotia are based on the
rates set out in the following table:
Table 3
Industrial Air Emission Fees
Class
Threshold
(tonnes of pollutants/year)
Rate
(per tonne of pollutants)
≥30
$7.35/tonne
<30
no fee
Application fee for appeal to Minister
5 The application fee for a person who is aggrieved to appeal to the Minister under
Section
137 of the Environment Act is $108.95.
Part 2: Regulations Made Under the Environment Act
Activities Designation Regulations
Application fee for Division I water (water withdrawal) approval or renewal
(1) Except as provided in subsection (2), the application fee for an initial water
withdrawal approval or for a renewal of the approval for each term as required under
clause 5(1)(
a) of Division I of the Activities Designation Regulations is $331.75.
(2) The application fee in subsection (1) does not apply to agriculture, aquaculture or
recreational water withdrawal activities.
Annual administration fee for Division I water (water withdrawal) approval
7 The administration fee per year for a water withdrawal approval holder, under clause
5(1)(
a) of Division I of the Activities Designation Regulations , by category of use of water
withdrawal approval is as follows:
(
a) Category I – for hydroelectric use ......................................................... $663.45
(
b) Category II – for domestic, industrial, bottled water, or public drinking water
supply use ............................................................................................. $265.40
Annual approval to use fee for Division I water (water withdrawal) approval
(1) In addition to the administrative fee in
Section 7, subject to the minimum annual
approval to use fee set out in subsection (2), and except as provided in subsections
(3) and (4), the approval to use fee per year for a water withdrawal approval holder,
under clause 5(1)(
a) of Division I of the Activities Designation Regulations is as
follows:
(
a) for municipal, recreational, industrial or domestic purposes, the approval to use
fee is the total of all amounts calculated as follows:
(
i) for each 1 000 000 L per day up to 2 000 000 L ........................... $145.95
(ii) plus for each additional 1 000 000 L per day over
2 000 000 L and up to 9 000 000 L .............................................. $152.50
(iii) plus for each additional 1 000 000 L per day over
9 000 000 L and up to 27 000 000 L ............................................ $165.90
(iv) plus for each additional 1 000 000 L per day over
27 000 000 L and up to 90 000 000 L .......................................... $172.45
(
v) plus for each additional 1 000 000 L per day over
90 000 000 L ............................................................................... $179.10
(
b) for a fish farming or a fish hatchery operation use, the approval to use fee is
20% of the amount determined under clause (a);
(
c) for hydroelectric power generation use, the approval to use fee is calculated at
the rate of $2.10 per horsepower of rated hydraulic capacity.
(2) Except as provided in subsections (3) and (4), the minimum approval to use fee per
year for a water withdrawal approval is $66.15.
(3) The holder of a water withdrawal approval authorizing the use of water for
agriculture, conservation, or beautification purposes is exempt from the approval to
use fee.
(4) To retain a water withdrawal approval if the approval holder temporarily suspends
their use of water for more than 90 days, the approval to use fee per year may be
reduced to the greater of
(a) 10% of the amount calculated under subsection (1); and
(b) $265.40.
(5) The fee reduction provided for in subsection (4) does not apply to a water
withdrawal approval that authorizes water withdrawal for use only during one season
of the year.
Application fee for Division I water (non-water withdrawal) approval or renewal
(1) The activities requiring a Division I water (non-water withdrawal) approval and
included in the categories referred to in subsections (2) and (3) are as set out in the
following table:
Table 4
Categories of Non-Water Withdrawal Activities
Category I activities :
construction or
maintenance of a culvert
construction or
maintenance of a wharf
placement of a rock or
other erosion protection
material in a surface
watercourse
construction or
maintenance of a bridge if
(
i) a portion of the
structure of the bridge
is in a watercourse, or
(ii) the use of equipment
in the watercourse or 3
m from the edge of the
watercourse is
required
construction or
maintenance of a weir,
fishway or other in-stream
structure
installation or
maintenance of fishing
equipment, a fish-way, a
counting fence, a fish
habitat improvement
structure, an aquaculture
cage or any similar
structure in a watercourse
Category II activities:
Any other alteration of a surface watercourse or the flow of the water in a surface
watercourse requiring a Division I water (non-water withdrawal) approval which is
not listed as activity under another category.
(2) Except as provided in subsection (3), the application fees for an initial water
approval or for a renewal of the approval for each term as required under Division I
of the Activities Designation Regulations , other than for a water withdrawal approval
under clause 5(1)(a), by category of water (non-water withdrawal) approval are as
follows:
(
a) Category I ............................................................................................. $124.60
(
b) Category II ............................................................................................ $311.45
(3) The application fee set out in subsection (2) does not apply to an application by the
Department of Transportation and Infrastructure Renewal.
Application fee for Division IV salvage yard approval or renewal
10 The application fee for an initial salvage yard approval or a renewal of the approval for ten
years under Division IV of the Activities Designation Regulations is $330.05.
Application fees for Division V industrial approval or renewal
(1) The activities requiring an industrial approval as listed in the “Parts” under the
Division V-Industrial Approvals provisions of the Activities Designation Regulations
and included in the categories referred to in subsection (2) are as set out in the
following table:
Table 5
Categories of Activities Requiring Industrial Approval
Category I activities:
Part 1: Chemical plants
• chemical manufacturing
• fertilizer manufacturing
• explosives manufacturing
• pesticide manufacturing
• petrochemical manufacturing
• coke or carbon manufacturing
• pharmaceutical manufacturing
Part 2: Construction
•cement plant
Part 3: Food or fish
and animal by-product
•fish meal plant
Part 4: Metal
• iron and steel mill
Part 5: Mineral
•mineral processing
plant
Part 6: Oil and gas
•oil refinery
•natural gas processing
plant
Part 7: Wood product plants
• pulp manufacturing
• pulp and paper
manufacturing
• wood treatment
Part 8: Primary
manufacturing plants
•textile manufacturing
•tire manufacturing
Part 9: Power plants
•power plant
Part 11: Biotechnology
• biotechnology products
manufacturing plant
Part 12: Miscellaneous
•industrial incinerator
•industrial landfill
Category II activities:
An activity designated in the Division V industrial approvals under the Activities
Designation Regulations that is not listed as an activity under another category.
Category III activities:
Part 1: Chemical
• fertilizer storage facility
• industrial cleaners
manufacturing facility
Part 2: Construction
•asphalt paving plant
•stationary ready mix
concrete plant
•pit
•topsoil removal
operation
Part 3: Food or fish
and animal by-products
•inland fish processing
plant
•fish silage operation
Part 5: Minerals
• bulk sample site
• bulk solids handling loadout
facility
Part 6: Oil and gas
•brine storage pond
•used oil collection
facility with storage
capacity of less than
50 000 L (otherwise
under category II)
Part 12: Miscellaneous
• crematorium
• cemetery
Category IV activities:
Part 3: Food or fish and animal by-products
dairy or dairy products plant that processes less than 250 000 L of milk per year
(2) The application fee for an initial industrial approval or for a renewal of the approval
for each term as required under Division V of the Activities Designation Regulations
is as follows:
(
a) Category I ........................................................................................... $8625.15
(
b) Category II .......................................................................................... $3317.35
(
c) Category III ......................................................................................... $1326.95
(d)Category IV .......................................................................................... $484.00
Environmental Assessment Regulations
Fees for undertakings requiring environmental assessments
(1) The undertakings requiring environmental assessments and included in the categories
referred to in subsection (2), are as set out in the following table:
Table 6
Categories of Undertakings Requiring Environmental Assessment
Category I undertakings :
An undertaking designated as a “class II undertaking” as listed in
Schedule “A” to the
Environmental Assessment Regulations .
Category II undertakings :
An undertaking designated as a “class I undertaking” as listed in
Schedule “A” to the
Environmental Assessment Regulations except if the undertaking is set out as a
Category III undertaking.
Category III undertakings :
A facility for manufacturing wood products that are pressure-treated with chemical
products designated as a “class I undertaking” under
Section 2 of Part A: Industrial
facilities of the Class I Undertakings as listed in
Schedule A to the Environmental
Assessment Regulations .
An undertaking designated as a “class I undertaking” under Part E: Waste Management
of the Class I Undertakings as listed in
Schedule A to the Environmental Assessment
Regulations .
An undertaking designated as a “class I undertaking” under Part F: Other of the Class I
Undertakings as listed in
Schedule A to the Environmental Assessment Regulations .
(2) The fees for a undertaking requiring an assessments under the Environmental
Assessment Regulations are as follows:
(
a) Category I undertaking registration ................................................... $17 250.40
(
b) Category II undertaking registration ................................................. $11 146.40
(
c) Category III undertaking registration ................................................... $6369.35
(
d) approval transfer ................................................................................... $662.85
(
e) focus report ......................................................................................... $6634.75
(
f) environmental assessment report ...................................................... $17 250.40
(
g) additional information request .............................................. 1/2 registration fee
(3) The approval transfer fee set out in clause (2)(
d) applies if an approval is transferred
from one proponent to another.
(4) The fees set out in clauses (2)(e), (
f) and (
g) apply only to Category II and III
undertakings and only if the Minister decides that the report or information is
required.
(5) In addition to the fees set out in subsection (2), a proponent is responsible for
(
a) all costs associated with an environmental assessment review panel review and
hearing; and
(
b) all costs associated with a joint federal-Provincial environmental assessment
panel.
Motive Fuel and Fuel Oil Approval Regulations
Application fee for initial motive fuel wholesaler and fuel oil wholesaler approval
13 The application fee for an initial motive fuel wholesaler and fuel oil wholesaler approval
for 1 year under the Motive Fuel and Fuel Oil Approval Regulations is as follows:
(
a) motive fuel wholesaler ........................................................................ $1993.50
(
b) fuel oil wholesaler ................................................................................ $132.65
Application fee for 10-year motive fuel retailer and fuel oil retailer approval
13A The application fee for a 10-year motive fuel retailer and fuel oil retailer approval under
the Motive Fuel and Fuel Oil Approval Regulations is as follows:
(
a) motive fuel retailer ................................................................................ $436.00
(
b) fuel oil retailer ...................................................................................... $436.00
Transfer and amendment fee
14 The fee for a transfer of or an amendment to any approval under the Motive Fuel and Fuel
Oil Approval Regulations is $132.65.
Application fee for renewal of motive fuel wholesaler approval
(1) Subject to the minimum application fee set out in subsection (2), the application fee
for a renewal of a motive fuel wholesaler approval per year under the Motive Fuel
and Fuel Oil Approval Regulations is calculated based on the total motive fuel
volume sold at the rate per litre of $0.00045.
(2) The minimum fee for applying to renew a motive fuel wholesaler approval per year
is $1993.50.
16 [repealed]
Application fee for renewal of fuel oil wholesaler approval
(1) The application fee for the renewal of a fuel oil wholesaler approval per year is as
follows:
(
a) if the volume is less than 50 000 L .......................................................... $13.30
(
b) if the volume is greater than 50 000 L, subject to the minimum fee set out in
subsection (2), the application fee for the renewal of a fuel oil wholesaler
approval per year under the Motive Fuel and Fuel Oil Regulations is calculated
based on the total fuel oil volume sold at the rate per litre of $0.000130.
(2) The minimum application fee for applying to renew a fuel oil wholesaler approval
per year for a volume greater than 50 000 L is $132.65.
On-site Sewage Disposal Systems Regulations
Fee for reviewing subdivision report
18 The fees for reviewing a subdivision report are as follows:
(
a) for a subdivision with fewer than 3 lots .............................................. no charge
(
b) for a subdivision with at least 3 lots and no more than 10 lots ............... $232.35
(
c) for a subdivision with more than 10 lots ................................................ $630.45
Application fee for on-site sewage installer certificate of qualification or renewal
19 The application fee for an initial on-site sewage installer certificate of qualification or for a
renewal of the certificate of qualification per year as required under the On-site Sewage
Disposal Regulations is $166.05.
Application fee for on-site sewage disposal system approval or renewal
20 The application fee for an initial on-site sewage disposal system approval, for installation
within in a specified term, or for a renewal of the approval as required under the On-site
Sewage Disposal Systems Regulations is $66.35.
Pesticide Regulations
Application fee for pesticide certificate of qualification or renewal
(1) Subject to the reduced fee for applications for additional certificates of qualification
provided for in subsection (2), the application fee for an initial certificate of
qualification or a renewal of the certificate of qualification for five years and by class
of certificate of qualification as established under the Pesticide Regulations are as
follows:
(
a) Class I – Vendor ..................................................................................... $66.35
(
b) Class II – Structural ................................................................................ $66.35
(
c) Class III (A) – Forestry ........................................................................... $66.35
(
d) Class III (B) – Greenhouse ...................................................................... $66.35
(
e) Class III (C) – Industrial Vegetation ........................................................ $66.35
(
f) Class III (D) – Landscape ....................................................................... $66.35
(
g) Class IV – Mosquito and Biting Fly ........................................................ $66.35
(
h) Class V – Aquatic Vegetation ................................................................. $66.35
(
i) Class VI – Fumigation ............................................................................ $66.35
(
j) Class VII – Aerial ................................................................................... $66.35
(
k) Class VIII – Agricultural ......................................................................... $66.35
(
l) Class X – Special ................................................................................... $66.35
(2) If a person applies for more than one class of pesticide certificate of qualification or
renewal, the fee is $66.35 for the first application plus $13.30 for each additional
class applied for.
(3) The application fee for an initial certificate of qualification or a renewal of the
certificate of qualification for a one year period for a Class IX – Business Operator
under the Pesticide Regulations is $33.00.
Application fee for pesticide approval or renewal
22 The application fees for an initial pesticide approval or a renewal of the approval as
required under Division II of the Activities Designation Regulations and the Pesticide
Regulations are as follows:
(
a) a pesticide (non-forestry) approval for an area up to 20 ha ..................... $132.65
plus add for each additional ha over 20 ha ................................................ $5.30
(
b) a pesticide (forestry) approval for an area up to 6 ha ............................... $66.35
plus add for each additional ha over 6 ha .................................................. $5.30
Petroleum Management Regulations
Annual registration fees for petroleum storage tank or system
(1) Subject to the fee reduction provided for in subsection (2), the registration fees per
year for a petroleum storage tank or a petroleum storage tank system that is either
(
a) an underground tank with a nominal capacity of 2000 L or greater;
(
b) an above-ground tank s with a nominal capacity of 4000 L or greater,
are as follows:
• at a bulk plant ....................................................................................... $132.65
• at a motive fuel outlet ........................................................................... $132.65
• at an industrial facility ........................................................................... $132.65
• at a commercial facility ......................................................................... $132.65
• at a marina ............................................................................................ $132.65
• at a government facility .......................................................................... $66.35
(2) The registration fee per year for a petroleum storage tank or petroleum storage tank
system is reduced by 50% if the person registering the tank or system voluntarily
obtains and provides proof of insurance coverage for a leak or release from the tank
or system which is acceptable to the Department.
Used Oil Regulations
Application fees for a used oil collector approval or renewal
(1) Subject to the minimum application fee set out in subsection (2), the application fees
for an initial used oil collector approval or for a renewal of the approval as required
under the Used Oil Regulations are as follows:
(
a) for facility with storage capacity of less than 50 000 L .......................... $132.65
(
b) for facility with storage capacity of greater than 50 000 L ................ $0.00265/L
(2) The minimum application fee for a used oil collector approval or renewal is $132.65.
Water and Wastewater Facilities and Public Drinking Water Supplies Regulations
Application fee for facility classification or reclassification
25 The application fee for a water and wastewater facility classification or re-classification as
required under the Water and Wastewater Facilities and Public Drinking Water Supplies
Regulations is $132.65.
Examination fee for operator in training operator certification exam
26 The examination fee for the writing of the exam for an operator in training operator
certification under the Water and Wastewater Facilities and Public Drinking Water
Supplies Regulations is $27.25.
Application fees for operator certification certificate or renewal
27 The application fees for an initial operator certification certificate or a renewal of the
operator certification certificate for four years as required under the Water and Wastewater
Facilities and Public Drinking Water Supplies Regulations for all types are as follows:
(
a) initial operator certification certificate ................................................... $100.00
(
b) renewal of operator certification certificate .............................................. $61.15
Well Construction Regulations
Application fees for well construction certificate of qualification or renewal
28 The application fees for an initial well driller, well digger and pump installer certificate of
qualification or for a renewal of the certificate of qualification per year as required under
the Well Construction Regulations are as follows:
(
a) for a well driller using 1 machine .......................................................... $350.00
plus add for each additional machine to be used .................................... $145.75
(
b) for a well digger using 1 machine ......................................................... $116.65
plus add for each additional machine to be used ...................................... $33.00
(
c) for a Class I well pump installer ............................................................ $116.65
(
d) for a Class II well pump installer ............................................................ $58.30
Legislative History
Reference Tables
Fees Regulations
N.S. Reg.
176/2015
Environment Act
Note: The
information in these tables does not form part of the regulations and is
compiled by the Office of the Registrar of Regulations for reference only.
Source Law
The current consolidation of the Fees Regulations made under the Environment Act includes all of the following regulations:
N.S.
Regulation
In force
date*
How in force
Royal Gazette
Part II Issue
176/2015
Apr 1, 2015
date specified
Apr 8, 2015
69/2016
Apr 12, 2016
date specified
Apr 29, 2016
85/2026
Mar 24, 2026
date specified
Apr 3, 2026
The following regulations are not yet in force and are
not included in the current consolidation:
N.S.
Regulation
In force
date*
How in force
Royal Gazette
Part II Issue
*See subsection 3(6) of the Regulations Act for
rules about in force dates of regulations.
Amendments by Provision
ad. = added
am. = amended
fc. = fee change
ra. = reassigned
rep. = repealed
rs . = repealed and substituted
Provision affected
How affected
11(1), Table 5, Category IV ............
ad. 69/2016
11(2)(d) ............................................
ad. 69/2016
13 .....................................................
rs . 85/2026
13A ..................................................
ad. 85/2026
16 .....................................................
rep. 85/2026
17 .....................................................
rs . 85/2026
Note that changes to headings are not
included in the above table.
Editorial Notes and Corrections:
Note
Effective
date
The reference in s. 9(3) to the Department of
Transportation and Infrastructure Renewal should be read as a reference to
the Department of Transportation and Active Transit in accordance with O.I.C.
2021-56 under the Public Service Act ,
R.S.N.S. 1989, c. 376.
Feb 23, 2021
The reference in s. 9(3) to the Department of
Transportation and Infrastructure Renewal should be read as a reference to
the Department of Public Works in accordance with O.I.C. 2021-209 under the Public Service Act , R.S.N.S. 1989, c.
Aug 31, 2021
Repealed and Superseded:
N.S.
Regulation
Title
In force
date
Repealed
date
Note: Only
regulations that are specifically repealed and replaced appear in this
table. It may not reflect the entire
history of regulations on this subject matter.