Alberta Gazette — 15 October (i)
1015 i
Alberta — Gazette
THE ALBERTA GAZETTE,
PART I, OCTOBER 15, 2003
The Alberta Gazette
PART 1
_______________________________________________________________________
_______________________________________________________________________
Vol. 99 EDMONTON, WEDNESDAY, OCTOBER 15, 2003 No. 19
_______________________________________________________________________
_______________________________________________________________________
PROCLAMATION
[GREAT SEAL]
CANADA
PROVINCE OF ALBERTA Lois E. Hole, Lieutenant Governor.
ELIZABETH THE SECOND, by the Grace of God, of the United Kingdom, Canada,
and Her Other Realms and Territories, QUEEN, Head of the Commonwealth,
Defender of the Faith
P R O C L A M A T I O N
To all to Whom these Presents shall come GREETING
WHEREAS
section 50 of the Financial Sector Statutes Amendment Act, 2003
provides that that Act comes into force on Proclamation; and
WHEREAS it is expedient to proclaim sections 30 and 31 of the Financial
Sector Statutes Amendment Act, 2003 in force:
NOW KNOW YE THAT by and with the advice and consent of Our Executive
Council of Our Province of Alberta, by virtue of the provisions of the said
Act hereinbefore referred to and of all other power and authority
whatsoever in Us vested in that behalf, We have ordered and declared and do
hereby proclaim sections 30 and 31 of the Financial Sector Statutes
Amendment Act, 2003 in force on September 24, 2003.
IN TESTIMONY WHEREOF We have caused these Our Letters to be made Patent and
the Great Seal of Our Province of Alberta to be hereunto affixed.
WITNESS: THE HONOURABLE LOIS E. HOLE, Lieutenant Governor of Our Province
of Alberta, in Our City of Edmonton in Our Province of Alberta, this 23 day
of September in the Year of Our Lord Two Thousand Three and in the
Fifty-second Year of Our Reign.
BY COMMAND Dave Hancock, Provincial Secretary.
APPOINTMENTS
PROVINCIAL COURT ACT
Justice of the Peace Termination
December 8, 2002
Mr. M. O'Byrne of Edmonton
January 17, 2003
Mr. M. D. MacDonald of Edmonton
_______________________________________________________________________
GOVERNMENT NOTICES
AGRICULTURE, FOOD AND RURAL DEVELOPMENT
FORM 15
(Irrigation Districts Act)
(Section 88)
NOTICE TO IRRIGATION SECRETARIAT:
CHANGE OF AREA OF AN IRRIGATION DISTRICT
On behalf of the St. Mary Irrigation District, I hereby request that the
Irrigation Secretariat forward a certified copy of this notice to the
Registrar of Land Titles for the purposes of registration under
section 22
of the Land Titles Act and arrange for notice to be published in the
Alberta Gazette.
The following parcels of land should be REMOVED from the irrigation
district and the notation removed from the certificate of title:
LINC Number
Short Legal Description
as shown on Title
Title Number
0015 491 590
8111688;16;7
941 061 647 +7
I certify that the procedures required under
Part 4 of the Irrigation
Districts Act have been completed and the area of the Irrigation District
should be changed according to the above list.
Laurie Hodge, Office Manager.
Irrigation Secretariat.
_______________________________________________________________________
HOSTING EXPENSES EXCEEDING $600.00
For the period April 1, 2002 to March 31, 2003
Function: Dairy Industry Restructuring Meeting
Date of Function: April 17, 2002
Amount: $635.95
Location: Leduc, AB
Purpose: To continue the process of creating a new dairy structure under
the Marketing of Agricultural Products Act.
Function: Rural Development Initiative Workshops
Date of Function: May 9 to August 18, 2002
Amount: $4,204.63
Location: Edmonton, Calgary, Innisfail, Viking, Hanna, St. Paul, Westlock,
Rocky Mountain House, Sedgewick, Manning, Falher, Edson, Brooks, Airdrie,
Fort McLeod, AB
Purpose: Developing a vision for rural development in Alberta to 2015.
Function: Open House - Food Processing Development Centre
Date of Function: May 29, 2002
Amount: $1,026.42
Location: Leduc, AB
Purpose: Official opening of the newly expanded Development Centre
facility.
Function: Research and Development Strategy
Date of Function: June 12 to 14, 2002
Amount: $1,524.61
Location: Leduc, AB
Purpose: Stakeholder consultations (industry researchers and funders)
Function: Dairy Industry Restructuring Meeting
Date of Function: June 20, 2002
Amount: $718.70
Location: Calgary, AB
Purpose: Meet with producer delegates and processors to review draft 3 of
the Alberta Milk Marketing Regulation, review roles and responsibilities of
interim directors, conduct election for four interim directors, and to
review administrative and operational work in progress for the August 1
switchover.
Function: Community Riparian Program
Date of Function: September 5 to 9, 2002
Amount: $685.50
Location: Camrose, Grande Prairie, Strathmore, AB
Purpose: Focus Group Consultations.
Function: Dairy Industry Restructuring Project Celebration
Date of Function: September 27, 2002
Amount: $1,297.78
Location: Edmonton, AB
Purpose: The event will bring together all governance team participants to
celebrate and bring closure to the Dairy Industry Restructuring project
that began in October 2000.
Function: National Land and Water Information Services (NLWIS) Information
Session
Date of Function: October 1, 2002
Amount: $874.00
Location: Edmonton, AB
Purpose: To provide land use decision makers with access to information,
tools and expertise using GIS technologies. NLWIS has been identified as a
priority activity in the Agricultural Policy Framework (APF) currently
being developed by the federal and provincial governments.
Function: Succession Planning Focus Groups
Date of Function: October 8 to 10, 2002
Amount: $1,004.36
Location: Nisku, Red Deer, Lethbridge, AB
Purpose: To gather benchmark information on farm succession and feedback on
the role of Alberta Agriculture in farm succession planning.
Function: Agivantage Meetings
Date of Function: October 8 to November 13, 2002
Amount: $1,631.33
Location: Nisku, AB
Purpose: Update / Agrivantage report working session.
Function: Alberta Agriculture Hall of Fame Ceremony Banquet
Date of Function: October 11, 2002
Amount: $5,993.28
Location: Edmonton, AB
Purpose: To honour individuals who have made significant outstanding
contributions to the agricultural and agri-business industry on a local,
national or international level.
Function: Reception for Outgoing Irrigation Council Member
Date of Function: November 13, 2002
Amount: $878.66
Location: Lethbridge, AB
Purpose: To bid farewell to Chris Vermeeren.
Function: Research CFO Air Emissions and Human Health Information Workshop
Date of Function: November 18, 2002
Amount: $1,581.89
Location: Leduc, AB
Purpose: To provide overview of existing knowledge concerning CFO emissions
and human health and to review ongoing research programs in Alberta.
Function: Provincial 4-H Agriculture Project Update 2002
Date of Function: November 28 to December 2, 2002
Amount: $666.50
Location: Battle Lake, AB
Purpose: Beef Update (BUD) 2002 - Training and updating provincial 4-H beef
project leaders.
Function: Fourth Pulse Research Workshop
Date of Function: December 8 to 10, 2002
Amount: $1,250.00
Location: Edmonton, AB
Purpose: To discuss recent work done within North America in regards to the
rapidly growing industry of pulse crops.
Function: Dairy Research and Technology Centre Strategic Planning
Date of Function: January 9 to 10, 2003
Amount: $1,076.40
Location: Edmonton, AB
Purpose: To revisit Dairy Research and Technology Centre (DRTC) agreement
with partners (Alberta Milk, University of Alberta and Alberta Agriculture,
Food and Rural Development) and set priorities for the future.
Function: Provincial 4-H Leaders' Conference 2003
Date of Function: January 16 to 19, 2003
Amount: $4,674.06
Location: Red Deer, AB
Purpose: Training and updating 325 provincial 4-H leaders
Function: Northeast Alberta Environmentally Sustainable Agriculture (AESA)
Presentations
Date of Function: February 10 to 13, 2003
Amount: $789.89
Location: St. Paul, Westlock, AB
Purpose: Alberta Environmentally Sustainable Agriculture (AESA) clients to
give presentations of their programs to other clients, fieldmen,
Agricultural Service Boards, partners, etc.
Function: Department of Agricultural, Food and Nutritional Science (AFNS),
University of Alberta Executive Management Seminar Series
Date of Function: February 18, 2003
Amount: $634.42
Location: Edmonton, AB
Purpose: Agri-Industrial Leader(
s) network meeting with academia,
researchers, research agencies, government representatives involved in
bioproducts sector.
Function: Agrivantage Thank You Dinner
Date of Function: March 3, 2003
Amount: $1,217.68
Location: Edmonton, AB
Purpose: To thank Agrivantage members for their hard work and commitment to
bringing the Ag Summit process to a productive, successful completion.
Function: Alberta Environmentally Sustainable Agriculture (AESA) Council
2003 Conference - Who's Rewarding Stewardship?
Date of Function: March 11 to 12, 2003
Amount: $3,112.71
Location: Red Deer, AB
Purpose: To help Alberta's Agriculture and Food industry leaders gain a
better understanding of the idea of Environmental Goods and Services and
their application on a local, provincial, national and international basis.
Function: Stakeholders Meeting Business Risk Management Programs
Date of Function: March 12, 2003
Amount: $2,404.08
Location: Calgary, AB
Purpose: Update industry on new business risk management under the
Agriculture Policy Framework
Function: Marketing Choice
Date of Function: March 19, 2003
Amount: $834.04
Location: Calgary, AB
Purpose: To discuss Alberta Test Market Proposal with industry.
Function: Conjugated Linoleic Acid (CLA) Dairy Team
Date of Function: March 24 to 29, 2003
Amount: $924.78
Location: Edmonton, AB
Purpose: Meeting with European Union (EU) Biologically Produced Conjugated
Linoleic Acid (BIOCLA) Team.
Function: Value Chain Workshop
Date of Function: March 25, 2003
Amount: $997.17
Location: Calgary, AB
Purpose: To bring together the leaders and/or champions from Alberta
Agri-food value chain developments and facilitators in a learning
opportunity that will explore the process involved. To develop possible
frameworks for their own projects.
Function: Triticale Focus Group Meeting
Date of Function: March 26, 2003
Amount: $1,036.73
Location: Nisku, AB
Purpose: Share information on research and extension related to triticale
that is currently underway. Prioritize and identify research gaps.
_______________________________________________________________________
ENVIRONMENT
CODE OF PRACTICE FOR OUTFALL STRUCTURES ON WATER BODIES [made under the
Water Act and the Water (Ministerial) Regulation]
September 2003
Table of Contents
Section
Definitions 1
Bound by the Code of Practice 2
Notice to the Director 3
Notice where the outfall structure activity is not completed
within time period 4
Emergency 5
Plans 6
Maps and class of water bodies 7
Pre-Construction 8
Construction methods and conditions 9
Restricted activity periods 10
Certification 11
Reporting 12
Record keeping and information availability 13
Monitoring of outfall structure 14
Code of Practice review and amendment 15
Schedules
1 Notice to the Director
2 Plans
Part 1, Design and Construction Standards
Part 2, Requirements for Information and Written
Specifications for Plans of Outfall structure activity
3 Construction Conditions
Part 1, Class A Water Bodies
Part 2, General Conditions for Outfall Structure
Activities in Class B, C and D Water Bodies
Part 3, Class B Water Bodies Isolation Method
Part 4, Class C Water Bodies Isolation Method
Part 5, Class D Water Bodies (Uncoded water bodies)
4 Qualified Aquatic Environment Specialist's Written
Specifications
5 Water Act Code of Practice Management Area Maps
Definitions
1(1) All
definitions in the Water (Ministerial) Regulation and in
section 1 of the Water Act apply except where expressly defined in this
Code of Practice.
(2) In this Code of Practice:
(a) "carry out" when used in the context of an outfall
structure activity includes to commence or continue an outfall structure
activity;
(b) "class" means the class of a water body that is specified
section 7, or that is designated by a class symbol on a map that is
listed in
Schedule 5;
(c) "Department" means the Department administered by the
Minister;
(d) "emergency" means a situation where there is an imminent
risk to the aquatic environment, public health or safety, or an imminent
risk of structural failure of an outfall structure;
(e) "fish" means fish used for domestic, sport and commercial
purposes, and fish of special concern, including but not limited to rare,
endangered, threatened or vulnerable species;
(f) "isolation method" means an outfall structure
construction technique in which there is an excavation of an area in the
bed or banks of a water body, and isolation of the surface water in the
water body from the excavation area, including but not limited to a flume,
dam and pump, high volume pump bypass and two stage coffer dams;
(g) "map" means a water management area map listed in
Schedule 5, and includes the legends and special conditions on a map;
(h) "mapped water body" means a water body that appears on a
map that is listed in
Schedule 5;
(i) "open method" means an outfall structure construction
technique in which there is an excavation of an area in the bed or bank of
a water body, that is not isolated from surface water in the water body;
(j) "outfall structure" means a pipe or structure in, on,
under, or adjacent to a water body, that is constructed for the discharge
of:
(
i) precipitation that has fallen and been collected, or
(ii) liquid and water-carried wastes,
to a water body, and includes any associated structure that is
required for the installation, maintenance or protection of the outfall
structure;
(k) "outfall structure activity" means the placement,
construction, installation, maintenance, replacement or removal of all or
part of an outfall structure, or any activity associated with that
placement, construction, installation, maintenance, replacement or removal;
(l) "plan" means a plan specified in
section 6;
(m) "productive capacity" means the natural capability of
habitats that comprise the aquatic environment to produce healthy fish that
are safe for human consumption, or to support or produce the naturally
occurring diversity of aquatic organisms upon which fish depend;
(n) "professional engineer" means a Professional Engineer or
Registered Professional Technologist (engineering), registered with the
Association of Professional Engineers, Geologists and Geophysicists of
Alberta;
(o) "qualified aquatic environment specialist" means a person
who:
(
i) possesses:
a post-secondary degree in biological sciences;
a technical diploma in biological sciences; or
educational equivalencies,
(ii) has a detailed knowledge of the aquatic
environment, including fish and fish habitat, management and assessment,
and
(iii) is currently experienced with:
(
A) fisheries and aquatic
environment assessment methods; and
(
B) the determination of mitigation measures
required to maintain the productive capacity of the aquatic environment,
including fish habitats in Alberta that may be adversely affected by the
carrying out of an outfall structure activity in and adjacent to the water,
bed and shore of water bodies;
(p) "restricted activity period" means the time period set
out in this Code of Practice during which, generally, no outfall structure
activity is permitted;
(q) "this Code of Practice" means the Code of Practice for
Outfall Structures on Water Bodies, published by the Department, as amended
or replaced from time to time;
(r) "uncoded water body" means a water body that appears on a
map listed in
Schedule 5, and that has no class symbol specified on the
map;
(s) "unmapped water body" means a water body that does not
appear on a map listed in
Schedule 5;
(t) "UTM coordinates" means coordinates that use the
Universal Transverse Mercator grid to identify or plot the specific
location of a site or object; and
(u) "water body" means, for the purpose of this Code of
Practice, a water body with defined bed and banks, whether or not water is
continuously present, but does not include fish bearing lakes.
Bound by Code of Practice
2 Any person who carries out an outfall structure activity shall comply
with the requirements set out in this Code of Practice.
Notice to the Director
3(1) For the purposes of
section 4 of the Water (Ministerial)
Regulation, a person who carries out an outfall structure activity must
provide notice to the Director, in writing, at least 14 calendar days
before any outfall structure activity is carried out, or within a time
specified in writing by the Director.
(2) The written notice under subsection (1):
(
a) must contain all the information specified in
Schedule 1, unless otherwise specified in writing by the Director; and
(
b) authorizes a person to carry out the outfall
structure activity in accordance with this Code of Practice for the period
of time specified in the notice.
(3) The outfall structure activity must be conducted in
accordance with the information contained in the written notice provided to
the Director under subsection (1).
(4) The person carrying out an outfall structure activity
shall provide the Director with written notice in accordance with
subsection (1), regarding any change to the information contained in the
original notice.
Notice where the outfall structure activity is not completed within time
period
4(1) Where notice is provided in accordance with
section 4(1) of the
Water (Ministerial) Regulation and
section 3 of this Code of Practice, and
the outfall structure activity has not been completed within the time
period specified in the notice, the notice is no longer valid, and a person
who carries out an outfall structure activity must provide a new notice
prior to carrying out the outfall structure activity.
(2) The new notice under subsection (1) must contain:
(
a) the new date for the commencement or continuation
of the outfall structure activity;
(
b) the information specified in clause (
i) of
Schedule
1, as applicable; and
(
c) any information that has changed from the
information provided in the original notice.
Emergency
5(1) Where there is an emergency that makes it impossible for a
person who carries out an outfall structure activity to provide notice in
accordance with
section 3, a person who carries out an outfall structure
activity must:
(
a) take appropriate measures to deal with the
emergency; and
(
b) immediately inform the Director by telephone at
1-800-222-6514 of the emergency.
(2) Information under subsection (1)(
b) must contain:
(
a) the information specified in clauses (a), (b), (d), (
e) and (
f) of
Schedule 1;
(
b) the legal description of the land on which the outfall
structure is located;
(
c) any other information regarding the nature of the
emergency that is available to the person carrying on the outfall structure
activity at the time; and
(
d) any other information requested by the Director.
(3) Within 30 days of completion of the measures required to
resolve the emergency, the person who carries out an outfall structure
activity must provide the Director with the following information:
(
a) information specified under clause (
c) in
Schedule
(
b) a description of the construction methods and
conditions as described in
section 8 and
Schedule 3, as applicable, that
were used in carrying out the outfall structure activity; and
(
c) a description of measures taken to meet the
applicable requirements of
Part 1 of
Schedule 2,
section 9 and
Schedule 3
of this Code of Practice, including a statement whether the outfall
structure activity incorporated the specifications of a qualified aquatic
environment specialist.
Plans
6(1) At least 14 days before an outfall structure activity is
carried out, a person who carries out an outfall structure activity must
prepare a plan for the outfall structure activity that contains the
following:
(
a) the written information and specifications prepared and
certified by a professional engineer as meeting the requirements specified
in
Schedule 2;
(
b) the construction methods and conditions to be used in
carrying out the outfall structure activity as determined in accordance
with sections 8, 9 and 10 and
Schedule 3, indicating the written
specifications of a qualified aquatic environment specialist, and how those
are incorporated into the plan;
(
c) an outline of the contingency measures to be taken in the
event of conditions that may cause adverse effects, taking into account any
restricted activity periods;
(
d) monitoring measures that will be used prior to and in
carrying out the outfall structure activity, as contained in the written
specifications of a professional engineer, person carrying out an outfall
structure activity and a qualified aquatic environment specialist, under
sections 8 and 9 and
Schedule 3 of this Code of Practice; and
(
e) specification of the monitoring measures that will be
taken, during the anticipated lifespan of the outfall structure, to meet
the requirements of this Code of Practice.
(2) A person who carries out an outfall structure activity
must comply with the plan prepared for the outfall structure activity under
subsection (1), except where measures must be taken to resolve an
emergency.
(3) Notwithstanding subsection (1), after notice to the Director
has been provided in accordance with
section 3(1), a person who carries out
an outfall structure activity shall not change a plan unless:
(
a) the change complies with this Code of Practice; and
(
b) notice of the change is provided to the Director in
accordance with
section 3 and
Schedule 1.
(4) Where a change is made to a plan under subsection (3),
all of the provisions of this Code of Practice apply to the change as if
the change had been included in the original plan under subsection (1).
Maps and class of water bodies
7(1) A map that is listed in
Schedule 5 forms part of this Code of
Practice and:
(
a) designates the class of a mapped water body as Class A,
B, C or D;
(
b) specifies the restricted activity period for each class
of water bodies;
(
c) provides the location of Class A and B water bodies; and
(
d) specifies special conditions for some water bodies
for the purposes of this Code of Practice, subject to subsection (5).
(2) The class of a mapped water body is the class that is
designated by a class symbol on a water management area map except:
(
a) where a mapped Class C water body is a tributary to a
Class A water body, that portion of the water body for a distance of 2
kilometres upstream from the point where it enters the Class A water body
is Class A;
(
b) where a mapped Class C water body is a tributary to a
Class B water body, that portion of the water body for a distance of 2
kilometres upstream from the point where it enters the Class B water body
is Class B;
(
c) where a mapped Class B water body is a tributary to a
Class A water body, that portion of the water body for a distance of 2
kilometres upstream from the point where it enters the Class A water body
is Class A; and
(
d) where a mapped Class D water body is a tributary to a
Class A, B or C water body, that portion of the tributary water body for a
distance of 2 kilometres upstream from the point where it enters the Class
A, B or C water body is the same class as the water body that is entered.
(3) The class of an uncoded water body is as follows:
(
a) Class D, unless otherwise specified in clause (b); and
(
b) where an uncoded water body is a tributary to a Class A,
B or C water body, that portion of the uncoded water body for a distance
of 2 kilometres upstream from the point where the uncoded water body enters
the Class A, B or C water body is the same class as the Class A, B or C
water body that is entered.
(4) The class of an unmapped water body is as follows:
(
a) where an unmapped water body enters a mapped Class
A water body, the unmapped water body:
(
i) is Class A along that portion of the unmapped
water body that is within a distance of 2 kilometres upstream from the
mouth of the unmapped water body, including where the unmapped water body
is dry or frozen to the bed of the water body at the time of the outfall
structure activity, and
(ii) is Class B for any other portion of the
unmapped water body;
(
b) where an unmapped water body enters a mapped Class
B water body, the unmapped water body:
(
i) is Class B along that portion of the unmapped
water body that is within a distance of 2 kilometres upstream from the
mouth of the unmapped water body, including where the unmapped water body
is dry or frozen to the bed of the water body at the time of the outfall
structure activity, and
(ii) is Class C along any other portion of the
unmapped water body;
(
c) where an unmapped water body enters a mapped Class
C water body, the unmapped water body:
(
i) is Class C along that portion of the unmapped
water body that is within a distance of 2 kilometres upstream from the
mouth of the unmapped water body, and
(ii) is Class C along any other portion of the
unmapped water body, and the requirements regarding restricted activity
periods under
section 10(5)(
b) apply;
(
d) where an unmapped water body enters a mapped Class
D water body, the unmapped water body is Class D; and
(
e) where an unmapped water body enters a fish bearing
water body, whether or not the fish bearing water body is mapped , the
entirety of the unmapped water body is Class C, and the requirements
regarding restricted activity periods under
section 10(6) apply.
(5) The maps identified in subsection (1), and listed in
Schedule 5, are revised with the following corrections and additions:
(
a) High Prairie Management Area
(
i) Unnamed mapped water body - the entire length
of an Unnamed Creek (Twp 87 Rge 04 W5M) connecting Peerless Lake and Graham
Lake is designated as a Class C Water Body having a Restricted Activity
Period of September 10 to July 15.
(
b) Edson Management Area
(
i) Cardinal River - the Restricted Activity Period for
the entire mapped length of the Cardinal River and its tributaries upstream
of the confluence with the Brazeau River is changed to the period of
September 1 to April 30 and May 15 to August 15.
(
c) Pincher Creek Management Area
(
i) Crowsnest River and tributaries - the Restricted
Activity Period for the Crowsnest River, from Crowsnest Lake to Secondary
Highway 507, and for the three mapped water bodies entering this reach of
the Crowsnest River from the south, is changed to the period of September 1
to April 5 and May 15 to July 15.
(
d) Lethbridge Management Area
(
i) The Restricted Activity Period for all water bodies
within the Lethbridge Management Area having a "Yellow" colour code,
excepting the named water body Rolph Creek, is changed to the period of
April 1 to May 31.
(ii) St. Mary River - the Restricted Activity Period for
the St. Mary River from the confluence with Pothole Creek to the confluence
with the Oldman River is changed to the period of September 1 to August 15.
(iii) Oldman River - the Restricted Activity Period for
the Oldman River from the confluence of the Belly River to the confluence
of the St. Mary River is changed to the period of September 1 to August 15.
(
e) Fort McMurray Management Area
(
i) McKay River tributary - the Restricted Activity
Period for the mapped Class C water body entering the McKay River at Sec 27
Twp 92 Rge 12 W4M is changed to the period of April 16 to July 15.
(
f) Lac La Biche Management Area
(
i) La Biche River - the designation of the portion of
the La Biche River in Twp 69 Rge 17 W4M is changed from a Class A water
body to a Class C water body with a Restricted Activity Period of April 16
to July 15.
(
g) St. Paul Management Area
(
i) Uncoded water body the designation of an uncoded
water body, locally known as Oldman Creek, which is a tributary to the
North Saskatchewan River, for a distance of 2 kilometres upstream from the
road allowance located between SW 26 and SE 27, Twp 53, Rge 23 W4M, is
designated as a Class C water body with a Restricted Activity Period of
October 16 to June 30.
(
h) Camrose Management Area
(
i) Unnamed water body - the designation of the mapped
water body in Twp 41 Rge 1- 2 W4M running from Gillespie Lake to Killarney
Lake is changed from a Class C water body to a Class D water body.
(
i) Rocky Mountain House Management Area
(
i) Dogpound Creek - the Restricted Activity Period for
Dogpound Creek and all mapped Class C water bodies that are tributaries to
Dogpound Creek downstream from Secondary Highway 582 to the confluence with
the Little Red Deer River is changed to the period of September 16 to June
(ii) Beaver Creek - the designation of Beaver Creek as a
Class A water body is changed to designate only that portion of Beaver
Creek contained in the SW 5 Twp 36 Rge 5 W5M as a Class A water body.
(
j) Calgary Management Area
(
i) Flat Creek tributary the designation of the
mapped water body (locally known as Cutthroat Creek) in Sec 13, 24 Twp 17
Rge 5 W5M and Sec 19, 29, 33 Twp 17 Rge 4 W5M that is a tributary to Flat
Creek is changed from a Class D water body to a Class C with a Restricted
Activity Period of May 16 to August 15 and September 1 to April 30.
(ii) Sullivan Creek tributaries all mapped water
bodies that are tributaries to Sullivan Creek are designated as Class C
water bodies with a Restricted Activity Period of May 16 to August 15 and
September 1 to April 30.
(iii) Ings Creek - the Restricted Activity Period for
Ings Creek is changed to the period of May 16 to August 15 and September 1
to April 30.
(iv) Storm Creek - the designation of Storm Creek
upstream of the confluence with Mist Creek is changed from a Class C water
body to a Class A.
(
v) Highwood River and tributaries - the Restricted
Activity Period for the Highwood River upstream of the confluence with
Petisko Creek and all the mapped water bodies that are tributaries to the
Highwood River (with the exception of Storm Creek) upstream of the
confluence of the Highwood River with Cataract Creek is changed to the
period of September 1 to August 15.
(vi) Threepoint Creek and tributaries the Restricted
Activity Period for Threepoint Creek and all mapped Class C water bodies
that are tributaries to Threepoint Creek upstream of the confluence with
Pothole Creek is changed to the period of September 16 to April 15 and May
1 to August 15.
(vii) Sheep River and tributaries - the Restricted
Activity Period for the Sheep River and all mapped Class C water bodies
that are tributaries to the Sheep River upstream of the confluence with
Threepoint Creek is changed to the period of September 1 to August 15.
(viii) Elbow River - the Restricted Activity Period
for the Elbow River upstream from the Glenmore Reservoir to the confluence
with Bragg Creek is changed to the period of September 16 to April 15 and
May 1 to July 15.
(ix) Elbow River tributaries - the Restricted Activity
Period for all Class C mapped water bodies that are tributaries to the
Elbow River upstream of the confluence with Bragg Creek is changed to the
period of May 16 to August 15 and September 1 to April 30.
(
x) Jumpingpound Creek and the Little Jumpingpound
Creek - the Restricted Activity Period for Little Jumpingpound Creek (a
locally known water body that is a tributary to Jumpingpound Creek) and
Jumpingpound Creek downstream from the confluence of Little Jumpingpound
Creek is changed to the period of September 16 to April 15 and May 1 to
July 15.
(xi) Jumpingpound Creek and other tributaries - the
Restricted Activity Period for Jumpingpound Creek and mapped Class C water
bodies that are tributaries to Jumpingpound Creek upstream from the
confluence of Little Jumpingpound Creek is changed to the period of
September 1 to August 15.
(
k) Canmore Management Area
(
i) Smith-Dorrien Creek - the designation of
Smith-Dorrien Creek is changed from a Class B water body to a Class A.
(ii) Jumpingpound Creek and tributaries - the Restricted
Activity Period for Jumpingpound Creek and mapped Class C water bodies that
are tributaries to Jumpingpound Creek is changed to the period of September
1 to August 15.
(iii) Little Jumpingpound Creek - the Restricted Activity
Period for mapped Class C water bodies that form Little Jumpingpound Creek
(a locally known water body that is a tributary to Jumpingpound Creek) is
changed to the period of September 16 to April 15 and May 1 to July 15.
(iv) Bow River tributaries - the Restricted Activity Period
for mapped Class C water bodies in Twp 27 Rge 6 W5M that are tributaries to
the Bow River is changed to the period of September 16 to April 15.
(
v) Bow River tributaries located in or near Canmore,
Alberta locally known as Bill Griffiths Creek, Policeman Creek, Spring
Creek, Canmore Creek the designation of Bill Griffiths Creek as a Class A
water body is changed to apply to the entire length of Bill Griffiths
Creek. The designation of Policeman Creek, Spring Creek and Canmore Creek
as Class A water bodies is changed to Class B for their entire length with
a Restricted Activity Period of September 1 to April 30.
(vi) Ghost River tributaries - the Restricted Activity
Period for mapped Class C water bodies in Twp 26,27 Rge 7,8 W5M and Twp 27
Rge 6 W5M that are tributaries to the Ghost River is changed to the period
of May 16 to August 15 and September 1 to April 30.
Pre-Construction
8 Before any outfall structure activity is commenced, the person
carrying out the outfall structure activity must, for water bodies that are
designated as Class A, B or C water bodies, take photographs or
video-recordings of the water body at the outfall structure site as
follows:
(
a) one or more photographs or video-recordings of the water
body upstream from the outfall structure site;
(
b) one or more photographs or video-recordings of the water
body downstream from the outfall structure site; and
(
c) two or more photographs or video-recordings at the
outfall structure site, one of each bank taken from the opposite bank.
Construction methods and conditions
9(1) In addition to complying with the requirements for restricted
activity periods under
section 10, any person carrying out an outfall
structure activity shall comply with the following requirements:
(
a) each outfall structure activity must comply with the
requirements of:
(
i) clause (a), and
(ii) clause (
b) Part 1 of
Schedule 2;
(
b) for an outfall structure activity that takes place in a
Class A water body:
(
i) the construction of a new outfall structure is not
allowed,
(ii) the repair or maintenance of an existing outfall
structure must be done:
(
A) using the isolation method; or
(
B) in accordance with the written specifications
of a qualified aquatic environment specialist;
unless the water body is dry or frozen to the bed of the
water body at the time of the outfall structure repair or maintenance
activity, and
(iii) where the replacement of a
section of the outfall
structure is required, the discharge capacity of the replacement outfall
structure must not exceed the discharge capacity of the outfall structure
that existed before the replacement outfall structure activity occurred;
(
c) for an outfall structure activity that takes place in a
Class B, C or D water body, the following construction methods and
conditions for carrying out the outfall structure activity must be
followed:
(
i) for a method other than the isolation method,
Part 2 of
Schedule 3 shall be followed,
(ii) for the isolation method:
(
A) the conditions in the applicable part of
Schedule 3 shall
be followed; and
(
B) the isolation method shall be carried out in accordance
with the written specifications of a qualified aquatic environment
specialist, as determined in accordance with subsection (2) of this
section; or
(
C) carried out in accordance with
Part 5 of
Schedule 3, if
the water body is dry or frozen to the bed of the water body at the time of
the outfall structure activity.
(2) For the purposes of this section:
(
a) the determination of whether clause (
b) in
Part 1 of
Schedule 2 will be met, must:
(
i) be conducted by a professional engineer, and
(ii) take into account the technical and environmental
feasibility of the construction method or condition; and
(
b) the determination of whether a construction method or
condition will meet the requirements of clause (
a) in
Part 1 of
Schedule 2
must be conducted by a qualified aquatic environment specialist.
Restricted activity periods
10(1) Unless otherwise authorized under this section, no person shall
carry out any outfall structure activity within any applicable restricted
activity period.
(2) Subject to subsections (3), (4), (5) and (6), each
permitted outfall structure activity:
(
a) must be carried out for mapped Class A water bodies,
within the time period specified by a qualified aquatic environment
specialist;
(
b) must be carried out in mapped Class B and C water bodies,
outside the restricted activity period specified on the applicable map, or
within the time period specified by a qualified aquatic environment
specialist;
(
c) may be carried out within the restricted activity periods
for Class C water bodies that are dry or frozen to the bed of the water
body at the time of the outfall structure activity; and
(
d) on a Class D water body does not have a restricted
activity period.
(3) Where an unmapped water body enters a mapped Class A
water body:
(
a) the permitted outfall structure activity shall be carried
out within the period recommended by a qualified aquatic environment
specialist for the portion of the unmapped water body within a distance of
2 kilometres upstream from the mouth of the unmapped water body;
(
b) for any other portion of the unmapped water body other
than that specified in clause (a):
(
i) the unmapped water body has the restricted activity
period of the nearest mapped Class B or C water body entering the mapped
Class A water body, or
(ii) if there is no mapped water body entering the
mapped Class A water body, has the restricted activity period for the
mapped Class B or C water body that is immediately downstream of the mapped
Class A water body.
(4) Where an unmapped water body enters a mapped Class B
water body, the restricted activity period is the restricted activity
period for the mapped Class B water body that the unmapped water body
enters.
(5) Where an unmapped water body enters a mapped Class C
water body:
(
a) the restricted activity period for the portion of the
unmapped water body within a distance of 2 kilometres upstream from the
mouth of the unmapped water body, is the restricted activity period for the
mapped Class C water body; and
(
b) for any other portion of the unmapped water body other
than that specified in clause (a):
(
i) where there is no documented evidence of fish presence in
the unmapped water body, there is no restricted activity period, or
(ii) where there is documented evidence of fish presence in
the unmapped water body, the restricted activity period is the restricted
activity period of the nearest mapped water body that enters the mapped
Class C water body.
(6) Where an unmapped water body enters a fish bearing water
body, whether or not the fish bearing water body appears on a map, the
restricted activity period for the unmapped water body:
(
a) is the same as that specified for the nearest mapped
water body entering the fish bearing water body;
(
b) if there is no mapped water body entering the fish
bearing water body, is the same as that specified for the mapped outlet
water body of the fish bearing water body; or
(
c) if there is no mapped outlet water body of the fish
bearing water body, is the same as that specified for the nearest mapped
water body that is designated as a mapped Class C water body.
(7) All written specifications prepared by a qualified
aquatic environment specialist must:
(
a) consider all restricted activity periods; and
(
b) meet the requirements of
Schedule 4.
Certification
11(1) Where a qualified aquatic environment specialist has prepared
specifications in a plan for an outfall structure activity under
section
6(1)(
b) of this Code of Practice, a qualified aquatic environment
specialist must certify in writing that the design of the outfall structure
activity meets the requirements of clause (
a) in
Part 1 of
Schedule 2.
(2) Within one year after the outfall structure activity has
been completed, a person who carries out an outfall structure activity must
certify in writing that:
(
a) the plan prepared under
section 6 was
followed in carrying out the outfall structure activity; and
(
b) the construction of the outfall structure met the requirements of:
(
i) clause (a), and
(ii) clause (
b) Part 1 of
Schedule 2.
(3) The certifications required under subsections (1) and
(2) and subsection 6(1)(
a) shall be retained until the outfall structure has
been removed.
Reporting
12(1) (
a) A person who carries out an outfall structure
activity must immediately after a contravention of this Code of Practice,
report to the Director by telephone at (780) 422-4505; and
(
b) a report under clause (
a) must contain the details
of any contravention of this Code of Practice, including, but not limited
to:
(
i) possible adverse effects on the aquatic environment
resulting from the contravention, and
(ii) initial actions taken to mitigate the contravention.
(2) A person who carries out an outfall structure activity must,
within seven (7) calendar days of a contravention of this Code of Practice,
or within another time period specified in writing by the Director, provide
to the Director a written report, unless the requirement for the report is
waived by the Director.
(3) The written report under subsection (2) shall contain, as a
minimum, all of the following information:
(
a) a description of the contravention;
(
b) the legal land description of the location of the
contravention;
(
c) name of the water body on which the outfall structure
activity was being carried out, if available;
(
d) an explanation as to why the contravention occurred;
(
e) a
summary of all preventive measures and actions that
were taken prior to the contravention;
(
f) a
summary of all measures that were taken to mitigate any
adverse effects related to the contravention;
(
g) a
summary of proposed measures to address any remaining
adverse effects and potential adverse effects related to the contravention;
(
h) the names, addresses, phone numbers and responsibilities
of all persons carrying out the outfall structure activity at the time that
the contravention occurred;
(
i) proposed preventive measures designed to prevent future
contraventions;
(
j) any information that was maintained or recorded under
this Code of Practice, as a result of the contravention; and
(
k) any other information required by the Director in
writing.
Record keeping and information availability
13(1) A person who carries out an outfall structure activity must:
(
a) create;
(
b) compile; and
(
c) retain
the following records:
(
i) the names, addresses and phone numbers of the owners of
the outfall structure and of the person carrying out the outfall structure
activity,
(ii) a copy of the plan prepared for the outfall structure
pursuant to
section 6,
(iii) any as-built plans or as-constructed plans, if such as
built or as constructed plans were prepared,
(iv) the time period over which the carrying out of the
outfall structure activity occurred, including:
(
A) the start and completion dates; and
(
B) the duration of time each day that the outfall structure
activity occurred in the water body,
(
v) photographs or video-recordings taken of the
outfall structure before, during and after the carrying out of the outfall
structure activity,
(vi) where written specifications of a qualified aquatic
environment specialist have been included in the plan, the curriculum vitae
and relevant experience of the qualified aquatic environment specialist,
and
(vii) a copy of all certifications referred to in
section
(2) A person who carries out an outfall structure activity must
meet the following time requirements for the preparation or compilation of
the records specified in subsection (1), unless otherwise specified in
writing by the Director:
(
a) a plan under
section 6 must be prepared prior to
providing notice to the Director under
section 3;
(
b) the curriculum vitae and relevant experience of the
qualified aquatic environment specialist must be compiled prior to
providing notice to the Director under
section 3;
(
c) for records referred to in paragraphs (i), (iii), (iv)
and (
v) of subsection (1), the records must be compiled within 3 months of
completion of the outfall structure activity or within another time period
specified in writing by the Director; and
(
d) for certifications referred to in paragraph (vii) of
subsection (1), records must be compiled within the time periods specified
section 11.
(3) A person who carries out an outfall structure activity
must retain all records referred to in subsection (1) for one year after
the completion of the removal of the outfall structure.
(4) A person who carries out an outfall structure activity
must, within the time period specified in writing by the Director or an
inspector, provide to the Director or an inspector, any requested
information or records retained under subsection (1).
Monitoring of the outfall structure
14 Until the outfall structure has been removed, the person who
carried out an outfall structure activity must monitor the compliance of an
outfall structure with this Code of Practice, in accordance with the plan
prepared under
section 6.
Code of Practice review and amendment
15 The Department may institute a review and amendment of this
Code of Practice at any time.
SCHEDULE 1
Notice to the Director
(Section 3)
The following information must be contained in a notice for the purposes of
section 3:
(
a) type of outfall structure and the nature of the outfall
structure activity that is to be undertaken;
(
b) the name, address and phone number of at least one owner of the
outfall structure;
(
c) the name and phone number of the contact person for the person
carrying out the outfall structure activity;
(
d) a map, diagram, or air photo that shows the outfall structure
location in relation to the boundaries of the quarter
section that the
outfall is located in, including the legal description of the land and the
name of the water body (if named) on which the outfall structure is
located, and the UTM coordinates, if available, of the outfall structure
location;
(
e) the diameter of the outfall structure pipe and the designed
discharge capacity of the outfall structure;
(
f) the substances to be discharged from the outfall structure;
(
g) the construction methods and conditions determined in
accordance with sections 9 and 10 and
Schedule 3 that will be used in
carrying out the outfall structure activity, including, where applicable,
the rationale for the proposed construction method;
(
h) whether the outfall structure activity to be carried out will
incorporate the specifications prepared by a qualified aquatic environment
specialist, and if so, the name of the qualified aquatic environment
specialist, and consulting company name, if applicable;
(
i) the expected commencement and completion dates of the outfall
structure activity, including the estimated duration of time that the
outfall structure activity will be carried out in a water body; and
(
j) whether structures or other measures will be required to meet
clause (
a) in
Part 1 of
Schedule 2.
SCHEDULE 2
Plans
(Section 6)
PART 1
DESIGN AND CONSTRUCTION STANDARDS
The following standards must be met for the purposes of this Code of
Practice:
(
a) Upon completion of the outfall structure activity, the:
1. quantity, and
2. productive capacity
of the aquatic environment, including, but not limited to fish
habitat, at and adjacent to the outfall structure site must be equivalent
to or exceed that which existed prior to commencing the outfall structure
activity;
(
b) Upon completion of the outfall structure activity, the:
1. hydraulic,
2. hydrologic, and
3. hydrogeological
characteristics of the water body must be restored to a condition
that is equivalent to the condition that existed prior to commencing the
outfall structure activity;
(
c) The outfall structure activity must be carried out in a manner
so that none of the following occurs:
1. harm to fish or fish eggs,
2. destruction of fish or fish eggs,
3. harmful alteration, disruption or destruction of fish
habitat;
(
d) the flow of water in the water body past the outfall structure
site must be maintained at the outfall structure site at all times;
(
e) measures must be implemented to minimize the duration and
amount of disturbance of the bed and banks of the water body;
(
f) no substance or material that may have an adverse effect on the
aquatic environment shall be deposited into the water body;
(
g) the outfall structure activity shall not result in the transfer
to the outfall structure site of biota that is not indigenous to the
environment at the outfall structure site;
(
h) the person carrying out the outfall structure activity must
take all measures possible to control:
1. erosion of, or
2. sedimentation into
the water body;
(
i) debris disposal, cleanup and initial stabilization must be
carried out as part of the outfall structure activity; and
(
j) all areas on the outfall structure site:
1. that have been disturbed by the outfall structure
activity, and
2. that slope to the water body
must be stabilized within one full growing season after the
completion of the outfall structure activity.
PART 2
REQUIREMENTS FOR INFORMATION AND WRITTEN SPECIFICATIONS FOR PLANS OF
OUTFALL STRUCTURE ACTIVITY
Written specifications of a professional engineer required under
section
6(1) must:
(
a) be prepared, signed and stamped by a professional engineer;
(
b) incorporate any written specifications prepared by a qualified
aquatic environment specialist for the outfall structure activity;
(
c) include the certification by that professional engineer that
the design specifications meet the design and construction standards in
Schedule 2 of this Code of Practice; and
(
d) include the design specifications of the outfall structure
activity and other information related to the outfall structure activity,
as follows:
(
i) information on a page which is a minimum size of 21
centimetres by 27 centimetres, a minimum scale of 1:15000 and that
includes:
(
A) a map, diagram, or air photo that shows the
location of the outfall structure activity in relation to the boundaries of
the quarter
section that the outfall structure will be located in, the
legal description of the land, and the UTM coordinates, if available, on
which the outfall structure is located;
(
B) the name of the water body that the outfall structure is
or will be located on, if named;
(
C) whether the outfall structure will carry storm drainage
or wastewater;
(
D) the location of the pipe connecting to the outfall
structure shown through the width of the active floodplain of the water
body, including pipe diameter and outfall structure discharge capacity; and
(
E) all surveyed and unsurveyed profile and cross-sectional
drawings required for the design;
(ii) any hydraulic, hydrologic, or hydrogeologic analysis
performed for the design of the outfall structure, and
(iii) a description of any other specifications for the outfall
structure that were not provided on the plan or that are required in order
to comply with this Code of Practice.
SCHEDULE 3
Construction Conditions
(Section 9)
PART 1
CLASS A WATER BODIES
Where a map or
section 7 of this Code of Practice designates the water body
in which the proposed outfall structure is or will be located as a Class A
water body, the construction methods and conditions specified in
section 9
and 10 of this Code of Practice must be met.
PART 2
GENERAL CONDITIONS FOR OUTFALL STRUCTURE ACTIVITIES IN CLASS B, C AND D
WATER BODIES
(
a) If a water body is flowing at the time of the outfall structure
activity, the water body channel must not be constricted by more than
two-thirds (2/3) of its width during the carrying out of an outfall
structure activity;
(
b) Where any excavation of the bank of a water body occurs:
(
i) all material excavated from the bed or banks of the
water body must be removed and stored at a location out of the water body
until the materials are removed from the location or backfilled into the
water body,
(ii) where the width of the outfall structure site
measured between the banks of the water body is equal to or greater than 15
metres, and it is necessary to stockpile the material excavated from the
bed in the water body, the material must be stockpiled in a manner that
avoids areas of highest water velocity, and does not windrow the material
across the channel perpendicular to the flow of water,
(
c) Where isolating the location of a works:
(
i) the isolation must be carried out in a manner that
isolates the location of the outfall structure activity from the flowing
water in the water body, and eliminates the flow of surface water through
the construction site,
(ii) any berms, cofferdams or other isolation structures
used in an outfall structure activity within a flowing watercourse are to
be:
(
A) constructed of non-erodible material or
protected from erosion for the entire period of time the berm, coffer dam
or isolation structure will be in place; and
(
B) removed completely upon completion of the
outfall structure activity,
(iii) in cases where the entire flow of water of a water
body is diverted around the outfall structure site, it must be returned to
the water body downstream of the outfall structure site,
(iv) where ice is present on a water body, any diverted
water must be returned to the water body downstream of the outfall
structure site, under the ice if ice is present,
(
v) silt fences may be used in situations where there
is low flow in a water body, where appropriate, to isolate the construction
area from the water body,
(vi) during the carrying out of the outfall structure
activity, any fish that are found within the isolated portion of the
outfall structure site are to be removed, without harm to or destruction of
the fish, to an area of the water body immediately adjacent to the
watercourse crossing, outside the isolated portion of the outfall structure
site,
(vii) during a restricted activity period, when fish are
spawning or migrating, an isolation method that blocks the entire width of
a water body must not be in place for longer than 3 consecutive days,
unless upstream and downstream fish migration is accommodated,
(viii) during a period of time outside a restricted
activity period, an isolation method must not be in place for longer than
14 consecutive days unless upstream and downstream fish migration is
accommodated,
(ix) any water entering an intake of a bypass pumping system
must pass through a screen with openings that are no larger than 2.54
millimetres and at a velocity that does not result in the entrainment and
entrapment of fish or fish fry,
(
x) any accumulations of silt and sediment within the
isolation area resulting from the works in the isolation area must be
removed to an upland site prior to restoration of water flow through the
isolation site, and
(xi) any water removed from an isolation area, must be
discharged in a manner that ensures suspended sediments are not introduced
into a water body.
PART 3
CLASS B WATER BODIES ISOLATION METHOD
Where a map or
section 7 of this Code of Practice designates the water body
in which the proposed outfall structure is or will be located as a Class B
water body, in addition to the requirements under
section 9 and 10 of this
Code of Practice:
(
a) where the isolation method is used, the following requirements
must be met:
(
i) the water diverted around the outfall structure site must
be returned to the water body downstream of the outfall structure site
during the outfall structure activity,
(ii) where ice is present on the water body, the diverted
water must be returned to the water body downstream of the outfall
structure site, under the ice during the outfall structure activity,
(iii) backfill around the outfall structure must consist solely
of material of equal or better quality compared to the material that was
removed,
(iv) all material excavated from the bed or banks of the water
body must be removed and stored at a location out of the water body until
the material is used to backfill, in accordance with clause (
a) of
Part 5
of
Schedule 3,
(
v) during the carrying out of the outfall structure
activity, any fish that are found within the isolated portion of the water
body shall be removed, without harm or destruction, to an area of the water
body outside the construction site that is located immediately adjacent to
the isolated portion,
(vi) during those periods of time within a restricted activity
period, when fish are spawning or migrating, an isolation method must not
be used for longer than three consecutive days, unless upstream and
downstream fish migration is accommodated,
(vii) during any period of time outside a restricted activity
period, an isolation method must not be in place for longer than 14
consecutive days unless upstream and downstream fish migration is
accommodated,
(viii) any water entering an intake of an isolation bypass
pumping system must pass through a screen with openings that are no larger
than 2.54 millimetres and at a velocity that does not result in the
entrainment and entrapment of fish or fish fry, and
(ix) any accumulations of silt and sediment within the
isolation area in the excavation resulting from the outfall structure
activity, must be removed to a location where the materials will not enter
a water body.
PART 4
CLASS C WATER BODIES ISOLATION METHOD
Where a map or
section 7 of this Code of Practice designates the water body
in which the proposed outfall structure is or will be located as a Class C
water body, in addition to the requirements under
section 9 and 10 of this
Code of Practice, the following requirements must be met:
(
a) where the isolation method is used:
(
i) the isolation method must be carried out in a
manner that isolates the instream construction site and eliminates the flow
of surface water through the area of the excavation or will be excavated in
the water body,
(ii) the water diverted around the outfall site must be
returned to the water body downstream of the outfall site,
(iii) where ice is present on the water body, the
diverted water must be returned to the water body downstream of the outfall
site, under the ice,
(iv) backfill around the structure must consist solely
of material of equal or better quality compared to the material that was
removed,
(
v) during the carrying out of the outfall structure
activity, any fish that are found within the isolated portion of the
outfall site must be removed, without harm or destruction, to an area of
the water body outside the isolated portion that is located immediately
adjacent to the isolated portion,
(vi) during those periods of time within a restricted
activity period, when fish are spawning or migrating, an isolation method
must not be used for longer than three consecutive days, unless upstream
and downstream fish migration is accommodated,
(vii) any water entering an intake of a bypass pumping
system must pass through a screen with openings that are no larger than
2.54 millimetres and at a velocity that does not result in the entrainment
and entrapment of fish or fish fry,
(viii) any accumulations of silt and sediment within
the isolation area resulting from the outfall structure activity must be
removed to a location where the materials will not enter a water body,
(ix) all material excavated from the bed or banks of the
water body must be removed and stored at a location out of the water body
until the materials is used to backfill, and
(
x) all special conditions on each applicable Water Act
Code of Practice Management Area map must be met.
PART 5
CLASS D WATER BODIES (Uncoded water bodies)
Where a map or
section 7 of this Code of Practice designates a water body
in which the proposed outfall structure is or will be located as a Class D
water body, and where a method other than the isolation method is used, in
addition to
section 9 and 10 of this Code of Practice, the following
requirements must be met:
(
a) the backfill around the structure must consist solely of
material of equal or better quality compared to the material that was
removed; and
(
b) all material excavated from the bed or banks of the water body
must be removed and stored at a location out of the water body until the
materials is used to backfill.
SCHEDULE 4
Qualified Aquatic Environment Specialist's Written Specifications
1(1) The written specifications of a qualified aquatic environment
specialist referred to under this Code of Practice must include:
(
a) specifications on any measures required to meet the
requirements of clause (
a) in
Part 1 of
Schedule 2 of this Code of
Practice;
(
b) a copy of information gathered and assessments made
by the qualified aquatic environment specialist regarding the aquatic
environment of the water body on which the outfall structure activity will
be carried out, including fish populations and habitat, in preparing the
specifications, including but not limited to:
(
i) a list of all existing information,
published and unpublished reports reviewed,
(ii) any new information gathered through
field assessments, and
(iii) any reports prepared by the qualified
aquatic environment specialist;
(
c) the outfall location, including its legal
description, and its UTM coordinates, where known;
(
d) a
summary of physical and biological data
pertaining to the water body at the outfall structure location including:
(
i) all fish species that are present or
could be present at any time during the year,
(ii) aquatic species of special concern,
including rare, endangered, threatened or vulnerable species,
(iii) a description of existing aquatic and
riparian fish habitat,
(iv) a description of the hydrological
characteristics of the water body, and
(
v) any other relevant information
regarding the aquatic environment, including fish populations and habitat;
(
e) a description of any field assessment study sites,
the methods used during field assessments and dates and times of field
assessments;
(
f) a description of the anticipated effects of the
outfall structure activity on the water body and aquatic environment; and
(
g) the name and signature of the qualified aquatic
environment specialist and of the persons responsible for the field
assessments.
(2) A field assessment for outfall structures must be conducted:
(
a) where in the opinion of the qualified aquatic
environment specialist, the required information does not exist to prepare
the written specifications in order to meet the requirements of clause (
a) Part 1 of
Schedule 2, including where:
(
i) an alternative construction method to that specified in
section 9(1) of this Code of Practice is to be used, and
(ii) when an outfall structure activity occurs or is
anticipated to occur in a water body during a period of fish spawning, egg
incubation, fry emergence and early fry development; and
(
b) when repair or maintenance of an existing outfall
structure is carried out in a Class A water body.
SCHEDULE 5
Water Act Code of Practice Management Area Maps
1. Peace River Management Area dated April 1, 2000
2. Grande Prairie Management Area dated April 1, 2000
3. High Prairie Management Area dated April 1, 2000
4. Edson Management Area dated April 1, 2000
5. Stony Plain Management Area dated April 1, 2000
6. Pincher Creek Management Area dated April 1, 2000
7. Lethbridge Management Area dated April 1, 2000
8. Medicine Hat Management Area dated April 1, 2000
9. Fort McMurray Management Area dated April 1, 2000
10. Lac La Biche Management Area dated April 1, 2000
11. St. Paul Management Area dated April 1, 2000
12. Camrose Management Area dated April 1, 2000
13. Red Deer Management Area dated April 1, 2000
14. Rocky Mountain House Management Area dated April 1, 2000
15. Calgary Management Area dated April 1, 2000
16. Canmore Management Area dated April 1, 2000
17. Brooks Management Area dated April 1, 2000
_______________
CODE OF PRACTICE FOR WASTEWATER SYSTEMS CONSISTING SOLELY OF A WASTEWATER
COLLECTION SYSTEM
[made under the Environmental Protection and Enhancement Act, RSA 2000,
c.E-12 and the Wastewater and Storm Drainage Regulation, A.R. 119/93]
September 2003
TABLE OF CONTENTS
Part
Definitions
2. General Provisions
3. Administration, Design and Construction Requirements
4. Operational Requirements
5. Monitoring Requirements
6. Reclamation Requirements
7. Reporting Requirements
8. Record Keeping Requirements
9. Code of Practice Administration
PART 1:
DEFINITIONS
1.1 All
definitions in the Act and the regulations apply except
where expressly defined in this Code of Practice.
1.2 In this Code of Practice:
(a) "Act" means the Environmental Protection and Enhancement
Act, R.S.A. 2000, c.E-12, as amended from time to time;
(b) "grab" means, when referring to a sample, an individual
sample collected in less than 30 minutes and which is representative of the
substance sampled;
(c) "low pressure wastewater collection system" means a
wastewater collection system from which domestic wastewater is discharged
periodically into a pressure main by means of a grinder pump capable of
grinding the solids in the wastewater;
(d) "professional engineer" means a professional engineer or
registered professional technologist (engineering) under the Engineering,
Geological and Geophysical Professions Act;
(e) "regulations" means the regulations under the Act;
(f) "this Code of Practice" means the Code of Practice for
Wastewater Systems Consisting Solely of a Wastewater Collection System; and
(g) "vacuum wastewater collection system" means a wastewater
collection system from which domestic wastewater is discharged periodically
into a vacuum main, which maintains a vacuum in the system.
PART 2: GENERAL PROVISIONS
2.1.1 Any person who constructs, operates or reclaims a wastewater
system consisting solely of a wastewater collection system that discharges
into a wastewater system authorized under the Act, must do so in accordance
with this Code of Practice.
2.1.2 Any conflict between the registration application and the terms
and conditions of this Code of Practice shall be resolved in favour of this
Code of Practice.
any rights or obligations created under any other authorization issued or
adopted by Alberta Environment.
severable. If any term or condition of this Code of Practice is held
invalid, the application of such term or condition to the other
circumstances and the remainder of this Code of Practice shall not be
affected by that invalidity.
2.1.5 If the registration holder monitors for any substances or
parameters which are the subject of limits in this Code of Practice more
frequently than is required, using procedures authorized in this Code of
Practice, then the registration holder shall provide the results of such
monitoring as an addendum to the next report required by this Code of
Practice.
Section 2.2: Analytical Requirements
2.2.1 With respect to any sample required to be taken pursuant to
this Code of Practice, all samples shall be:
(
a) collected;
(
b) preserved;
(
c) stored;
(
d) handled; and
(
e) analyzed
in accordance with:
(
i) the Standard Methods for the Examination of Water
and Wastewater, published by the American Public Health Association, the
American Waterworks Association and the Water Environment Federation, as
amended or replaced from time to time,
(ii) the Methods Manual for Chemical Analysis of Water
and Wastes, published by the Alberta Research Council, as amended or
replaced from time to time, or
(iii) a method authorized in writing by the Director.
2.2.2 Any analysis of a sample required pursuant to this Code of
Practice shall be done only in an approved laboratory, unless otherwise
specified in writing by the Director.
PART 3: ADMINISTRATION, DESIGN AND CONSTRUCTION REQUIREMENTS
3.1.1 An application for a registration of a wastewater collection
system shall contain, at a minimum, all of the following information:
(
a) engineering design drawings and specifications for the
wastewater system, including the design capacity, stamped and signed by a
professional engineer;
(
b) for low pressure wastewater collection systems or vacuum
wastewater collection systems, the written opinion of a professional
engineer regarding the adequacy of the design of the wastewater system,
based, at a minimum, on the designed hydraulic capability of the wastewater
system;
(
c) a statement, signed and sealed by a professional
engineer:
(
i) indicating whether the design of the project
complies with all design requirements of this Code of Practice, and the
regulations, and
(ii) in cases in which a design requirement is not met,
identifying and justifying the deviation; and
(
d) any other information required by the Director in
writing.
PART 4: OPERATIONAL REQUIREMENTS
4.1.1 No release from the wastewater collection system to the
environment is permitted.
4.1.2 At all times, the operation of the wastewater collection system
shall be performed by, or under the direction of, a person who holds a
valid wastewater collection certificate of qualification at the applicable
level as set out in Table 4-1.
TABLE 4-1: MINIMUM WASTEWATER COLLECTION SYSTEM OPERATOR CERTIFICATE OF
QUALIFICATION REQUIREMENTS
Population Served
Minimum Wastewater Collection (WWC) Operator Certificate of Qualification
Required
Less than 500
One operator with a Small System Certificate
501 to 1,500
One operator with a Level 1 Wastewater Collection (WWC) Certificate
1,501 to 15,000
One operator with a Level 2 Wastewater Collection (WWC) Certificate
15,001 to 50,000
One operator with a Level 3 Wastewater Collection (WWC) Certificate
More than 50,000
One operator with a Level 4 Wastewater Collection (WWC) Certificate
PART 5: MONITORING REQUIREMENTS
5.1.1 In the event of an unauthorized release into the environment
from the wastewater collection system:
(
a) all steps possible must be taken to stop the release;
(
b) all steps possible must be taken to mitigate all adverse
effects of the release; and
(
c) the unauthorized release from the wastewater collection
system shall be monitored in accordance with Table 5-1, if any portion of
that unauthorized release may enter or has entered a watercourse.
TABLE 5-1: UNAUTHORIZED RELEASE MONITORING REQUIREMENTS
Parameters
Sample Type
Monitoring Location
Minimum Monitoring Frequency and Minimum Number of Samples
5 day Biochemical Oxygen demand
Total Suspended Solids
Ammonia-Nitrogen
Grab
At the release point, before any dilution
One Sample during the unauthorized release
Total Coliform
Fecal Coliform
5.1.2 In addition to the monitoring required in 5.1.1, in the event
of an unauthorized release, the total volume of any unauthorized release
from the wastewater collection system into the environment shall be:
(
a) measured, or if measurement is not possible, estimated;
and
(
b) recorded.
PART 6: RECLAMATION REQUIREMENTS
6.1.1 Where the land surface has been disturbed during construction,
expansion, modification or repair of any portion of the wastewater
collection system, reclamation of the land surface to equivalent land
capability shall be performed following the construction, expansion,
modification or repair, in accordance with Standards and Guidelines for
Municipal Waterworks, Wastewater and Storm Drainage Systems, published by
the Department, as amended or replaced from time to time.
6.1.2 At least six months prior to the wastewater collection system
permanently ceasing operation, the Director shall be informed in writing of
the intention to cease the operation.
6.1.3 Within six months after the wastewater collection system
permanently ceases operation, the registration holder shall submit to the
Director a reclamation plan.
6.1.4 The reclamation plan shall contain, at a minimum, the following
information:
(
a) a proposal for reclaiming all disturbed land to
equivalent land capability; and
(
b) any other information required by the Director in
writing.
6.1.5 Any person conducting reclamation shall do so in accordance
with the reclamation plan as authorized in writing by the Director.
PART 7: REPORTING REQUIREMENTS
Contravention Reporting
7.1.1 In addition to any other reporting required under the Act, the
regulations and this Code of Practice, the registration holder shall
immediately report any contravention of this Code of Practice to the
Director, either:
(
a) by telephone at (780) 422-4505; or
(
b) by a method:
(
i) in accordance with the release reporting provisions in
the Act and regulations, or
(ii) authorized in writing by the Director.
7.1.2 In addition to any other reporting required pursuant to the Act
or the regulations, where a contravention is reported under 7.1.1, the
registration holder shall provide a report to the Director:
(
a) in writing; or
(
b) by a method:
(
i) in accordance with the release reporting provisions
in the Act and regulations, or
(ii) authorized in writing by the Director
within seven (7) calendar days after the discovery of the
contravention or within another time period specified in writing by the
Director, unless the requirement for the report is waived by the Director.
7.1.3 The report required in 7.1.2 shall contain, at a minimum, the
following information:
(
a) a description of the contravention;
(
b) the date of the contravention;
(
c) the duration of the contravention;
(
d) the legal land description of the location of the
contravention;
(
e) an explanation as to why the contravention occurred;
(
f) a
summary of all preventive measures and actions that
were taken prior to the contravention;
(
g) a
summary of all measures and actions that were taken to
mitigate any effects and potential effects related to the contravention;
(
h) a
summary of all measures that will be taken to address
the remaining effects and potential effects related to the contravention;
(
i) the number of the registration issued under the Act for
the wastewater system and the name of the person who held the registration
at the time the contravention occurred;
(
j) the name, address, phone number and responsibilities of
the person operating the wastewater collection system at the time the
contravention occurred;
(
k) the name, address, phone number and responsibilities of
all persons who had charge, management or control of the wastewater
collection system at the time that the contravention occurred;
(
l) a
summary of proposed measures that will prevent future
contraventions, including a
schedule of implementation for these measures;
(
m) any information that was maintained or recorded under
this Code of Practice, as a result of the incident; and
(
n) any other information required by the Director in
writing.
PART 8: RECORD KEEPING REQUIREMENTS
8.1.1 The registration holder shall:
(
a) record; and
(
b) maintain for the life of the wastewater collection
system:
(
i) a copy of all registrations and authorizations
issued under the Act regarding the wastewater collection system,
(ii) all documentation informing the Director regarding
all extensions and replacements of any portion of the wastewater collection
system,
(iii) a copy of all documentation informing the Director
of a contravention, as required under 7.1.2 and 7.1.3,
(iv) a copy of all inspection reports issued by the
Department regarding the wastewater collection system,
(
v) the current version of the design for the
wastewater collection system,
(vi) operating procedures for the wastewater collection
system,
(vii) a copy of the reclamation plan as required in 6.1.2
and 6.1.3, and
(viii) a record of all past and current certified
operators, including updates.
PART 9: CODE OF PRACTICE ADMINISTRATION
9.1.1 This Code of Practice will be reviewed as changes in
technological or other standards warrant.
_______________
CODE OF PRACTICE FOR A WATERWORKS SYSTEM CONSISTING
SOLELY OF A WATER DISTRIBUTION SYSTEM [made under the Environmental
Protection and Enhancement Act, RSA 2000, c.E-12, as amended and the
Environmental Protection and Enhancement (Miscellaneous) Regulation, AR
118/93, as amended]
September 2003
TABLE OF CONTENTS
Part
Definitions
2 General Provisions
3 Administration, Design and Construction Requirements
4 Operational Requirements
5 Limits and Monitoring Requirements
6 Reclamation Requirements
7 Reporting Requirements
8 Record Keeping Requirements
9 Code of Practice Administration
Schedule
1 Operations Program Contents
PART 1:
DEFINITIONS
1.1 All
definitions in the Act and the regulations under the Act
apply except where expressly defined in this Code of Practice.
1.2 In this Code of Practice:
(a) "Act" means the Environmental Protection and Enhancement
Act, R.S.A. 2000, c.E-12, as amended from time to time;
(b) "continuous" means flow measurement or sample analysis
through in-line equipment that creates flow measurements or frequent,
discrete sample analysis output;
(c) "design capacity" means a production capacity for which
the waterworks system was designed, as stated in the engineering drawings
and specifications for the waterworks system, provided pursuant to 3.1.3;
(d) "disinfection" means the chemical or physical process of
treating water to inactivate microorganisms;
(e) "GCDWQ" means the Guidelines for Canadian Drinking Water
Quality, published by Health Canada, as amended or replaced from time to
time;
(f) "grab", when referring to a sample, means an individual
sample collected in less than 30 minutes and which is representative of the
substance sampled;
(g) "IMAC" means the Interim Maximum Acceptable Concentration
specified in the GCDWQ for a particular parameter;
(h) "MAC" means the Maximum Acceptable Concentration,
specified in the GCDWQ for a particular parameter;
(i) "professional engineer" means a professional engineer or
registered professional technologist (engineering) under the Engineering,
Geological and Geophysical Professions Act;
(j) "regulations" means the regulations under the Act;
(k) "Standards and Guidelines Document" means the Standards
and Guidelines for Municipal Waterworks, Wastewater and Storm Drainage
Systems, published by the Department, as amended or replaced from time to
time; and
(l) "this Code of Practice" means the Code of Practice for a
Waterworks System Consisting Solely of a Water Distribution System,
published by the Department, as amended or replaced from time to time.
PART 2: GENERAL PROVISIONS
Section 2.1: General
2.1.1 Any person who constructs, operates or reclaims a waterworks
system that consists solely of a water distribution system must do so in
accordance with this Code of Practice.
2.1.2 Any conflict between the registration application and the terms
and conditions of this Code of Practice shall be resolved in favour of this
Code of Practice.
any rights or obligations created under any other authorization issued by
the Department.
severable. If any term or condition of this Code of Practice or the
application of any term or condition is held invalid, the application of
such term or condition to other circumstances and to the remainder of this
Code of Practice shall not be affected by that invalidity.
2.1.5 If the registration holder monitors for any substances or
parameters which are the subject of limits in this Code of Practice more
frequently than is required, using procedures authorized in this Code of
Practice, then the registration holder shall provide the results of such
monitoring as an addendum to the reports required by this Code of Practice.
Section 2.2: Analytical Requirements
2.2.1 With respect to any monitoring required pursuant to this Code
of Practice, all samples shall be:
(
a) collected;
(
b) preserved;
(
c) stored;
(
d) handled; and
(
e) analyzed
in accordance with:
(
i) the Standard Methods for the Examination of Water
and Wastewater, published by the American Public Health Association, the
American Waterworks Association and the Water Environment Federation, as
amended or replaced from time to time,
(ii) the Methods Manual for Chemical Analysis of Water
and Wastes, published by the Alberta Research Council, as amended or
replaced from time to time, or
(iii) a method authorized in writing by the Director.
2.2.2 Any analysis of a sample required pursuant to this Code
of Practice, shall be done only in an approved laboratory, unless otherwise
specified in writing by the Director.
2.2.3 Any analysis of a sample for bacteriological quality required
pursuant to this Code of Practice shall be conducted only by the Alberta
Provincial Laboratory for Public Health, unless otherwise specified in
writing by the Director.
PART 3: ADMINISTRATION, DESIGN AND CONSTRUCTION REQUIREMENTS
Operations Program
3.1.1 No person shall apply for a registration unless that person has
prepared or caused to be prepared a written operations program governing
the operation of the water distribution system.
3.1.2 The operations program in 3.1.1 shall contain, at a minimum,
all of the information in
Schedule 1.
3.1.3 In addition to the information required under the Act and the
regulations, an application for a registration shall contain, at a minimum,
the following information:
(
a) written confirmation that the person applying for the
registration has prepared, or caused to be prepared an operations program;
(
b) engineering drawings signed and stamped by a professional
engineer, for the proposed water distribution system or proposed changes to
the water distribution system, including the design capacity of the
proposed water distribution system or proposed change;
(
c) a statement, signed and stamped by a professional
engineer, indicating whether the design of the project complies with the
design requirements of:
(
i) this Code of Practice, and
(ii) the regulations under the Act; and
(
d) in cases in which a design requirement in clause (
c) is
not met, a statement, signed and stamped by a professional engineer,
identifying and justifying the deviation.
3.1.4 No person shall install any treatment equipment that was not
included in the registration application unless the Director has been
advised in writing in advance of the intention to install that treatment
equipment.
PART 4: OPERATIONAL REQUIREMENTS
4.1.1 The water distribution system shall be:
(
a) operated; and
(
b) maintained
at all times within its design capacity.
4.1.2 The registration holder shall maintain a minimum pressure of
150 kPa at all points in the water distribution system, at all times.
4.1.3 The registration holder shall prevent any structural or
equipment malfunction in the water distribution system that may affect the
quality or distribution of potable water.
Certified Operator
4.1.4 At all times, the operation of the water distribution system
shall be performed by, or under the direction of, a person who holds a
valid certificate of qualification at the applicable level as set out in
Table 4-1.
4.1.5 At all times, the number of certified operators available to
perform or direct the operation of the water distribution system must meet
or exceed the applicable numbers in Table 4-1.
TABLE 4-1: MINIMUM WATER DISTRIBUTION SYSTEM OPERATOR CERTIFICATE OF
QUALIFICATION REQUIREMENTS
Population Served by Water Distribution System
Minimum Number and Minimum Qualifications of Water Distribution Certified
Operator(s)