B.C. Reg. 289/2020 , deposited December 18, 2020, under the OIL AND GAS ACTIVITIES ACT [section 111]. Regulation of the Board of the Oil and Gas Commission, dated December 18, 2020.
The Board of the Oil and Gas Commission orders that the Pipeline Regulation, B.C. Reg. 281/2010,
is amended as set out in the attached Schedule.
— F. MIHLAR, Chair, Board of Directors .
Schedule
Section 7 (1) to (4) of the Pipeline Regulation, B.C. Reg. 281/2010, is repealed
and the following substituted:
(1) In this section:
"damage prevention program" means a program for the purpose of anticipating and preventing damage to a permit
holder's pipeline;
"pipeline integrity management program" means a program for the purpose of managing the integrity of a permit holder's pipeline
and that complies with CSA Z662 and Annex N of CSA Z662.
(2) A pipeline permit holder must not operate a pipeline approved by the permit
unless
(
a) the holder has first prepared a damage prevention program, and
(
b) the pipeline is operated in accordance with the damage prevention program.
(3) A pipeline permit holder must not construct or operate a pipeline approved
by the permit unless the holder has first prepared a pipeline integrity management
program.
(4) A pipeline permit holder must not construct, operate, maintain, repair, deactivate
or abandon a pipeline approved by the permit unless the pipeline is constructed, operated,
maintained, repaired, deactivated or abandoned in accordance with the permit holder's
pipeline integrity management program.
Section 9 is repealed and the following substituted:
Deactivation
(1) This
section applies if, for a period of 18 consecutive calendar months, a pipeline
permit holder does not transport fluids through the holder's permitted pipeline or
part of the pipeline.
(2) The period referred to in subsection (1) begins, as applicable,
(
a) the day after the last day fluid is transported through the permitted pipeline
or part of the pipeline, if the pipeline or part has been used to transport fluids,
(
b) the day after construction of the permitted pipeline or part of the pipeline
is completed, if the pipeline or part has not been used to transport fluids.
(3) Before the expiry of the period referred to in subsection (1), the pipeline
permit holder must do one of the following:
(
a) deactivate the permitted pipeline or part of the pipeline and notify the commission
on completion of the deactivation;
(
b) submit to the commission a plan to deactivate the permitted pipeline or part
of the pipeline after the end of that period;
(
c) submit to the commission a plan for resuming or beginning, as applicable,
the transportation of fluids through the permitted pipeline or part of the pipeline.
(4) If a plan is submitted to the commission under subsection (3) (
b) or (c),
(
a) the plan must be approved by the commission, and
(
b) the pipeline permit holder must implement the plan as approved by the commission.