Menihek Hydroelectric Generation Station Exemption Order
N.L.R. 101/24
Newfoundland and Labrador — Regulations
This is an official version.
Copyright 2025: Queen’s Printer,
St. John's, Newfoundland and Labrador, Canada
Important Information
(Includes details about the availability of printed and electronic versions of the Statutes.)
Table of Regulations
Main Site
How current is this regulation?
NEWFOUNDLAND AND
LABRADOR
REGULATION 101/24
Menihek
Hydroelectric Generation Station Exemption Order
under the
Electrical Power Control Act, 1994
and the
Public Utilities Act
(OC 2024-217)
(Filed December 23, 2024)
Under the authority of
section 5.2 of the Electrical Power Control Act, 1994
and
section 4.1 of the Public Utilities Act,
the Lieutenant-Governor in Council makes the following Order.
Dated at St. Johns, December 23, 2024.
Krista Quinlan
Clerk of the Executive Council
ORDER
Analysis
Short title
Definition
Exemption
Commencement
Short title
This Order may be cited as the Menihek
Hydroelectric Generation Station Exemption Order.
101/24 s1
Back to Top
Definition
In this Order, " Menihek
Hydroelectric generation station" means
(
a) the hydroelectric generation station and related facilities located at Menihek
Lake;
(
b) dams, dykes and other works required for the generation of power at Menihek
Lake;
(
c) transmission facilities necessary to deliver power generated at
Menihek
Lake to a suitable point of interconnection with existing transmission facilities; and
(
d) any other facilities and equipment necessary for the facilities, works or equipment referred to in paragraphs (
a) to (c).
101/24 s2
Back to Top
Exemption
Newfoundland and Labrador Hydro is
exempt from the Electrical Power Control Act, 1994
and the Public Utilities Act
for all aspects of its
activities pertaining to the Menihek
Hydroelectric generation station.
101/24 s3
Back to Top
Commencement
This Order comes into force on January 1, 2025.
101/24 s4
King's Printer