Alberta Gazette, Part I — Friday, November 15, 2024
Friday, November 15, 2024
Alberta — Gazette
The Alberta Gazette
Part I
Vol. 120 Edmonton, Friday, November 15, 2024 No. 21
APPOINTMENTS
Appointment of Non-Presiding Justice of the Peace
(Justice of the Peace Act)
October 22, 2024
Cabay, Alison Mary of Wetaskiwin
Ghazar, Isabel Toni of Calgary
John, Angelene Nixon of Edmonton
Kreil, Caitlin Faith of Wetaskiwin
Poitras, Jenna Marie of St. Paul
Thompson, Mattea Emily of Red Deer
GOVERNMENT NOTICES
Advanced Education
Hosting Expenses Exceeding $600.00
For the period July 1, 2024 to September 30, 2024
Function: 2022 and 2023 Awards of Excellence Event
Date: June 21, 2024
Amount: $29,191.32
Location: Northern Alberta Institute of Technology (NAIT), Edmonton, Alberta
Agriculture and Irrigation
Form 15
(Irrigation Districts Act)
(Section 88)
Notice to Irrigation Secretariat:
Change of Area of an Irrigation District
On behalf of the St. Mary River Irrigation District, I hereby request that the
Irrigation Secretariat forward a certified copy of this notice to the Registrar of Land
Titles for the purposes of registration under
section 22 of the Land Titles Act and
arrange for notice to be published in the Alberta Gazette.
The following parcels of land should be added to the irrigation district and the
appropriate notation added to the certificate of title:
LINC Number
Short Legal Description as shown on title
Title Number
0022 651 889
4;13;8;12;NW
231 337 504 +2
0022 702 864
4;12;10;5;SW
091 322 332 +2
I certify the procedures required under
part 4 of the Irrigation Districts Act have been
completed and the area of the St. Mary River Irrigation District should be changed
according to the above list.
Rebecca Fast, Office Administrator,
Irrigation Secretariat.
Energy and Minerals
Declaration of Withdrawal from Unit Agreement
(Petroleum and Natural Gas Tenure Regulations)
The Minister of Energy and Minerals on behalf of the Crown in Right of Alberta
hereby declares and states that the Crown has withdrawn as a party to the agreement
entitled "Lochend Cardium Agreement No. 6" effective September 30, 2024.
Stacey Szeto, for Minister of Energy and Minerals.
_______________
The Minister of Energy and Minerals on behalf of the Crown in Right of Alberta
hereby declares and states that the Crown has withdrawn as a party to the agreement
entitled "Provost Sparky Agreement No. 7" effective September 30, 2024.
Stacey Szeto, for Minister of Energy and Minerals.
The Minister of Energy and Minerals on behalf of the Crown in Right of Alberta
hereby declares and states that the Crown has withdrawn as a party to the agreement
entitled "Provost Viking Agreement No. 26" effective September 30, 2024.
Stacey Szeto, for Minister of Energy and Minerals.
_______________
The Minister of Energy and Minerals on behalf of the Crown in Right of Alberta
hereby declares and states that the Crown has withdrawn as a party to the agreement
entitled "Provost Viking Agreement No. 33" effective September 30, 2024.
Stacey Szeto, for Minister of Energy and Minerals.
_______________
The Minister of Energy and Minerals on behalf of the Crown in Right of Alberta
hereby declares and states that the Crown has withdrawn as a party to the agreement
entitled "Wainwright Unit No. 13" effective September 30, 2024.
Stacey Szeto, for Minister of Energy and Minerals.
_______________
The Minister of Energy and Minerals on behalf of the Crown in Right of Alberta
hereby declares and states that the Crown has withdrawn as a party to the agreement
entitled "Wainwright Unit No. 17" effective September 30, 2024.
Stacey Szeto, for Minister of Energy and Minerals.
_______________
The Minister of Energy and Minerals on behalf of the Crown in Right of Alberta
hereby declares and states that the Crown has withdrawn as a party to the agreement
entitled "Wayne-Rosedale Basal Quartz Agreement No. 6" effective September 30,
Stacey Szeto, for Minister of Energy and Minerals.
Production Allocation Unit Agreement
(Mines and Minerals Act)
Notice is hereby given, pursuant to
section 102 of the Mines and Minerals Act, that
the Minister of Energy and Minerals on behalf of the Crown has executed
counterparts of the agreement entitled "Production Allocation Unit Agreement -
Leduc-Woodbend Rex Agreement No. 16" and that the Unit became effective on
August 1, 2023.
Notice is hereby given, pursuant to
section 102 of the Mines and Minerals Act, that
the Minister of Energy and Minerals on behalf of the Crown has executed
counterparts of the agreement entitled "Production Allocation Unit Agreement -
Morinville Upper Mannville Agreement No. 2" and that the Unit became effective on
October 1, 2023.
Notice is hereby given, pursuant to
section 102 of the Mines and Minerals Act, that
the Minister of Energy and Minerals on behalf of the Crown has executed
counterparts of the agreement entitled "Production Allocation Unit Agreement -
Ukalta Clearwater Agreement No. 2" and that the Unit became effective on July 1,
Notice is hereby given, pursuant to
section 102 of the Mines and Minerals Act, that
the Minister of Energy and Minerals on behalf of the Crown has executed
counterparts of the agreement entitled "Production Allocation Unit Agreement -
Workman Wabamun Agreement No. 12" and that the Unit became effective on
November 1, 2023.
Production Allocation Unit Agreement
Oil Sands
(Mines and Minerals Act)
Notice is hereby given, pursuant to
section 102 of the Mines and Minerals Act, that
the Minister of Energy and Minerals on behalf of the Crown has executed
counterparts of the agreement entitled "Production Allocation Unit Agreement -
Lindbergh Waseca Agreement No. 1" and that the oil sands Unit became effective on
August 1, 2023.
Notice is hereby given, pursuant to
section 102 of the Mines and Minerals Act, that
the Minister of Energy and Minerals on behalf of the Crown has executed
counterparts of the agreement entitled "Production Allocation Unit Agreement -
Lindbergh Waseca Agreement No. 2" and that the oil sands Unit became effective on
August 1, 2023.
Notice is hereby given, pursuant to
section 102 of the Mines and Minerals Act, that
the Minister of Energy and Minerals on behalf of the Crown has executed
counterparts of the agreement entitled "Production Allocation Unit Agreement -
Lindbergh Waseca Agreement No. 3" and that the oil sands Unit became effective on
August 1, 2023.
Infrastructure
Contract Increases Approved Pursuant to Treasury Board Directive 02/2005
Contract: Calgary Bridgeland Riverside Continuing Care Centre and Construction of
New Facility
Contractor: Clark Builders
Reason for Increase: Change Orders 220 to 274: Additional costs associated with
structural revisions. Additional trade impact costs being realized due to the project
schedule extension. Additional contaminated soil and waste removal costs. Additional
guardrail and interior finish modifications. BMS, Fire Alarm, and safety system
modifications. Mechanical and Electrical revisions.
Contract increases were reported to Alberta Gazette in 2023/24 Q4 for an increase of
$12,325,873.44; 2024/25 Q1 for an increase of $16,689,194.46; current increase for
2024/25 Q2 is $27,158,285.30. Contract change percentage is cumulative.
Contract Amount: $85,864,280.00
% Increase: 65%
Amount of Increase: $56,173,353.20
Contract: Calgary - Calgary Remand Centre - Replace HVAC System
Contractor: PCL Construction Management Inc.
Reason for Increase: To cover changes for additional unforeseen site conditions
including replacement of radiant heating system.
Contract Amount: $2,708,400.00
% Increase: 29%
Amount of Increase: $794,000.00
Contract: Calgary - FMC - Power Plant Expansion and Cogeneration Initiative -
Construction Management Services
Contractor: EllisDon Construction Services Inc.
Reason for Increase: Contract increases were reported to Alberta Gazette in
2020/21 Q1 for an increase of $8,692,455; in 2022/23 Q2 for an increase of
$7,602,274.22; in 2022/23 Q3 for an increase of $2,614,033.68; in 2022/23 Q4 for an
increase of $259,191.88; in 2023/24 Q1 for an increase of $200,847.76; in 2023/24
Q2 for an increase of $560,250.08; in 2023/24 Q3 for an increase of $758,390.65; in
2023/24 Q4 for an increase of $188,574.98; in 2024/25 Q1 for an increase of
$147,588.58; current increase for 2024/25 Q2 is $1,552,250.94.
Contract increase is for changes required to reduce risk to the existing facility,
including a revised steam blow procedure and modified tie-in procedure to the gas
line. Additionally some changes to Alberta Health Services purchased major
equipment was needed including a steam vent weather hood, a flue stack, and a
thermal mass meter. Due to
schedule extension, there was also additional cost for the
contractor, including bonding and general conditions. Contract percent is cumulative.
Contract Amount: $18,500,000.00
% Increase: 122%
Amount of Increase: $22,575,827.77
Contract: Devon Research Centre - High Head Laboratory - Lighting and Wiring
Replacement
Contractor: Western Pacific Enterprises Ltd.
Reason for Increase: There are lights located above existing 20-inch-high coal dust
extractor equipment that is in the way of accessing the original existing locations.
Existing lighting was installed prior to the equipment, making the lights nearly
inaccessible for maintenance and the equipment significantly impacts the
effectiveness of the light. The lights will be relocated mounted on the side walls to
illuminate that area, providing a safer working environment and better access for
future maintenance.
Contract Amount: $599,999.99
% Increase: 33%
Amount of Increase: $200,000.00
Contract: Edmonton - Neil Crawford Center - Elevator Modernization
Contractor: Icon Elevator Inc.
Reason for Increase: Increase of scope of work to include the replacement of the
Fire Alarm panel for compatibility and compliance with updated building code.
Contract Amount: $563,000.00
% Increase: 26%
Amount of Increase: $148,818.80
Contract: Fort Macleod - Head Smashed in Buffalo Jump - Septic Tank & Field
Replacement & Building Membrane Repairs
Contractor: Nitro Construction Ltd.
Reason for Increase: Construction of a new retaining wall due to unforeseen site
conditions is required to ensure the surrounding soil does not encroach into the
building.
Contract Amount: $4,580,800.00
% Increase: 15%
Amount of Increase: $674,800.00
Contract: Fort Saskatchewan - Provincial Warehouse Renovation - Sheriffs Quarter
Master Depot
Contractor: Graham Design Builders LP
Reason for Increase: Contract tolerance increase required due to unforeseen site
conditions requiring significant redesign to accommodate change in use of space
(new program).
Re-design is complete, resulting in significant construction changes. The additional
funds are for pending change orders associated with re-design and also account for
contingency future unknown occurrences during construction to completion.
Contract Amount: $7,691,800.00
% Increase: 44%
Amount of Increase: $3,346,486.17
Contract: Kananaskis Emergency Services Centre and Construction of New
Facilities
Contractor: Clark Builders
Reason for Increase: Contract increases were reported to the Alberta Gazette in
2021/22 Q2 for an increase of $1,384,674.54. Current increase is for $111,000.
Contract increase is to address portion of work not covered by warranty for the
removal of the existing fiber cement lap siding and replacement with industrial gauge
metal lap siding. Contract percent is cumulative.
Contract Amount: $13,184,598.00
% Increase: 11%
Amount of Increase: $1,495,674.54
Contract: Lac La Biche - Youth Assessment Centre - Modernization and Upgrades
Contractor: Binder Construction Limited
Reason for Increase: During construction improved efficiencies and functionality
were discovered regarding the heating, cooling, humidification and security systems.
Based on intended use of the facility, design improvements for HVAC and
humidification will be applied requiring a change in the work for the Contractor.
Additionally, the security system required to be connected to this building (and other
local infrastructure) has failed and requires additional work to complete the necessary
tie-ins. This additional work will be an increase in work for the Contractor.
This tolerance increase includes for contract contingency to account for any further
unforeseen occurrences.
Contract Amount: $9,320,700.00
% Increase: 28%
Amount of Increase: $2,653,426.52
Contract: Leduc - Agrivalue Processing Business Incubator - Facility Expansion
Contractor: Fillmore Construction Management Inc.
Reason for Increase: Contract increase reasons were reported to Alberta Gazette in
2022/23 Q3 for a total increase of $5,745,127.17; in 2022/23 Q4 for an increase of
$88,309.97; in 2023/24 Q1 for an increase of $553,111.61; in 2023/24 Q2 for an
increase of $23,749,95; no increase in 2023/24 Q3 & Q4; in 2024/25 Q1 for an
increase of $15,993.12; current increase for 2024/25 Q2 is $38,008.21.
The majority of the increase in the contract amount is related to scope that was
reinstated after contract award due to favorable tender results that alleviated the
anticipated budget cost pressures. Approximately 63% of the project change orders
amount is due to the reinstated scope.
Additional changes in this quarter include supply and installation of flexible sealant
and metal flashing in freezers and supply and installation of ventilation system to
electrical room. Contract percent increase is cumulative.
Contract Amount: $16,925,000.00
% Increase: 38%
Amount of Increase: $6,464,300.03
Contract: Leduc - Food Processing Development Centre - Driveway and Parking
Lots Pavement Resurfacing
Contractor: Fillmore Construction Management Inc.
Reason for Increase: During the first two phases of asphalt replacement areas were
found to have unstable sub-grades. Additional work for the removal of the base and a
lower level of clay and replacement with new compacted base of a greater depth is
required to ensure proper grade stability. Further investigation has taken place and
significant sub-grade reconstruction is also required in the remaining two phases.
Contract Amount: $1,388,000.00
% Increase: 70%
Amount of Increase: $967,685.45
Contract: Legal - Demolition of Existing Legal Ecole Citadelle
Contractor: HSMG Services & Consulting Inc.
Reason for Increase: The increase was a result of 5 change orders:
1. Removal and backfill of a Manhole and Catchbasin that was not in the original
scope but was a requirement from the AHJ for the demolition permit
($11,169.00).
2. Removal and backfill of an unknown underground tunnel that was discovered
when demolishing the foundation ($42,279.70).
3. Revise the wall assembly of the existing breezeway to the adjacent building
($15,530.95).
4. Sidewalk remediation for a demolished sidewalk that was required to complete
demolition ($12,399.88).
5. Demolition of additional concrete pad/foundation ($66,784.94).
Contract Amount: $310,000.00
% Increase: 48%
Amount of Increase: $148,164.47
Contract: Peace River - Ecole des Quatre-Vents K-12 Replacement
Contractor: GenMec ACL Inc.
Reason for Increase: Contract ID 039289 was reported to Alberta Gazette in
2022/23 Q3
1. Amount of increase reported in 2022/23 Q3 was $2,089,961.76;
2. Additional increase reported in 2022/23 Q3 was $187,696.29;
3. Additional increase reported in 2023/24 Q1 was $20,464.59;
4. Additional increase reported in 2023/24 Q3 was $278,332.78;
5. Additional increase reported in 2023/24 Q4 is $404,851.94;
6. Current increase for 2024/25 Q2 is $88,221.15.
1. The building slab was raised post tender to meet a 1:100 year ice jam event to
mitigate flood risk to the facility. The scope of work required to implement the
needed changes includes revised site improvements, revised cut/fill material for
site, revised site mechanical, revised rough grading, revised landscaping,
additional survey and testing, and
schedule extension.
2. Additional Design Fees were required to implement the needed changes related
to the building slab being raised post tender to meet a 1:100 year ice jam event to
mitigate flood risk to the facility. (Architectural coordination of Civil,
Mechanical, Electrical, Landscape redesign).
3. Additional changes in this quarter relate to adding a Site Sign and User requested
changes (Additional CTS electrical) post tender.
4. Additional changes in this quarter relate to User requested changes (Site
electrical), additional abatement.
5. Additional changes since last report relate to Item 1 (schedule delay, additional
asphalt and site concrete, additional landscaping). User requested changes.
6. Additional changes since last report relate to additional mill work (mezzanine)
and change from Phase 2 playing field seed to sod.
Note: contract percent increase is cumulative.
Contract Amount: $17,487,700.00
% Increase: 18%
Amount of Increase: $3,069,528.41
Contract: Red Deer - Red Deer Justice Centre - Prime Contractor Services
Contractor: Clark Builders
Reason for Increase: The increase is attributed to additional mechanical, electrical
and hardware scope and associated
schedule extension costs.
Contract Amount: $139,569,293.00
% Increase: 10%
Amount of Increase: $14,072,462.14
Sale or Disposition of Land
(Government Organization Act)
Name of Purchaser: Kamal Yalbir
Consideration: $262,000.00
Land Description: Plan 7621979; Block 10; Lot 12B
Excepting thereout all mines and minerals
Name of Purchaser: Kent Harry Schmidt and Bonnie Louise Schmidt
Consideration: $10,000.00
Land Description: Meridian 4 Range 24 Township 35
Section 19
All that portion of the north west quarter described as follows:
Commencing at the north west corner of the said quarter section, thence easterly
along the north boundary thereof, a distance of 528 feet, to a point, thence southerly
and parallel to the westerly boundary of the said quarter section, a distance of
247.5 feet to a point, thence westerly and parallel to the said north boundary to its
intersection with the said west boundary thence northerly along the said west
boundary to the point of commencement containing 3 acres more or less
Excepting thereout:
A) Plan 9223420 - Road - 0.085 hectares (0.21 acres) more or less
B) Plan 2220881 - Public Works (Road) - 0.080 hectares (0.20 acres) more or less
Excepting thereout all mines and minerals
Safety Codes Council
Agency Accreditation
(Safety Codes Act)
Pursuant to
Section 30 of the Safety Codes Act it is hereby ordered that
ENER-G Group, Accreditation No. A126161, Order No. 79842088
provide services under the Safety Codes Act including applicable Alberta amendments
and regulations for Electrical
Consisting of all parts of the Canadian Electrical Code
Part 1 as amended from time
to time.
Accredited Date: October 16, 2024 Issued Date: October 16, 2024.
Corporate Accreditation
(Safety Codes Act)
Pursuant to
Section 28 of the Safety Codes Act it is hereby ordered that
Canadian Natural Resources Limited (CNRL), Accreditation No. C000139,
Order No. 2812
provide services under the Safety Codes Act including applicable Alberta amendments
and regulations for Building
Consisting of all parts of the current National Building Code - Alberta Edition, and
the National Energy Code of Canada for Buildings.
Accredited Date: May 12, 2011 Issued Date: October 22, 2024.
_______________
Pursuant to
Section 28 of the Safety Codes Act it is hereby ordered that
Canadian Natural Resources Limited (CNRL), Accreditation No. C000139,
Order No. 384
provide services under the Safety Codes Act including applicable Alberta amendments
and regulations for Electrical
Consisting of all parts of the current Canadian Electrical Code
Part 1 and Alberta
Electrical Utility Code.
Accredited Date: March 7, 2001 Issued Date: October 22, 2024.
_______________
Pursuant to
Section 28 of the Safety Codes Act it is hereby ordered that
Canadian Natural Resources Limited (CNRL), Accreditation No. C000139,
Order No. 2839
provide services under the Safety Codes Act including applicable Alberta amendments
and regulations for Fire
Consisting of all parts of the current National Fire Code - Alberta Edition and Fire
Investigation (cause and circumstance).
Accredited Date: January 16, 2012 Issued Date: October 22, 2024.
_______________
Pursuant to
Section 28 of the Safety Codes Act it is hereby ordered that
Canadian Natural Resources Limited (CNRL), Accreditation No. C000139,
Order No. 2813
provide services under the Safety Codes Act including applicable Alberta amendments
and regulations on industrial and related facility properties owned by or under their
care and control for the discipline of Gas
Consisting of all parts of the current CAN/CSA B149.1 Natural gas and propane
installation code, CAN/CSA B149.2 Propane storage and handling code, CAN/CSA
B108.1 Compressed natural gas refuelling stations installation code, CAN/CSA
B108.2 Liquefied natural gas refuelling stations installation code,
Excluding the CAN/CSA B149.5 Natural gas for vehicles installation code,
CAN/CSA B149.3 Code for the field approval of fuel related components on
appliances and equipment, Installation code for propane fuel systems and containers
on motor vehicles.
Accredited Date: May 12, 2011 Issued Date: October 22, 2024.
_______________
Pursuant to
Section 28 of the Safety Codes Act it is hereby ordered that
Canadian Natural Resources Limited (CNRL), Accreditation No. C000139,
Order No. 2814
provide services under the Safety Codes Act including applicable Alberta amendments
and regulations for Plumbing
Consisting of all parts of the current National Plumbing Code of Canada, and Alberta
Private Sewage Systems Standard of Practice.
Accredited Date: May 12, 2011 Issued Date: October 22, 2024.
Municipal Accreditation
(Safety Codes Act)
Pursuant to
Section 26 of the Safety Codes Act it is hereby ordered that
City of Lethbridge, Accreditation No. M000104, Order No. 195
provide services under the Safety Codes Act including applicable Alberta amendments
and regulations for Fire
Consisting of all parts of the National Fire Code - 2019 Alberta Edition, and Fire
Investigation (cause and circumstance) as amended from time to time.
Accredited Date: July 4, 1995 Issued Date: October 18, 2024.
Treasury Board and Finance
Insurance Notice
(Captive Insurance Companies Act)
Effective October 31, 2024, Conserve Insurance Limited became licensed to
transact Property insurance in Alberta.
David Sorensen,
Deputy Superintendent of Insurance.
ADVERTISEMENTS
Notice of Certificate of Intent to Dissolve
(Canada Business Corporations Act)
Notice is hereby given that a Certificate of Intent to Dissolve was issued to GBCI
Canada Inc. on December 31, 2021, pursuant to
section 211 of the
Canada Business
Corporations Act.
Dated at Ottawa, Ontario, October 18, 2024.
James Leal, Solicitor, Tierney Stauffer LLP.
Public Sale of Land
(Municipal Government Act)
Town of Drumheller
Notice is hereby given that, under the provisions of the Municipal Government Act,
the Town of Drumheller will offer for sale, by public auction, at Drumheller Town
Hall, Drumheller, Alberta, on Friday, January 24, 2025, at 11:00 a.m., the following
lands:
Lot
Block
Plan
C. of T.
Address
2089BN
342 2 Street East
12-14
7710AP
116 Railway Avenue West
1032 1 Street Southwest
1121D South Railway Avenue
161017252+1
1131C South Railway Avenue
4128EQ
155 7 Street
Portion
of 3
1722JK
7 Red Deer Avenue
3324ER
649 2 Avenue
Portion
of 3
7125DD
125 3 Street
3421ED
5335 Highway 10
Each parcel will be offered for sale, subject to a reserve bid and to the reservations
and conditions contained in the existing certificate of title.
The land is being offered for sale on an "as is, where is" basis, and the Town of
Drumheller makes no representation and gives no warranty whatsoever as to the
adequacy of services, soil conditions, land use districting, building and development
conditions, absence or presence of environmental contamination, or the developability
of the subject land for any intended use by the purchaser. No bid will be accepted
where the bidder attempts to attach conditions precedent to the sale of any parcel.
The Town of Drumheller may, after the public auction, become the owner of any
parcel of land not sold at the public auction.
Terms: Accepted methods of payment are cash, certified cheque or wire transfer: 10%
of the sale price on the day of the auction and the remainder to be paid within 60 days
following the auction. GST will apply on lands sold at the public auction.
Redemption may be effected by payment of all arrears of taxes and costs at any time
prior to the sale.
Dated at Drumheller, Alberta, October 28, 2024.
Victoria Chan, CPA, CGA, LL.B, LL.M,
Chief Financial Officer/Director of Corporate & Community Services.
_______________
Village of Amisk
Notice is hereby given that, under the provisions of the Municipal Government Act,
the Village of Amisk will offer for sale, by public auction, in the Village Office, 5005
50 Street, Amisk, Alberta, on Monday, January 20, 2025, at 2:00 p.m., the following
parcel:
Roll
Lot
Block
Plan
C. of T.
1. Any parcel of land offered for sale may be redeemed by payment of all arrears,
penalties and costs by guaranteed funds at any time until the property is declared
sold.
2. Each parcel of land offered for sale will be subject to a reserve bid and title will
be subject to the reservations and conditions contained in the existing certificate
of title.
3. The lands are being offered for sale on an "as is, where is" basis, and the
municipality makes no representation and gives no warranty whatsoever as to the
state of the parcel nor its suitability for any intended use by the successful bidder.
4. The auctioneer, councillors, the chief administrative officer and the designated
officers and employees of the municipality must not bid or buy any parcel of land
offered for sale, unless directed by the municipality to do so on behalf of the
municipality.
5. The purchaser of the property will be responsible for property taxes and utilities
for the current year. There will be no adjustment to the date of sale.
6. The purchaser will be required to execute a sale agreement in form and substance
provided by the municipality.
7. The successful purchaser must, at the time of sale, make payment in cash,
certified cheque or bank draft payable to the municipality as follows:
a. The full purchase price if it is $10,000 or less; OR
b. If the purchase price is greater than $10,000, the purchaser must
provide a non-refundable deposit in the amount of $10,000 and the
balance of the purchase price must be paid within 20 days of the sale.
(if the certified cheque or bank draft exceeds the final purchase price, the
excess will be refunded within a reasonable time)
8. GST will be collected on all properties subject to GST.
9. The risk of the property lies with the purchaser immediately following the
auction.
10. The purchaser is responsible for obtaining vacant possession.
11. The purchaser will be responsible for registration of the transfer including
registration fees.
12. If no offer is received on a property or if the reserve bid is not met, the property
cannot be sold at the public auction.
13. The municipality may, after the public auction, become the owner of any parcel
of land that is not sold at the public auction.
14. Once the property is declared sold at public auction, the previous owner has no
further right to pay the tax arrears.
Dated at Amisk, Alberta, October 23, 2024.
Danielle Stankievech, Chief Administrative Officer.
_______________
Village of Carmangay
Notice is hereby given that, under the provisions of the Municipal Government Act,
the Village of Carmangay will offer for sale, by public auction, in the Village
Administration Offices, 119 Carman Street, Carmangay, Alberta, on Monday,
December 30, 2024, at 10:00 a.m., the following lands:
Roll
Lot
Block
Plan
LINC
13-14
570X
15-16
570X
1. Each parcel of land offered for sale at public auction will be subject to reserve
bid and to the reservations and conditions contained in the existing certificate of
title.
2. Redemption of a parcel of land offered for sale may be affected by certified
payment of all arrears, penalties, and costs at any time prior to 10:00 a.m. on
December 30, 2024.
3. Sales are cash or certified cheque only, paid in full by 3:00 p.m. on
December 30, 2024.
4. GST will be applied to all applicable lands sold at public auction.
5. The lands are being offered for sale on an "as is, where is" basis, and the Village
of Carmangay makes no representation and gives no warranty whatsoever as to
the adequacy of services, soil conditions, land use districting, building and
development conditions, absence or presence of environmental contamination,
vacant possession, or the develop-ability of the lands for any intended use by the
successful bidder.
6. No bid will be accepted where the bidder attempts to attach conditions to the sale
of any parcel of land.
the Village of Carmangay.
8. The successful bidder will be required to execute a Sales Agreement in a form
and substance acceptable to the Village of Carmangay at the close of the public
auction.
9. No further information is available at the public auction regarding the lands to be
sold.
10. The Village of Carmangay may, after the public auction, become the owner of
any parcel of land that is not sold at public auction.
11. The successful bidder will be responsible for their share of the transfer
registration fees.
Dated at Carmangay, Alberta, October 25, 2024.
Kelly McLeod, Chief Administrative Officer.
NOTICE TO ADVERTISERS
The Alberta Gazette is issued twice monthly, on the 15th and last day.
Notices and advertisements must be received ten full working days before the
date of the issue in which the notices are to appear. Submissions received after
that date will appear in the next regular issue.
Notices and advertisements should be typed and on a sheet separate from the covering
letter. An electronic submission by email is preferred. Email submissions may be sent
to the Editor of The Alberta Gazette at albertagazette@gov.ab.ca. The number of
insertions required should be specified and the names of all signing officers typed or
printed. Please include the name and complete contact information of the individual
submitting the notice or advertisement.
Proof of Publication: Statutory Declaration is available upon request.
A copy of the page containing the notice or advertisement will be emailed to each
advertiser without charge.
The dates for publication of Tax Sale Notices in The Alberta Gazette are as follows:
Issue of
Earliest date on which
sale may be held
November 30
January 10
December 14
January 24
December 31
February 10
January 15
February 25
January 31
March 13
February 15
March 28
February 28
April 10
March 15
April 27
March 31
May 11
April 15
May 26
April 30
June 10
May 15
June 25
The charges to be paid for the publication of notices, advertisements and documents
in The Alberta Gazette are:
Notices, advertisements and documents that are 5 or fewer pages $20.00
Notices, advertisements and documents that are more than 5 pages $30.00
Please add 5% GST to the above prices (registration number R124072513).
PUBLICATIONS
Annual Subscription (24 issues) consisting of:
Part I/Part II, and annual index - Print version $150.00
Part I/Part II, and annual index - Electronic version $150.00
Alternatives:
Single issue (Part I and
Part II) $10.00
Annual Index to
Part I or
Part II $5.00
Alberta Gazette Bound
Part I $140.00
Alberta Gazette Bound Regulations $92.00
The following shipping and handling charges apply for orders delivered outside of
Alberta, but within Canada:
Annual Subscription - Print version $50.00
Individual Gazette publications $10.00 on orders of $49.99 or less
Individual Gazette publications $15.00 on orders from $50.00 to $99.99
Individual Gazette publications $25.00 on order of $100.00 or more
Please add 5% GST to the above prices (registration number R124072513).
Copies of Alberta legislation and select government publications are available from:
Alberta King's Printer
Suite 700, Park Plaza
10611 - 98 Avenue
Edmonton, Alberta T5K 2P7
Phone: 780-427-4952
(Toll free in Alberta by first dialing 310-0000)
kings-printer@gov.ab.ca
kings-printer.alberta.ca
Cheques or money orders (Canadian funds only) should be made payable to the
Government of Alberta. Payment is also accepted by Visa, MasterCard or American
Express. No orders will be processed without payment.