Granite Canal Hydroelectric Project Exemption Order
N.L.R. 91/00
Newfoundland and Labrador — Regulations
This is an official version.
Copyright 2018: Queen's Printer,
St. John's, Newfoundland and Labrador, Canada
Important Information
(Includes details about the availability of printed and electronic versions of the Statutes.)
Table of Regulations
Main Site
How current is this regulation?
NEWFOUNDLAND
AND LABRADOR
REGULATION 91/00
Granite
Canal
Hydroelectric Project Exemption Order
under the
Electrical Power Control Act, 1994
and the
Public Utilities Act
(O.C. 2000-169 &
O.C. 2000-170)
(Filed December 14, 2000)
Under the authority of
section 5.2 of the Electrical Power Control Act, 1994
and
section 4.1 of the Public Utilities Act
, the Lieutenant Governor in Council makes the following Order.
Dated at St. John's
, November 30, 2000.
Gary Norris
Clerk of the Executive Council
ORDER
Analysis
Short title
Definition
Exemption
Short title
This Order may be cited as the Granite
Canal
Hydroelectric Project Exemption Order.
91/00 s1
Back to Top
Definition
In this Order, "Granite Canal Hydroelectric Project" means the planning for, the environmental, economic and engineering study of, and the design and construction of
(
a) generation and related facilities at Granite
Canal
(
b) dams, dykes and other works required for the generation of power at Granite
Canal
(
c) transmission facilities necessary to deliver the power to be generated at Granite
Canal
to a suitable point of interconnection with the existing transmission facilities, and
(
d) any other facilities and equipment necessary to the Granite Canal Hydroelectric Project.
91/00 s2
Back to Top
Exemption
Newfoundland
and Labrador Hydro is exempt from the Electrical Power Control Act, 1994
and the Public Utilities Act
for all aspects of its
activities pertaining to the Granite Canal Hydroelectric Project as defined in
section 2.
91/00 s3
Queen's Printer