B.C. Reg. 295/2001

The British Columbia Gazette,

Part II

December 31, 2001

B.C. Reg. 295/2001, deposited December 17, 2001, pursuant to the ASSESSMENT ACT [Section 20.1]. Order in Council 1080/2001, approved and ordered December 14, 2001.

On the recommendation of the undersigned, the Lieutenant Governor, by and with the advice and consent of the Executive Council, orders that the Depreciation of Dams, Power Plants and Substations Regulation, B.C. Reg. 395/99, is amended as set out in the attached schedule. — G. ABBOTT, Minister of Community, Aboriginal and Women's Services; G. CAMPBELL, Presiding Member of the Executive Council.

Schedule

Section 2 of the Depreciation of Dams, Power Plants and Substations Regulation, B.C. Reg.

395/99, is amended by adding the following subsection:

(4) Despite subsection (1) and

section 3, if the assessor determines, as of October 31 of any year, that a substation has a physical capacity which is at least 100% greater than the operational capacity requirements of that substation for the previous 12 months, the cost of the improvements at that substation must be reduced by 25% before application of the depreciation determined otherwise under this regulation for valuation of that

substation for the next assessment roll.

Schedule A is repealed and the following

schedule is substituted:

ELECTRICAL POWER GENERATING FACILITIES

DEPRECIATION RATES

DAMS

DAM IMPROVEMENTS

DEPRECIATION

(Straight Line Depreciation

Per

Annum

Maximum

DAM — STRUCTURE

(

i) well maintained

(ii) average maintenance

0.70%

0.70%

45.00%

50.00%

HEAD GATES

1.25%

65.00%

SURGE TANK

1.25%

65.00%

STEEL PENSTOCK

2.00%

65.00%

WOOD PENSTOCK

2.00%

75.00%

TUNNEL

(

i) well maintained

(ii) average maintenance

0.70%

0.70%

45.00%

50.00%

CONCRETE TUNNEL LINER

2.00%

65.00%

STEEL TUNNEL LINER

1.50%

65.00%

Schedule B is repealed and the following

schedule is substituted:

ELECTRICAL POWER GENERATING FACILITIES

DEPRECIATION RATES

POWER PLANTS

POWER PLANT IMPROVEMENTS

DEPRECIATION

(Straight Line Depreciation)

Per

Annum

Maximum

POWER PLANTS

1.25%

65.00%

Copyright © 2001: Queen's Printer, Victoria, British Columbia, Canada

Document details

CollectionBritish Columbia — Gazette
CitationB.C. Reg. 295/2001
Typegazette
Volume / chapterbcgaz2 v44n25 295 2001
Languageen
Formatxml
SourcePROVINCIAL
Identifier8d1a98633a14c8ba011e9712005c2824dc622d12

Source file is stored in the law ingest library (xml).