Oil Sands Royalty Regulation, 1997 (Alta. Reg. 185/1997)

Alta. Reg. 185/1997

Alberta — Regulations

Loading PDF viewer…

Oil Sands Royalty Regulation, 1997 (Alta. Reg. 185/1997)

Alta. Reg. 185/1997

Alberta — Regulations

© Published by Alberta King’s Printer Alberta King’s Printer Suite 700, Park Plaza 10611 - 98 Avenue Edmonton, AB T5K 2P7 Phone: 780-427-4952 E-mail: kings-printer@gov.ab.ca Shop on-line at kings-printer.alberta.ca Province of Alberta Office Consolidation Alberta Regulation 185/1997 With amendments up to and including Alberta Regulation 52/2019 Current as of September 30, 2019 MINES AND MINERALS ACT OIL SANDS ROYALTY REGULATION, 1997

Copyright and Permission Statement The Government of Alberta, through the Alberta King’s Printer, holds copyright for all Alberta legislation. Alberta King’s Printer permits any person to reproduce Alberta’s statutes and regulations without seeking permission and without charge, provided due diligence is exercised to ensure the accuracy of the materials produced, and copyright is acknowledged in the following format: © Alberta King’s Printer, 20__.* *The year of first publication of the legal materials is to be completed.

Note All persons making use of this consolidation are reminded that it has no legislative sanction, that amendments have been embodied for convenience of reference only. The official Statutes and Regulations should be consulted for all purposes of interpreting and applying the law.

(Consolidated up to 52/2019) ALBERTA REGULATION 185/97 Mines and Minerals Act OIL SANDS ROYALTY REGULATION, 1997 Table of Contents

Part 1 General 1

Definitions 2 Affiliate rules 3 Month 4 Recovery and disposition presumption 5 Provision o f information 6 Measurement 7 Cost rules 7 . 1 Application and

interpretation for cost rules 7 . 2 Cost of goods and services 7 . 3 Fair market value 7 . 4 Cost of capital assets 8 Revenue rules 9 Fair market value 1 0 GST and hedging 1 1 GAAP 1 2 Other royalty liability 12.1 Application of th is Regulation 1 3 Oil Sands Royalty Regulation, 1984 1 4 Experimental Oil Sands Royalty Regulation

Part 2 Projects 1 5 Application for approval 1 6 Approval of Project or amendment 1 7 Project description 1 8 Prior net cumulative balance 1 9 Qualifying Joint Venture Project 2 0 Amendment of approval

AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 2

Part 3 Royalty Division 1 Unit Price and Other Net Proceeds 2 1 Unit price 2 2 Other net proceeds Division 2 Crown’s Royalty Share 2 3 Royalty calculation point 2 4 Royalty free and clear 2 5 Disposition of Crown ’s royalty share 2 6 Limited agency

Part 4 Reporting and Payment Division 1 Reporting 2 7 Operator ’s forecast 2 8 Monthly report 2 9 End of Period statement 3 0 Records Division 2 Payment 3 1 Payment of royalty proceeds Division 3 Penalties and Interest 3 2 Penalties 3 3 Interest Division 4 Application of Payments 3 4 Application of payments

Part 5 Disputes 3 5 Referral of disputes

Section 1 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 3

Part 6 Transitional Provisions 3 6 Long term Crown Agreements 3 7 Amalgamated Project 3 8 Previously paid royalty 38.1 Pre-2009 inventory 38.2 Pre-2009 transitional inventory

Part 7 Consequential Amendments, Expiry and Coming into Force Consequential Amendments 3 9 Consequential Expiry 4 0 E x p i r y Coming into Force 4 1 Coming into force Schedules

Part 1 General

Definitions 1 For the purpose of

section 90 of the Mines and Minerals Act and this Regulation, (

a) repealed AR 52/2019 s4; (a.1) “allowed cost” means a co st described in

Schedule 1 and

Schedule 2; (b) “blended bitumen” means cleaned crude bitumen blended with diluent and suitable for transport by pipeline; (

c) repealed AR 89/2013 s17; (d) “cleaned crude bitumen” means crude bitumen from which impurities have been removed sufficiently to allow it, when blended with diluent, to be transported by pipeline;

Section 1 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 4 (d.1) “cogeneration plant” means a plant that is approved under the Hydro and Electric Energy Act and produces electric energy concurrently with thermal energy; (e) “cost of diluent” means, in respect of diluent blended with cleaned crude bitumen obtained pursuant to a Project to form the blended bitumen that is delivered during a month at a royalty calculation point for the cleaned crude bitumen, the cost determined in accordance with the following formula Cost = V x WAC where V is the total volume of the diluent; WAC is the weighted average cost per unit volume of that diluent calculated in accordance with the Minister’s directions; (f) “Crown’s share” means (

i) in respect of a Project t he development area of which includes oil sands rights vested in the Crown and oil sands rights vested in a person other than the Crown, the proportion of the Project substances that is allocated under a unit agreement to the tracts in the development area in which oil sands rights are vested in the Crown, and (ii) in respect of any other Project, 100%; (g) “crude bitumen” means, despite

section 1(1)(

d) of the Mines and Minerals Act, a viscous mixture, mainly of hydrocarbons heavier than pentanes, that may contain sulphur compounds and that is obtained from oil sands; (h) “cumulative cost” m eans the aggregate of (

i) the prior net cumulativ e balance of the Project, (ii) the Crown’s share of (

A) allowed costs of the Project, other than allowed costs described in

section 4 of

Schedule 1 or 2, as the case may be, and (

B) allowed costs of the Pro ject described in

section 4(

c) of

Schedule 1 or 2, as the case may be,

Section 1 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 5 a n d (iii) the proceeds paid to the Crown in respect of royalty reserved under

section 90(2) of the Mines and Minerals Act on Project substances; (i) “cumulative revenue” means the aggregate of the Crown’s share of (

i) the Project rev enue of the Project from and after the effective date, and (ii) other net proceeds receive d or receivable in respect of the Project from and after the effective date; (j) “development area” means th e area and strata described under

section 17(1)(d)(

i) in respect of a Project, and includes, from and after the effective date of a Project expansion relating to the Project, any area and strata added by virtue of the Project expansion to the area and strata so described; (k) “diluent” means hydrocarbon substances used to dilute crude bitumen for the purpose of transport from a royalty calculation point for crude bitumen; (l) “effective date” means (

i) in respect of a Project, th e effective date specified under

section 16(2)(a)(ii), and (ii) in respect of an amend ment of a Project and any Project expansion contemplated by the amendment, the effective date specified under

section 16(2)(b)(ii); (m) “gross revenue” means the Project revenue of a Project minus the cost of diluent contained in any blended bitumen included in the calculation of that Project revenue; (n) “interim Crown Agreemen t” means a contract under

section 9 of the Mines and Minerals Act designated by the Minister as an interim Crown Agreement; (o) “net loss” means the amount by which the allowed costs of a Project for a Period exceed the aggregate of the Project revenue and other net proceeds of the Project for the Period; (p) “net revenue” means the amount by which Project revenue of a Project for a Period exceeds the amount by which the allowed costs of the Project for the Period

Section 1 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 6 exceed the other net proceeds of the Project for the Period; (q) “oil sands product” means crude bitumen, cleaned crude bitumen, synthetic crude oil or any other product obtained from oil sands by processing, reprocessing or otherwise, but does not include natural gas and solution gas; (r) “operator” means the pers on specified under

section 16(2)(a)(

v) as being the initial operator of a Project, or any person subsequently identified by the Minister as being the operator of the Project; (s) “other net proceeds” of a Project for a Period means the amount described in

section 22(1); (t) “participating interest” means the proportion of the ownership in the whole of a Project that is held by a Project owner; (u) “Period” means each calen dar year or partial calendar year that occurs between the effective date of a Project and the date the approval of the Project under

section 16(1) is revoked, except that where the Project payout date occurs during the calendar year or partial calendar year, the portion of the calendar year or partial calendar year that ends on the day before the Project payout date and the portion of the calendar year or partial calendar year that commences on the Project payout date shall each be considered separate Periods; (v) “person” includes a firm, t rust, partnership, joint venture, association, government or government agency; (w) “post-payout Period” means each Period commencing on or after the Project payout date; (x) “pre-payout Period” means each Period commencing before the Project payout date; (y) “prior net cumulative balance” means (

i) in relation to a Project expansion, the amount specified under

section 16(2)(b)(iii) as the prior net cumulative balance of the Project expansion, and (ii) in relation to a Project for which the Project payout date has not occurred, the aggregate of the amount specified under

section 16(2)(a)(iii) as the prior net cumulative balance of the Project and any amounts

Section 1 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 7 specified under

section 16(2)(b)(iii) as the prior net cumulative balances of any Project expansions included in the Project; (z) “processing plant” means (

i) a facility for the extraction of crude bitumen or other oil sands product from oil sands, (ii) a facility in which crud e bitumen is processed to obtain cleaned crude bitumen, and (iii) a facility for the extr action and upgrading to synthetic crude oil or any other oil sands product of crude bitumen, cleaned crude bitumen or blended bitumen, that is approved or deemed to be approved under the Oil Sands Conservation Act; (aa) “Project” means a scheme o r operation for the recovery within Alberta of crude bitumen or any other oil sands product from oil sands, whether or not in conjunction with the further processing of the crude bitumen or other oil sands product, where the scheme or operation is approved in one or more subsisting approvals under

section 16; (bb) “Project expansion” means an addition to a Project that comes within the description of the Project under

section 16 by virtue of

section 16(2)(b)(i), but does not include a Project that is being amalgamated with another Project; (cc) “Project owner” means (

i) a lessee of oil sands rights with respect to the whole or a part of the development area of a Project, and (ii) a person who, according to the records at the Land Titles Office, has the right to recover oil sands from part of the development area of the Project; (dd) “Project payout date” means, subject to

section 36(2), (

i) the effective date of a Pr oject in the case of a Project for which the prior net cumulative balance as of the day preceding the effective date is a negative amount, or (ii) the first day of the month during which the cumulative revenue of a Project first equals the cumulative cost of the Project, in the case of any other Project;

Section 1 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 8 (ee) “Project revenue” means th e aggregate of the products obtained by multiplying (

i) each quantity of (

A) blended bitumen that contains crude bitumen recovered pursuant to a Project from the Project’s development area, and (

B) each oil sands product, other than crude bitumen referred to in paragraph (A), recovered pursuant to the Project from the Project’s development area, that is delivered at a roya lty calculation point for the crude bitumen or other oil sands product, as the case may be, then disposed of, consumed or used on or before December 31, 2008, whether before or after being further processed, b y (ii) the unit price applicable to the quantity; (ff) “Project substances” m eans oil sands and oil sands products recovered, whether before, on or after the effective date of a Project, from the development area of the Project; (gg) “Qualifying Joint Ventu re Project” means a Project specified under

section 16(2)(a)(iv) as being a Qualifying Joint Venture Project; (gg.1) “Regulator” means th e Alberta Energy Regulator; (hh) “royalty calcu lation point” means, (

i) in respect of each oil sands product recovered from the development area of a Project, the place determined under

section 23 at which the Crown’s royalty share of the product is to be calculated, and (ii) in respect of each oil sands product recovered pursuant to a Project from other than the development area of the Project, the place determined under

section 23 at which the Crown’s royalty share of the product would be calculated if the product were recovered from the development area of the Project; (ii) “synthetic crude oil” means a mixture, mainly of pentanes and heavier hydrocarbons, that may contain sulphur compounds, that is obtained from crude bitumen and that

Section 2 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 9 is liquid at the conditions under which its volume is measured; (hh.1) “solution gas” means (

i) gas that is separated from crude bitumen after recovery from a well, and (ii) gas that is dissolved in crude bitumen under initial reservoir conditions and includes any of that gas that evolves as a result of changes in pressure or temperature, or both, due to human disturbance; (jj) “unit price” means, in re lation to each kind of oil sands product obtained pursuant to a Project and delivered at a royalty calculation point for that kind of product, including blended bitumen containing crude bitumen so obtained and delivered, the price determined from time to time under

section 21. AR 185/97 s1;52/2000;156/2001;251/2001;250/2004;208/2006; 95/2007;254/2007;223/2008;89/2013;52/2019 Affiliate rules 2(1) For the purposes of this Regulation, a person is affiliated with another person if, under subsection 1206(5) of the Income Tax Regulations under the Income Tax Act (Canada), the person is considered to be connected with the other person, but in making that determination, paragraph 1206(5)(

a) shall be read as if it were replaced by the following: (

a) a person and another person (in this paragraph referred to as “that other person”) are connected with each other if (

i) the person and that other person are not dealing at arm’s length, (ii) the person has an equity percentage in that other person that is not less than 10%, or (iii) where the person is a corporation, the corporation and that other person are linked by another person who has an equity percentage in each of them of not less than 10%.

(2) For the purposes of subsection (1)(a)(i), persons are not dealing at arm’s length with each other if, under the Income Tax Act (Canada), they would not be considered to be dealing at arm’s length.

Section 3 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 10 Month 3 Where any reference is made in this Regulation to a month, whether by its name or not, the reference shall, except to the extent otherwise specified by the Minister in respect of any particular Project, be construed as being the period commencing at 8:00 a.m. on the first day of that month and ending immediately before 8:00 a.m. on the first day of the next month, except that the month of December of 2008 shall be construed as ending at midnight on December 31, 2008.

AR 185/97 s3;223/2008 Recovery and disposition presumption 4(1) Where any reference is made in a provision of this Regulation to any oil sands product recovered from a place specified in the provision, the reference shall be construed as referring to an oil sands product obtained from oil sands recovered from that place.

(2) Where any reference is made in this Regulation to the disposing or disposition of any thing, the reference shall be construed as referring to a sale or any other disposition of the thing to a person who by reason of the sale or disposition becomes its owner. Provision of information 5(1) If this Regulation requires anything to be furnished, or an amount to be paid, to the Minister on or before a day, the thing shall be considered furnished or the amount shall be considered paid, as the case may be, if it is received by the Department on or before that day.

(2) An application, report or statement required or permitted to be furnished to the Minister under this Regulation shall be in a form acceptable to the Minister.

(3) In addition to the information required by this Regulation to be contained in an application, report or statement, any application, report or statement furnished to the Minister under this Regulation shall also contain any other information called for by the form of the application, report or statement. Measurement 6(1) All measurements of oil sands, oil sands products or blended bitumen shall be in accordance with the legislation and regulations administered from time to time by the Regulator.

(2) To the extent that the legislation and regulations referred to in subsection (1) do not provide for the manner of measuring oil sands, oil sands products or blended bitumen in any particular

Section 7 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 11 situation, measurement shall be in a manner acceptable to the Regulator and the Minister. AR 185/97 s6;89/2013 Cost rules 7(1) This

section applies to any cost that is part of a calculation or determination under this Regulation or

section 90 of the Mines and Minerals Act.

(2) For the purposes of this Regulation, a cost described in subsection (1) that becomes payable on or before December 31, 2008 is deemed to be incurred (

a) in the month in which the cost is payable, if (

i) the month occurs during a pre-payout Period and the cost is paid not more than 12 months after the end of that month, or (ii) the month occurs during a post-payout Period and the cost is paid before the end of the calendar year following the Period, o r (

b) in the month in which the cost is paid, in any other case.

(3) Despite subsection (2), if services or materials have been supplied in relation to a Project by a Project owner, the operator or an affiliate of either of them and no invoice for those services or materials is subsequently sent by the Project owner, the operator or the affiliate, the cost of the services or materials is deemed to be incurred in the month in which the services were supplied or the materials were received at any part of the surface areas occupied by the Project. (4),

(5) Repealed AR 52/2000 s3. AR 185/97 s7;52/2000;251/2001;223/2008 Application and

interpretation for cost rules 7.1(1) This

section and sections 7.2 to 7.4 apply to a cost described in

section 7(1) in relation to a capital asset, good or service, other than a capital asset, good or service obtained from a person who is not affiliated with the Project owner, operator or an affiliate of either.

(2) In this

section and sections 7.2 to 7.4,

Section 7.1 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 12 (a) “amount charged to the Project” means, in relation to a capital asset, good or service, the lesser of any of the following that apply: (

i) the price that a Project owner or operator charges other Project owners in relation to the capital asset, good or service; (ii) the amount charged to a Project owner, operator or affiliate of either, by the person who provided the capital asset, good or service to the Project owner, operator or affiliate; (iii) the amount reported by t he Project owner or operator to the Crown in relation to the capital asset, good or service as an (

A) allowed cost in relation to the capital asset, good or service, or (

B) amount deducted in relation to the capital asset, good or service in the calculation of the unit price of an oil sands product; (b) “basic service” means, in relation to a Project, a service performed (

i) in order for (

A) oil sands or o il sands products to be recovered or obtained pursuant to the Project, or (

B) cleaned crude bitumen to be obtained from oil sands products obtained pursuant to the Project, whether the obtaining of the cleaned crude bitumen occurs pursuant to the Project or otherwise, a n d (ii) utilizing a capital asset th at is not part of the Project; (c) “cost of service” means, in respect of a service performed by any person, the actual cost to the person to perform the service, except that the portion of the actual cost attributable to the use of a capital asset to perform the service is (

i) an amount determined in accordance with the Minister’s directions in respect of depreciation of the capital asset, and

Section 7.2 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 13 (ii) a rate of return dete rmined in accordance with subsection (3) on the undepreciated portion of the cost of the capital asset.

(3) Unless otherwise specified by the Minister in any particular case, the rate of return referred to in subsection (2)(c)(ii) is (

a) the return allowance rate provided for in

section 90(7) of the Mines and Minerals Act that is applicable from time to time, in the case of a capital asset utilized to perform a basic service in relation to a Project, or (

b) the return allowance rate referred to in clause (

a) plus a n additional amount, if any, specified by the Minister from time to time by order or otherwise in respect of the capital asset or the applicable class of capital asset, in the case of a capital asset utilized to perform any other kind of service.

(4) For the purposes of this

section and sections 7.2 to 7.4, (

a) the providing of thermal energy for the purposes of a Project is a service, (

b) the transmission and distribution of electricity and the provision of system support services as defined in the Electric Utilities Act are services, and (

c) electricity is a good. AR 52/2000 s4;251/2001 Cost of goods and services 7.2(1) The cost of a good or service, other than a basic service, is, (

a) where the Minister is satisfied that a fair market value c an reasonably be determined for the good or service, the lesser of (

i) the amount charged to the Project for the good or service, and (ii) the fair market value of the good or service, o r (

b) where the Minister is satisfied that a fair market value cannot reasonably be determined for the good or service, and that the service is performed without utilizing a capital asset, the lesser of

Section 7.3 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 14 (

i) the amount charged to the Project for the good or service, (ii) the actual cost incurred by the Project owner, operator or affiliate of either to produce the good or perform the service, if it is not obtained by the Project owner, operator or affiliate from another person, and (iii) the actual cost incurred by the person from whom the good or service was obtained by the Project owner, operator or affiliate of either to produce the good or perform the service.

(2) The cost of (

a) a basic service, or (

b) any other service for which the Minister is satisfied that a fair market value cannot reasonably be determined and that is performed utilizing a capital asset is the lesser of the amount charged to the Project for the service and the cost of service of the person who performs the service.

(3) If a service is performed in order to produce a good referred to in subsection (1)(

b) and that service is performed utilizing a capital asset, the portion of the actual cost incurred to produce the good that is attributable to the service is (

a) the fair market value of th e service, if the Minister is satisfied that a fair market value can reasonably be determined for the service, or (

b) the cost of service of the person who performed the service, in any other case. AR 52/2000 s4 Fair market value 7.3(1) Subject to this section, in determining for the purposes of

section 7.2(1)(

a) the fair market value of a good or service, other than the transporting of an oil sands product by means of a pipeline, the Minister may, without limiting any other method of determining fair market value, adopt (

a) the price of comparable go ods or services, if that price is published and generally adopted by buyers and sellers of such goods or services,

Section 7.3 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 15 (

b) a price for comparable good s or service prescribed by the Minister pursuant to a regulation under the Act other than this Regulation, or (

c) an average of the prices p aid for comparable goods or services in transactions in which the buyers and sellers of the goods or services are not affiliates of each other.

(2) The Minister may adjust a price or average of prices referred to in subsection (1) to reflect the cost, if any, of delivery to the surface area of the Project from the place at which the price is determined.

(3) Subject to this section, in determining for the purposes of

section 7.2(1)(

a) the fair market value of transporting an oil sands product by means of a pipeline, the Minister may, without limiting any other method of determining fair market value, adopt (

a) a tariff charged for the se rvice, if the tariff is fixed or approved for such service by a regulatory authority having jurisdiction to do so, (

b) the tariff charged for th e service by the owner of the pipeline if, in the Minister’s opinion, (

i) clause (

a) does not apply, (ii) the pipeline is subject to regulation on a complaints basis, (iii) the tariff is generally a greed to and paid by persons who obtain the service of the pipeline and are not affiliated with the owner of the pipeline, (iv) the tariff is just and r easonable in the circumstances, (

v) all tariffs charged for transporting oil sands products by means of the pipeline are published, and (vi) no tariff or any other t erm for transporting oil sands products by means of the pipeline unjustly discriminates among persons seeking to obtain or obtaining such service, o r (

c) the weighted average of the prices paid by persons who are not affiliated with the owner of the pipeline for comparable service, or if the Minister is satisfied no comparable service is provided, for transporting oil sands products by means of the pipeline, if, in the Minister’s opinion,

Section 7.4 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 16 (

i) clauses (

a) and (

b) do not apply, (ii) the pipeline is subject to regulation on a complaints basis, (iii) not less than 2/3 of the quantities of oil sands products transported by means of the pipeline during the period the weighted average is adopted are owned by persons who are not affiliated with the owner of the pipeline, and (iv) the weighted average of prices is just and reasonable in the circumstances.

(4) The Minister may adjust a tariff or weighted average of prices referred to in subsection (3) to reflect differences between the terms of service applicable in respect of the tariff or weighted average of prices and the terms of service applicable in respect of the transportation service actually provided.

(5) For the purposes of subsection (3), “subject to regulation on a complaints basis” means subject to a process pursuant to legislation whereby a customer or potential customer for the transportation service can complain regarding the charge for or terms of such service, or both, to a regulatory authority having jurisdiction to hear such a complaint and to fix the charge and terms of service.

(6) Subject to subsection (7), a price, an average of prices or a tariff may be adopted by the Minister pursuant to subsection (1) or (3) for such period or periods as the Minister may specify from time to time.

(7) A price, average of prices or tariff adopted by the Minister pursuant to subsection (1) or (3) ceases to apply prior to the end of the period or periods specified under subsection (6) if any requirement specified in subsection (1) or (3) with respect to the adoption of the price, average of prices or tariff ceases to be met. AR 52/2000 s4 Cost of capital assets 7.4(1) The cost of a capital asset is the lesser of (

a) the amount charged to the Project for the capital asset, (

b) the fair market value of th e asset, where the Minister is satisfied that a fair market value can reasonably be determined, and (

c) the net book value of the asset

Section 8 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 17 (

i) to the Project owner or operator, as the case may be, if the asset is not obtained by either from another person, or (ii) to any other person from whom the asset is obtained by the Project owner or operator, when the asset is delivered to the Project site.

(2) The net book value of an asset for the purposes of this

section is the undepreciated portion of the cost to the Project owner, operator or other person for whom net book value is being determined, according to the records of (

a) the Department, if any amount payable or that would otherwise be payable, as the case may be, to the Crown under the Mines and Minerals Act, other than under this Regulation, has been reduced, satisfied, exempted from payment, waived or remitted on the basis of the whole or any portion of that cost, or (

b) the Project owner, operator or other person, respectively, in any other case. AR 52/2000 s4 Revenue rules 8(1) This

section applies to any consideration that is received or receivable and that is part of a calculation or determination under this Regulation or

section 90 of the Mines and Minerals Act.

(2) When consideration other than money is received or receivable, whether alone or in addition to money, the amount of the consideration is deemed to be the greater of (

a) its fair market value, and (

b) the value agreed to by th e persons giving and receiving the consideration.

(3) When consideration, whether in the form of money or otherwise, is received or receivable by a Project owner, the operator or a person affiliated with either of them from another member of that group of persons, the amount of the consideration is deemed to be the greater of (

a) the fair market value o f the thing for which the consideration is received or receivable, and (

b) the aggregate of the a mount of money received or receivable and the amount determined in accordance with

Section 9 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 18 subsection (2) with regard to any consideration other than money.

(4) When no consideration is received or receivable under a transaction, consideration in the amount of the fair market value of the thing for which no consideration is received or receivable is deemed to have been received or receivable. AR 185/97 s8;251/2001 Fair market value 9 For the purposes of this Regulation, a reference to fair market value shall be the value determined by the Minister on the basis of transactions occurring in comparable open markets among persons who are not affiliated. GST and hedging 10 The following shall be excluded from any cost, revenue, price, value, consideration or proceeds that is part of a calculation or determination under this Regulation or

section 90 of the Mines and Minerals Act: (

a) the amount of any taxes paid, payable or collected under

Part IX of the Excise Tax Act (Canada) by or on behalf of the Project owners of a Project; (

b) the amount of any revenues, payments and costs arising in relation to transactions that are, in the Minister’s opinion, entered into to hedge price risk in relation to a commodity or money, but not including (

i) contracts of insurance, surety, guarantee or indemnity, (ii) contracts for the forward disposition or acquisition of a commodity where delivery or receipt, respectively, of the commodity actually occurs under the contract, or (iii) contracts that hedge price risk specifically in relation to allowed costs of a Project or currency required to pay such costs. AR 185/97 s10;52/2000;251/2001 GAAP 11 Subject to this Regulation, Canadian generally accepted accounting principles shall apply in the calculation or determination of any amount under this Regulation.

Section 12 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 19 Other royalty liability 12 Nothing in this Regulation operates to relieve a lessee from (

a) the lessee’s liability to the Crown under an agreement for the payment of royalty, or (

b) the lessee’s liability under this Regulation to pay to the Crown the proceeds of royalty in respect of the Crown’s royalty share of oil sands or an oil sands product. Application of this Regulation 12.1 Unless otherwise provided in this Regulation, this Regulation applies to (

a) each Period of a Project t hat ends on or before December 31, 2008, (

b) each oil sands product obtain ed pursuant to a Project and delivered at a royalty calculation point for the product and disposed of, consumed or used on or before December 31, 2008, and (

c) the determination of the Crown’s royalty share, and of the proceeds payable in relation to the Crown’s royalty share, of the oil sands products referred to in clause (b). AR 223/2008 s53 Oil Sands Royalty Regulation, 1984 13 The Oil Sands Royalty Regulation, 1984 (AR 166/84) does not apply to Project substances recovered pursuant to a Project from the effective date of the Project until the approval under

section 16(1) in respect of the Project is revoked. Experimental Oil Sands Royalty Regulation 14 If a Project or Project expansion includes the whole or any part of an experimental project as defined in the Experimental Oil Sands Royalty Regulation (AR 347/92), that regulation does not apply to oil sands and oil sands products recovered or obtained pursuant to the experimental project, or the part of the experimental project included in the Project or Project expansion on or after the effective date of the Project or Project expansion, as the case may be.

Section 15 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 20

Part 2 Projects Application for approval 15(1) The lessees of the agreements pursuant to which oil sands are to be recovered pursuant to a proposed Project may, on or before December 31, 2008, apply to the Minister for approval of the proposed Project for the purposes of this Regulation and

section 90 of the Mines and Minerals Act.

(2) If a proposed Project includes the recovery of oil sands from oil sands rights not vested in the Crown, the application must also be made by the persons who, according to the records at the Land Titles Office, have the right to recover oil sands from the oil sands rights that are not vested in the Crown.

(3) The Project owners may, on or before December 31, 2008, apply for approval of an amendment to their Project.

(4) If a proposed amendment to a Project provides for a proposed Project expansion, the application for approval of the amendment must also be made by (

a) the lessees of the oil sand s rights with respect to any area and strata being added to the development area of the Project by the proposed expansion, and (

b) the persons who, according to the records at the Land Titles Office, have the right to recover oil sands from any area and strata being added to the development area of the Project by the proposed expansion, to the extent those lessees or persons are not already Project owners of the Project.

(5) A person who has made an application under this

section in relation to a proposed Project, or a proposed amendment to a Project, must (

a) whenever requested to do so by the Minister, consent to an examination of the records of the person that are or may be relevant to the determination of (

i) the prior net cumulative balance of the proposed Project or any proposed Project expansion, as of the effective date of the Project or of the Project expansion, as the case may be, or (ii) the cumulative cost and cumulative revenue of a Project that is being amalgamated with another

Section 16 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 21 Project pursuant to the amendment, as of the effective date of the amendment, a n d (

b) co-operate with and give a ll reasonable assistance to the person conducting the examination requested under clause (

a) for the purpose of enabling that person to conduct the examination satisfactorily. AR 185/97 s15;251/2001;223/2008 Approval of Project or amendment 16(1) The Minister may, on or before December 31, 2008, approve a proposed Project or a proposed amendment to a Project unless (

a) the proposed Project or a Project expansion proposed by the amendment contemplates the recovery of oil sands from oil sands rights not vested in the Crown, and (

b) the Minister has not entere d into a unit agreement that provides for the recovery of oil sands or oil sands products from those oil sands rights and from oil sands rights vested in the Crown.

(2) An approval under subsection (1) must specify the following: (

a) if the approval is i n respect of a Project, (

i) a description of the Project, (ii) the effective date of the Project, (iii) the prior net cumulative balance of the Project, (iv) whether or not the Project is a Qualifying Joint Venture Project, (

v) the initial operator of the Project, and (vi) any terms and conditions to which the approval of the Project is made subject; (

b) if the approval is in resp ect of an amendment to a Project, (

i) an amended description of the Project, (ii) the effective date of the amendment,

Section 17 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 22 (iii) the prior net cumulative balance of any Project expansion, if the amendment provides for such an expansion, (iv) whether or not the Project, if it was a Qualifying Joint Venture Project prior to the amendment, remains a Qualifying Joint Venture Project despite the amendment, and (

v) any terms and conditions to which the approval of the amendment is made subject.

(3) Subject to subsection (4), the effective date specified for a proposed Project or proposed amendment to a Project must not be earlier than any of the following: (

a) the first day of the month in which the application for approval of the Project or amendment is received by the Minister; (

b) the first day of the month following the month in which the proposed Project or amendment is approved by the Regulator under the Oil Sands Conservation Act; (

c) the first day of the month that precedes by 9 months the month in which the Project or amendment is approved by the Minister.

(4) Repealed AR 223/2008 s53. AR 185/97 s16;223/2008;89/2013 Project description 17(1) A description or amended description specified for a Project under

section 16(2)(a)(

i) or (b)(i) (

a) must correspond to a scheme or operation approved under the Oil Sands Conservation Act, (

b) subject to clause (c), must not include any processing plant, well or other facility not approved for development under the Oil Sands Conservation Act, (

c) may include wells and r elated transportation and measurement facilities not presently approved for development under the Oil Sands Conservation Act if the wells and facilities are on lands expressly contemplated for future development by the approval under the Oil Sands Conservation Act, and (

d) must include a description of

Section 17 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 23 (

i) the area and strata from which oil sands may be recovered pursuant to the Project, (ii) the surface areas occu pied by the Project, and (iii) the facilities included in the Project.

(2) If the ownership of a processing plant is held by one or more Project owners of a Project along with one or more persons who are not Project owners, the Minister may include in the facilities of the Project a proportion of the plant that is the same as the proportion of the ownership of the plant that is held by Project owners.

(2.1) Subject to subsection (2.2), the Minister may include in the facilities of a Project the whole or any part of a cogeneration plant or a proportion of the plant or part of the plant.

(2.2) In making a decision under subsection (2.1), the Minister must, without limiting any other factors that the Minister may consider, take into consideration the following: (

a) the extent to which thermal energy, electricity or both, produced from the plant will, in the Minister’s opinion, be utilized for the purposes of the Project; (

b) the proportionate ownersh ip of the plant by Project owners and persons who are not Project owners, where the plant is owned by both kinds of persons.

(3) In specifying a description or amended description for a Project under

section 16(2)(a)(

i) or (2)(b)(i), the Minister must, without limitation, take into consideration at least the following: (

a) whether the activities, facilities and other assets of the Project are all under common management; (

b) whether any processing pla nt of the kind described in

section 1(z)(iii) (in this subsection called an “upgrader”) proposed to be included in the Project is located outside of Alberta or includes facilities to process synthetic crude oil into more refined products; (

c) whether each part of the P roject, other than an upgrader, is or is not more than 50 kilometres distant from every other part of the Project; (

d) whether the inclusion in the Project of each part of the Project can be demonstrated to be economically justified, without taking into consideration any royalty that may be or become payable under the Mines and Minerals Act;

Section 18 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 24 (

e) in a case where (

i) any area or strata containing oil sands rights, (ii) any surface areas, or (iii) any facilities othe r than an upgrader, that are proposed to be adde d to a Project by a proposed amendment will be more than 50 kilometres distant from every other part of the Project, whether those areas, strata or facilities are substantially geographically contiguous with other parts of the Project that are not more than 50 kilometres distant from any other part of the Project. (

f) the impact of the proposed description of the Project or o f the proposed amended description of the Project on royalty payable to the Crown. AR 185/97 s17;52/2000;95/2007 Prior net cumulative balance 18(1) In determining the prior net cumulative balance of a Project or of a Project expansion the Minister must, without limitation, take into consideration at least the following: (

a) with respect to amounts to be included in determining prior net cumulative balance, (

i) the Crown’s share of (

A) the costs of the Project or of the expansion, respectively, incurred during the period of 3 years preceding the effective date of the Project or expansion, (

B) the costs of the Project or of the expansion, respectively, incurred during the period comprising the whole or the portion of the 4th and 5th years preceding the effective date of the Project or expansion, as the case may be, during which diligent and substantial action was, in the Minister’s opinion, taken toward obtaining the approval of the Regulator under the Oil Sands Conservation Act for a scheme or operation included in the Project or expansion subsequent to the 4th year preceding the effective date of the Project or expansion, as the case may be, and

Section 18 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 25 (

C) the costs of the assets of the Project or of the expansion, respectively, incurred prior to the periods referred to in paragraphs (

A) and (B), to the extent the Minister is satisfied that the use of the assets in relation to the Project after the effective date will clearly result in significant savings of costs to the Project, (ii) the aggregate of the pro ceeds of royalty paid to the Crown (

A) pursuant to an interim Crown Agreement on Project substances recovered from the development area of the Project or of the expansion, as the case may be, prior to the effective date of the Project or expansion, respectively, (

B) p u r s u a n t t o t h e Oil Sands Royalty Regulation, 1984 (AR 166/84) on Project substances recovered from the development area of the Project or expansion, as the case may be, prior to the effective date of the Project or expansion, respectively, to which an interim Crown Agreement would have applied had the Agreement not expired, and (

C) p u r s u a n t t o t h e Oil Sands Royalty Regulation, 1984 (AR 166/84) on Project substances recovered from the development area of the Project or expansion, as the case be, prior to the effective date of the Project or expansion, respectively, where the corresponding costs of so obtaining those substances have been included in prior net cumulative balance, and (iii) the amount of return allowa nce, if any, that should be included in prior net cumulative balance of the Project or expansion, as the case may be, in respect of the term of an interim Crown Agreement, if any, to which the whole or a substantial part of the Project or expansion is or was subject; (

b) with respect to amounts to be excluded or deducted in determining prior net cumulative balance, (

i) the costs referred to in clause (a)(i)(A), (

B) and (C),

Section 18 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 26 (

A) incurred during any portion of the periods referred to in those clauses when development of oil sands in the development area of the Project or the area and strata to be added to the development area by virtue of the Project expansion, as the case may be, was, in the Minister’s opinion, substantially suspended or abandoned, (

B) incurred to recover or obtain oil sands or oil sands products to which the Experimental Oil Sands Royalty Regulation (AR 347/92) applied, or (

C) the whole or any part of which would not be allowed costs under

Schedule 1 or 2, as the case may be, if they had been incurred after the effective date of the Project or Project expansion, as the case may be, (i.1) repealed AR 52/2019 s4, a n d (ii) the Crown’s share of (

A) any amounts received or receivable in respect of the Project or expansion, as the case may be, during the periods referred to in clause (a)(i)(A), (

B) and (

C) that, had they been received or receivable after the effective date of the Project or expansion, respectively, would have comprised other net proceeds of the Project, and (

B) any consideration r eceived or receivable during the periods referred to in clause (a)(i)(A), (

B) and (

C) in respect of Project substances if the Minister is of the opinion that costs incurred to recover such substances are included in prior net cumulative balance of the Project pursuant to clause (a).

(2) If the amounts to be included in prior net cumulative balance under subsection (1)(

a) exceed, or are exceeded by, the amounts to be excluded or deducted under subsection (1)(

b) in determining prior net cumulative balance, the amount of the prior net cumulative balance shall be treated as a positive amount or negative amount, respectively. AR 185/97 s18;250/2004;89/2013;52/2019

Section 19 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 27 Qualifying Joint Venture Project 19 A Project may be specified as a Qualifying Joint Venture Project if the Minister is satisfied that (

a) the Project is owned by 2 or more Project owners by way of a joint venture of those owners, (

b) the operation and management of the Project will be the sole business activity that the person who is appointed as the operator of the Project is engaged in, (

c) the joint venture referred to in clause (

a) is established for the sole purpose of producing oil sands products as described in the approvals of the Regulator for the schemes, operations and processing plants and other facilities comprising the Project, (

d) the proportionate ownership of each Project owner, relative to the ownership of the other Project owners, is (

i) the same with respect t o every agreement, oil sands right not vested in the Crown and facility, that is included in the Project, and (ii) the same as the propo rtion that the specified undivided interest held by the Project owner in those agreements, according to the records of the Department, is of all the specified undivided interests in those agreements, (

e) the person appointed as operator of the Project is assesse d for the purposes of the Income Tax Act (Canada) as having no income and no deductions, (

f) no Project owner or group o f affiliated Project owners holds a majority of participating interests in the Project, and (

g) there is a substantial degree of independence among the Project owners. AR 185/97 s19;89/2013 Amendment of approval 20 The Minister may, on or before December 31, 2008, amend or revoke an approval granted under

section 16(1) but may not amend an approval in respect of the items referred to in

section 16(2)(a)(

i) or (b)(i), unless (

a) the Project owners have applied to the Minister for an amendment of the approval in that respect, or

Section 21 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 28 (

b) the nature of the amendment is to delete an asset from the description of the Project that has been disposed of to a person who is not a Project owner. AR 185/97 s20;223/2008

Part 3 Royalty Division 1 Unit Price and Other Net Proceeds Unit price 21(1) In this section, (a) “oil sands product”, in addition to the meaning given to i t in

section 1(q), includes blended bitumen that contains crude bitumen obtained pursuant to a Project; (b) “third party disposition” means (

i) the initial disposition of an oil sands product obtained pursuant to a Project, made by or on behalf of a Project owner or the operator of the Project to a person who is not an affiliate of either of them, or (ii) a disposition of an oil sands product obtained pursuant to a Project, made by or on behalf of a person to whom the product was initially disposed of by or on behalf of the Project owner or operator, if the person is an affiliate of the Project owner or operator and disposes of the product to another person who is not an affiliate of the person or of the Project owner or operator.

(2) Subject to this section, the unit price applicable in respect of a period of time to an oil sands product obtained pursuant to a Project and delivered at a royalty calculation point for the product is the price calculated in accordance with the following formula: Unit price = TC-HC TD where TC is the total consideratio n, calculated in accordance with the Minister’s directions, received or receivable by the seller under all third party dispositions of the oil sands product during that

Section 21 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 29 period, whether those dispositions occur before or after the oil sands product is further processed; HC is all handling charges, export charges, pipeline tariff charges, processing charges and charges of a similar nature that are paid to transport the oil sands product so disposed of from the royalty calculation point for the product to the place where those dispositions occur, and to process the oil sands product at any place between those two places, and are not allowed costs of the Project or costs taken into account in determining prior net cumulative balance of the Project or of a Project expansion; TD is the total quantity of the oil sands product so disposed of.

(3) Despite subsection (2), if the Minister is of the opinion that the quantity of an oil sands product delivered at a royalty calculation point and disposed of in third party dispositions is insufficient to determine a reasonably accurate unit price pursuant to subsection (2), the unit price for the product shall be the price determined by the Minister as the fair market value of the product.

(4) Despite subsection (2), if the oil sands product for which a unit price is calculated is crude bitumen that is not cleaned crude bitumen (in this subsection called “dirty crude bitumen”), (

a) the fair market value of th e cleaned crude bitumen that is or could be obtained from the dirty crude bitumen shall be used for the purposes of the calculation of unit price rather than the consideration received or receivable from dispositions of the dirty crude bitumen, and (

b) the charges referred to in subsection (2) shall, for the purposes of the calculation of unit price, include charges of the kind described in that subsection that the Minister is of the opinion would have been incurred to transport the dirty crude bitumen from the place at which it is disposed of to the place at which it is or could be processed to produce cleaned crude bitumen, and to so process the dirty crude bitumen to produce cleaned crude bitumen.

(5) Charges referred to in subsection (2) or (4) shall not include any marketing costs or charges, brokerage fees or other like costs or charges.

Section 22 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 30 Other net proceeds 22(1) The “other net proceeds” of a Project for a Period are (

a) the aggregate of the amounts described in subsection (2), excluding (

b) any amounts described in subsection (3).

(2) The following are the amounts for the purposes of subsection (1)(a): (

a) any consideration received or receivable during the Period from the sale, lease, license or other disposition of any (

i) substances or assets of the Project, other than oil sands products, or (ii) technology of the Project, costs of which are allowed co sts or were costs taken into account in determining prior net cumulative balance of the Project; (

b) any proceeds received or r eceivable during the Period (

i) under a policy of insurance, to the extent of the proportion of the proceeds that is the same as the proportion of the corresponding insurance premiums that are allowed costs or were costs taken into account in determining prior net cumulative balance of the Project, or (ii) pursuant to a judgement o f a court, or in settlement of litigation or threatened litigation, in relation to the Project, other than a judgment or litigation or threatened litigation against the Crown in respect of amounts paid or payable under

section 90 of the Mines and Minerals Act or this Regulation in relation to the Project; (

c) any consideration received or receivable during the Period for transporting, or for granting the right to transport, by means of the transportation facilities of the Project, oil sands or oil sands products not owned by or on behalf of the Project owners; (c.1) any consideration receive d or receivable during the Period for

Section 22 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 31 (

i) processing, or granting the right to process, in a processing plant, the whole or a proportion of which is included in the facilities of the Project, oil sands or oil sands products not owned by or on behalf of the Project owners, or (ii) producing steam in a cogeneration plant, or a part of a cogeneration plant, the whole or a proportion of which is included in the facilities of the Project, that is not utilized for the purposes of the Project, to the extent that such processing or production utilizes any part of the capacity of the plant or of the part of the plant, as the case may be, that corresponds to the proportion of the plant or part, respectively, included in the facilities of the Project; (

d) the aggregate of the products obtained by multiplying (

i) each quantity of (

A) blended bitumen that contains crude bitumen recovered pursuant to the Project from substances that are not Project substances but that are owned by or on behalf of the Project owners, or (

B) each oil sands product, other than crude bitumen referred to in paragraph (A), recovered pursuant to the Project from substances that are not Project substances but that are owned by or on behalf of the Project owners, that is delivered during the Period at a royalty calculation point for the crude bitumen or other oil sands product, as the case may be, b y (ii) the unit price applicable to the quantity; (

e) the amount, if any, by w hich the other net proceeds determined for the Project pursuant to this

section for the preceding Period exceed the allowed costs of the Project for that preceding Period, if that preceding Period is a post-payout Period; (

f) an amount determined by the Minister as the fair market value attributable to the use of an asset of the Project during the Period, other than for the purposes of the Project;

Section 23 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 32 (

g) the net amount of any other proceeds and recoveries relating to the Project.

(3) The following are the amounts for the purposes of subsection (1)(b): (

a) any consideration received or receivable during the Period for a disposition of a participating interest, an overriding royalty interest, a carried interest, a net profit interest or any other like interest in the Project; (

b) Project revenue of th e Project for the Period; (c), (

d) repealed AR 52/2000 s7; (

e) the consideration received or receivable during the Period for the sale or other disposition of an asset of the Project from a Project owner to another Project owner. AR 185/97 s22;52/2000;251/2001 Division 2 Crown’s Royalty Share Royalty calculation point 23(1) If crude bitumen that is a Project substance is disposed of without being processed into other oil sands products, the royalty share of the crude bitumen shall be calculated at the last point of measurement before the crude bitumen is permanently removed from the surface areas occupied by the Project.

(2) If cleaned crude bitumen (

a) is obtained from oil sands or crude bitumen that is a Project substance without having first been disposed of and whether or not the processing plant at which it is obtained is part of the Project, and (

b) i s t h e n (

i) disposed of without being processed into one or more other oil sands products, (ii) delivered to a processing plant or other facility that is not part of the Project or into a transportation facility for delivery to a processing plant or other facility that is not part of the Project, or (iii) consumed or used, other than in the Project,

Section 24 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 33 the royalty share of the cleaned crude bitumen shall be calculated at the last point of measurement before it is delivered from the processing plant referred to in clause (a), at which it is obtained.

(3) If an oil sands product, other than crude bitumen or cleaned crude bitumen, (

a) is obtained at a processing plant that is part of the Project from crude bitumen, cleaned crude bitumen or another oil sands product that is a Project substance without having first been disposed of, and (

b) i s t h e n (

i) disposed of without being further processed into one or more other oil sands products at a processing plant that is part of the Project, (ii) delivered to a processing plant or other facility that is not part of the Project or into a transportation facility for delivery to a processing plant or other facility that is not part of the Project, or (iii) consumed or used, other than in the Project, the royalty share of the oil sands product shall be calculated at the last point of measurement before it is delivered from the processing plant referred to in clause (a).

Royalty free and clear 24 The royalty on oil sands products shall be free and clear of all deductions. Disposition of Crown’s royalty share 25 If any oil sands product that is subject to the payment of royalty to the Crown under this Regulation is sold or otherwise disposed of to another person, unless the Minister otherwise directs in a particular case, (

a) the Project owners, and any agent of the Project owners, who actually sells or otherwise disposes of the oil sands product must act as the agent of the Crown for the purpose of selling or otherwise disposing of the Crown’s royalty share of the oil sands product, and (

b) the Crown’s royalty share of the oil sands product must be included in the sale or other disposition.

Section 26 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 34 Limited agency 26 No person has any of the rights, privileges, prerogatives or immunities of the Crown by reason only of acting as an agent of the Crown under

section 25.

Part 4 Reporting and Payment Division 1 Reporting Operator’s forecast 27 The operator of a Project must, unless the Minister otherwise directs in a particular case, furnish to the Minister by December 15 of each calendar year prior to 2008 a report that contains the operator’s forecast of the information regarding the Project called for by the form of the report and relating to (

a) the Periods that occur during the calendar year and that may occur during the following 4 calendar years, and (

b) when the Project payout date of the Project is expected to occur. AR 185/97 s27;223/2008 Monthly report 28(1) The operator of a Project must, unless the Minister otherwise directs in a particular case, furnish a report to the Minister for each month of a Period ending on or before December 31, 2008, containing the information regarding the Project called for by the form of the report.

(2) A report under subsection (1) must be furnished by the last day of the month following the month for which the report is required.

(3) Despite subsections (1) and (2), a report under subsection (1) must, if the report is in respect of a month that precedes the month during which the Project is first approved under

section 16, be furnished by the last day of the month following the month during which the Project is so approved.

(4) A report required to be furnished under

section 27 or subsection (1) of this

section may call for the furnishing of actual information, estimated or forecasted information or any combination of actual and estimated or forecasted information. AR 185/97 s28;223/2008

Section 29 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 35 End of Period statement 29(1) The operator of a Project must, unless the Minister otherwise directs in a particular case, furnish to the Minister within 3 months after the end of each Period ending on or before December 31, 2008 a statement in respect of the Period containing the information called for by the form of the statement.

(2) A statement under subsection (1) (

a) must be signed by the operator of the Project or by the operator’s representative, and (

b) unless the Minister oth erwise directs, must, if the aggregate quantity of crude bitumen and cleaned crude bitumen recovered pursuant to the Project and delivered at a royalty calculation point during the Period, whether as part of blended bitumen or otherwise, is greater than the product of the number of days in the Period and 10,000 barrels per day, be accompanied by (

i) an opinion by the auditors retained by the operator, and (ii) if the Project is not a Qualifying Joint Venture Project, an opinion by the auditors retained by each Project owner to report to the shareholders of the Project owner, as to whether the operator, in the case of the opinion referred to in subclause (i), and the Project owner, in the case of the opinion referred to in subclause (ii), have complied with the requirements of this Regulation, and whether the information submitted in the statement is presented fairly in accordance with

section 11. AR 185/97 s29;223/2008 Records 30 The Project owners and the operator of a Project must keep and maintain, and cause those persons affiliated with them to keep and maintain, records satisfactory to the Minister relating to the Project or used to prepare any application, report, statement or opinion permitted or required to be submitted or furnished under this Regulation.

Section 31 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 36 Division 2 Payment Payment of royalty proceeds 31(1) The operator of a Project must, in respect of the Crown’s royalty share payable under

section 90(2) of the Mines and Minerals Act for each oil sands product that (

a) is recovered from the develo pment area of the Project, and (

b) is delivered at a royalty calculation point during a month of a pre-payout Period ending on or before December 31, 2008, pay to the Crown the proceeds of disposition for that royalty share on or before the last day of the month following the month in which it is disposed of, consumed or used.

(2) Subject to subsections (3) to (8), the operator of a Project must, in respect of the Crown’s royalty share payable under

section 90(3) of the Mines and Minerals Act for each oil sands product that (

a) is recovered from the develo pment area of the Project, and (

b) is delivered at a royalty calculation point during a post-payout Period ending on or before December 31, 2008, pay to the Crown the proceeds of disposition for that royalty share on or before the last day of the 4th month following the Period in which it is disposed of, consumed or used.

(3) The proceeds of disposition for the purposes of subsections (1) and (2) shall, subject to subsections (3.1) and (3.2), respectively, be calculated by (

a) multiplying the quantity of the Crown’s royalty share of the oil sands product so disposed of, consumed or used by the unit price applicable to the quantity (or, if the product is cleaned crude bitumen contained in blended bitumen, the unit price applicable to the blended bitumen), and (

b) if the oil sands product is cleaned crude bitumen that is contained in blended bitumen when so disposed of, consumed or used, deducting from the amount determined under clause (

a) the cost of diluent for the diluent included in the quantity.

(3.1) Repealed AR 52/2019 s4.

(3.2) Repealed AR 52/2019 s4.

Section 31 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 37

(4) The operator of a Project must pay to the Crown in respect of each month of a post-payout Period ending on or before December 31, 2008, as an instalment with respect to the aggregate of the proceeds required to be paid by the operator under subsection (2) for the Period as reduced under subsection (3.2), the amount calculated by subtracting from the greater of 1% of the gross revenue of the Project for the portion of the Period ending with the month and the amount calculated in respect of the Project for the month in accordance with subsection (4.1), (

a) the aggregate of the amounts paid by the operator under this subsection in respect of the preceding months of the Period and not repaid under subsection (7), and (

b) the amount, if any, remaining after subtracting the aggregate amount referred to in clause (a).

(4.1) The amount referred to in subsection (4) to be calculated in accordance with this subsection for the Project for a month of a post-payout Period shall be calculated in accordance with the following formula: P= .25ENR x GR EGR w h e r e P is the amount to be paid under subsection (4) in respect of the month, prior to subtracting the amounts referred to in subsection (4)(

a) and (

b) in respect of the month; ENR is the amount estimated in the report furnished under

section 28(1) by the operator for the month as the net revenue of the Project for the Period; EGR is the amount estimated in the report furnished under

section 28(1) by the operator for the month as the gross revenue of the Project for the Period; GR is the gross revenue of the Project for the portion of the Period ending with the month.

(5) An amount required to be paid by the operator of a Project to the Crown under subsection (4) in respect of a month of a Period must be paid by the last day of the following month.

(6) If the amount required to be paid by the operator under subsection (4) in respect of a month of a Period is a negative

Section 32 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 38 amount, the amount must, subject to subsection (7), be deducted by the operator from the amounts required to be paid by the operator under subsection (4) in respect of the next ensuing month or months of the Period until the amount is fully deducted.

(7) If the amount required to be deducted under subsection (6) is, in the Minister’s opinion, likely to exceed the amounts payable by the operator under subsection (4) in the remaining months of the Period, the amount must be paid by the Minister to the operator by the last day of the month following the month in which the report provided under

section 28(1) first identifies the amount.

(8) If the aggregate of the proceeds payable to the Crown under subsection (2) in respect of the royalty share disposed of during a Period as indicated in a statement furnished under

section 29(1) exceeds the proceeds paid to the Crown under subsection (4) that have not been repaid under subsection (7) in respect of the months of the Period, the operator must pay the excess amount to the Crown by the last day of the 4th month following the end of the Period.

(9) If the aggregate of the proceeds payable to the Crown under subsection (2) in respect of the royalty share disposed of during a Period as indicated in a statement furnished under

section 29(1) is less than the proceeds paid to the Crown under subsection (4) that have not been repaid under subsection (7) in respect of the months of the Period, the Minister must pay the deficiency to the operator by the last day of the 4th month following the end of the Period.

(10) A reference in this

section to “the last day of the month” means, in respect of the month of March, the last day of March on which the offices of the Department are open. AR 185/97 s31;251/2001;250/2004;47/2007;223/2008;52/2019 Division 3 Penalties and Interest Penalties 32(1) If an operator of a Project is required to furnish to the Minister any of the following and fails to do so by the respective dates required by this Regulation, the Minister may by notice impose on the operator a penalty of $1000 for each month or part of a month during which the failure continues: (

a) a report required to be furnished under

section 27 or 28; (

b) a statement required to be furnished under

section 29(1); (

c) an auditors’ opinion required to be furnished under

section 29(2)(b).

Section 32 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 39

(2) The Minister may waive a penalty imposed under subsection (1), on being satisfied that the failure to furnish the report, statement or opinion by the deadline was due to circumstances beyond the control of the operator required to furnish it.

(3) Where, as a result of an audit or examination conducted by or on behalf of the Minister under the Act, the Minister determines that the proceeds of royalty actually payable to the Crown in respect of a Period ending on or before December 31, 2008 on oil sands products recovered from the development area of a Project are greater than the aggregate proceeds paid to the Crown in respect of such royalty, the Minister may give a notice to the operator describing the deficiency and what, in the Minister’s opinion, was the cause giving rise to the deficiency.

(4) If the Minister gives a notice under subsection (3) to an operator in respect of a Period, and (

a) has previously given another notice to the operator under subsection (3) in respect of a deficiency for not more than one earlier Period where the cause giving rise to the whole or a part of the deficiency for the earlier Period is, in the Minister’s opinion, the same as or similar to the cause giving rise to the whole or a part of the deficiency for the Period first referred to in this subsection, or (

b) has previously given notices to the operator under subsection (3) for more than one earlier Period in respect of the deficiencies for those earlier Periods where the cause giving rise to the whole or a part of the deficiencies for those earlier Periods is, in the Minister’s opinion, the same as or similar to the cause giving rise to the whole or a part of the deficiency for the Period first referred to in this subsection, the Minister may impose on the operator a penalty in an amount not exceeding (c) 10%, in a case where clause (

a) applies, or (d) 50%, in a case where clause (

b) applies, of the whole or that part, as the case may be, of the deficiency for the Period first referred to in this subsection that the Minister considers attributable to that cause.

(5) The Minister may waive the whole or a part of a penalty imposed under subsection (4) if the Minister is of the opinion that the circumstances warrant such a waiver.

Section 33 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 40

(6) No penalty may be imposed under subsection (4) if the amount of the penalty is less than $1000.

(7) A penalty imposed by the Minister under subsection (1) or (4) must be paid within 30 days after the Minister gives the operator notice of imposition of the penalty. AR 185/97 s32;223/2008 Interest 33(1) If any of the following amounts are not paid by an operator of a Project by the date required by this Regulation, interest is payable by the operator to the Crown in accordance with this

section on the amount, computed from the day following the due date until the day the amount is paid to the Crown: (

a) an amount required to be paid by the operator under

section 31(1) or (4), 38.1(3) or 38.2(2) or (7) in respect of the Project; (

b) a penalty required to be pa id by the operator under

section 32 in respect of the Project; (

c) any interest required to be paid under this

section by the operator in respect of the Project.

(2) Interest is payable by the operator of a Project to the Crown in accordance with this

section on any of the following amounts required to be paid in respect of the Project, computed from the day following the last day of the 4th month following the Period in respect of which the amount is required to be paid until the amount is paid to the Crown: (

a) an amount required to be paid by the operator under

section 31(2) or (8) in respect of the Project; (

b) the amount of a deficiency referred to in

section 32(3) in respect of the Project; (

c) the amount of any underpayment of proceeds of royalty payable in respect of a Period ending on or before December 31, 2008 to the Crown in respect of oil sands products recovered from the development area of the Project, other than an amount described in clause (

a) or (b), where the underpayment is identified in a recalculation by the Minister under the Mines and Minerals Act.

(3) Interest payable under this

section by the operator of a Project to the Crown in relation to any amount must be paid by the last day

Section 33 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 41 of the month following the month in which the due date prescribed in this Regulation for payment of the amount occurs.

(4) Interest is payable by the Crown to the operator of a Project in accordance with this

section on (

a) an amount required to be paid by the Crown to the operator under

section 31(7) in respect of the Project, computed from the day following the last day of the Period in respect of which the amount is required to be paid, and (

b) the amount of (

i) any deficiency payable under

section 31(9), or (ii) any overpayment of proceeds of royalty payable in respect of a Period ending on or before December 31, 2008 by the operator to the Crown in respect of oil sands products recovered from the development area of the Project, other than an amount described in subclause (

i) or clause (a), where the overpayment is identified in a recalculation by the Minister under the Mines and Minerals Act, computed from the day following the last day of the 4th month following the Period in respect of which the deficiency is payable or overpayment has been paid, respectively, until the date the Minister requisitions a cheque for the amount or notifies the operator to deduct the amount from an amount required to be paid by the operator under this Regulation.

(5) For the purposes of this section, (

a) interest payable to or by the Crown on any amount is payable, subject to subsection (1)(c), on a simple interest basis on the balance of that amount remaining unpaid from time to time until the date on which the entire balance of the unpaid amount is received by the Minister or dealt with by the Minister in accordance with subsection (4), respectively, and (

b) if interest is payable under this

section by or to the Cro wn in respect of any day, the rate of interest in respect of that day is the yearly rate that is 1% greater than the rate of interest established by the Province of Alberta Treasury Branches as its prime lending rate on loans payable in Canadian dollars and in effect on the first day of the month in which that day occurs.

Section 34 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 42

(6) Repealed AR 262/97 s36. AR 185/97 s33;262/97;223/2008 Division 4 Application of Payments Application of payments 34 Unless the Minister directs otherwise, if money is paid to the Crown by the operator of a Project on or before December 31, 2008, the money must be applied in the following order: (

a) first, on penalties owing by the operator under this Regulation; (b) 2nd, on interest owing by the operator under this Regulation; (c) 3rd, on proceeds of royalty owing by the operator under this Regulation. AR 185.97 s34;223/2008

Part 5 Disputes Referral of disputes 35 If (

a) the Minister specifies ter ms and conditions under which the Minister will, pursuant to

section 7 of the Government Organization Act, establish a committee or board to hear a dispute between the Minister and the Project owners or operator of a Project with respect to a matter under this Regulation, and (

b) the operator of a Project makes a written request, in accordance with those terms and conditions, to refer a dispute to such a committee or board that is of a kind permitted by the terms and conditions to be so referred, the Minister shall not make a decision with respect to the matter in dispute until the Minister has established the committee or board, the matter has been referred to the committee or board and its recommendations have been received and considered by the Minister.

Section 36 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 43

Part 6 Transitional Provisions Long term Crown Agreements 36(1) In this section, (a) “Alberta Crow n Agreement” means the Alberta Crown Agreement, as amended from time to time, referred to in Order in Council numbered O.C. 469/76; (b) “Allowed Cumulative Project Costs”, “Allowed Cumulative Project Cost”, “Cumulative Deemed Gross Revenue”, “Cumulative Return Allowance” and “Date of Project Payout” have, in respect of a Project that was subject to a long term Crown Agreement on the day preceding the effective date of the Project, the same meaning as in the long term Crown Agreement; (c) “long term Crown Agreem ent” means a contract under

section 9 of the Mines and Minerals Act designated by the Minister as a long term Crown Agreement for the purposes of this section; (d) “return allowance rate” mean s in respect of any period of time, the return allowance rate determined in accordance with

section 90(7) and (8) of the Mines and Minerals Act in relation to that period of time.

(2) If any of the following Projects are approved under

section 16 or deemed in a contract under

section 9 of the Act to have been approved for the purposes of this Regulation, the effective date of the Project is, despite

section 1(dd), deemed to be the Project payout date for the Project: (

a) a Project that comprises or includes a project that was subject to a long term Crown Agreement up to the day preceding the effective date of the Project and had a Date of Project Payout that occurred before that effective date; (

b) a Project that comprise s or includes the “Oil Sands Project”, as defined in the Alberta Suncor (O.S.G.) Crown Agreement, as amended from time to time, referred to in Order in Council numbered O.C. 155/88; (

c) a Project that comprises or includes the Syncrude Project within the meaning of the Alberta Crown Agreement.

(3) If an excess amount referred to in

section 301(3) of a long term Crown Agreement arises in respect of a project for the last Period, as defined in the Agreement, preceding the effective date of a Project that comprises or includes that project, the aggregate of

Section 37 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 44 (

a) the excess amount, and (

b) the amount determined by multiplying the return allowance rate for that Period by (

i) the product of 183/365 and the excess amount, if an excess amount referred to in

section 301(3) of the Agreement did not also arise in respect of the project for the preceding Period, as defined in the Agreement, or (ii) the excess amount, if an excess amount referred to in

section 301(3) of Agreement also arose in respect of the project for the preceding Period, as defined in the Agreement, is an allowed cost of the Project for the Period that commences on the effective date of the Project.

(4) Repealed AR 223/2008 s53. AR 185/97 s36;251/2001;223/2008 Amalgamated Project 37(1) In this

section and in

section 4(

f) of Schedules 1 and 2, (a) “amalgamated Project” mean s the Project that arises from the amalgamation of 2 or more Projects pursuant to an amendment approved under

section 16(1); (b) “amendment Period” means the Period of a Project during which the effective date of an amendment to the Project occurs that amalgamates it with one or more other Projects to form an amalgamated Project; (c) “first amalgamated Peri od” means in respect of an amalgamated Project that arises from the amalgamation of 2 or more Projects pursuant to an amendment approved under

section 16(1), the period of time that commences on the earliest day that an amendment Period of those Projects commences, and that ends on the earlier of (

i) the last day of the calendar year during which the effective date of the amendment occurs, and (ii) the date on which the appr oval under

section 16(1) in respect of the amalgamated Project is revoked.

(2) If, as of the day preceding the effective date of an amendment approved under

section 16(1) that amalgamates 2 or more Projects,

Section 38 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 45 the Project payout date has occurred for at least one of the Projects being amalgamated, (

a) the amalgamated Project i s deemed to be a Project for which the Project payout date has occurred, and (

b) the net revenue and net los s of the amalgamated Project for its first amalgamated Period shall be determined on the basis of (

i) the aggregate allowed co sts, the aggregate Project revenues and the aggregate other net proceeds, of the Projects being amalgamated, for the portions of their respective amendment Periods that precede the effective date of the amendment, and (ii) the allowed costs, Project revenue and other net proceeds of the amalgamated Project for the portion of the first amalgamated Period of the Project that commences on the effective date of the amendment.

(3) If, as of the day preceding the effective date of an amendment approved under

section 16(1) that amalgamates 2 or more Projects, the Project payout date has not occurred for any of the Projects, (

a) the amalgamated Project is deemed as of the effective date to be a Project for which the Project payout date has not occurred, and (

b) the aggregate of the cumula tive costs of the Projects as of the day preceding the effective date of the amendment and the aggregate of the cumulative revenues of the Projects as of the same day shall, for the purpose of determining the Project payout date of the amalgamated Project, be the cumulative cost and cumulative revenue, respectively, of the amalgamated Project as of the commencement of the effective date of the amendment. Previously paid royalty 38(1) If a Project is approved under

section 16, any proceeds of royalty in respect of oil sands and oil sands products recovered from the development area of the Project paid to the Crown, other than pursuant to this Regulation, for each month during the period, if any, commencing with the effective date of the Project and ending with the last day of the month in which the Project is approved under

section 16, shall for the purposes of this Regulation be considered

Section 38.1 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 46 (

a) an amount paid in respect of that month pursuant to

section 31(1), if the month is part of a pre-payout Period, or (

b) an amount paid in respect of that month pursuant to

section 31(4), if the month is part of a post-payout Period.

(2) If a Project, as defined in the Oil Sands Royalty Regulation, 2009, is approved under

section 11(1) of that regulation, any proceeds of royalty in respect of oil sands and oil sands products recovered from the development area of the Project paid to the Crown, other than pursuant to this Regulation, for each month during the period, if any, commencing with the effective date of the Project and ending on December 31, 2008 shall, for the purposes of this Regulation, be considered (

a) an amount paid in respect of that month pursuant to

section 31(1), if the month is part of a pre-payout Period, or (

b) an amount paid in respect of that month pursuant to

section 31(4), if the month is part of a post-payout Period. AR 185/97 s38;223/2008 Pre-2009 inventory 38.1(1) For the purposes of this Regulation, an oil sands product, (

a) that is obtained pursuant to a Project and delivered at a royalty calculation point for the product before January 1, 2009, and (

b) that is not disposed of, consumed or used before that date , is, along with the Crown’s royalty share of the oil sands product, deemed to be disposed of during December of 2008.

(2) Despite

section 21, the unit price applicable to the quantity of an oil sands product referred to in subsection (1) is the simple average of the unit prices that (

a) would be determined under

section 32 of the Oil Sands Royalty Regulation, 2009 for the months of 2009, and (

b) would apply to an oil sands product of that kind obtained pursuant to the Project and delivered at a royalty calculation point under that Regulation for the product during those months, if those months were part of a pre-payout Period of the Project.

Section 38.2 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 47

(3) Despite

section 31, the proceeds of disposition of the Crown’s royalty share of an oil sands product referred to in subsection (1) shall be paid to the Crown by April 30, 2010 by the operator of the Project pursuant to which the oil sands product is recovered. AR 223/2008 s53 Pre-2009 transitional inventory 38.2(1) In this section, “transitional crude bitumen” means crude bitumen that is (

a) described in secti on 1(2)(

b) or (

c) of the Oil Sands Royalty Regulation, 2009, (

b) a Project substance, and (

c) obtained before January 1, 2009 pursuant to a Project referred to in

section 36(2)(

b) or (c), in respect of which royalty is not reserved under

section 90 of the Act, as that

section stood on October 1, 2008, on the crude bitumen or on oil sands products obtained from the crude bitumen.

(2) Despite

section 31, if on or before December 31, 2008, an oil sands product other than transitional crude bitumen is (

a) obtained pursuant to a Project referred to in

section 36(2)(

b) or (c), (

b) delivered at a royalty cal culation point for the oil sands product, and (

c) is not disposed of, consumed or used on or before that date, the operator of the Project shall pay the Crown the proceeds of the Crown’s royalty share of the oil sands product by April 30, 2010.

(3) Subject to subsections (4) and (5), the proceeds of the Crown’s royalty share of an oil sands product referred to in subsection (2) shall, despite

section 21 and 31, be calculated by multiplying the quantity of the Crown’s royalty share by the price calculated in accordance with the following formula: (C - T) ÷ Q where C is the total consideratio n, calculated in accordance with the Minister’s directions, received or receivable by the seller under all third party dispositions, as

Section 38.2 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 48 defined in

section 21(1)(b), during 2009, of that kind of oil sands product obtained pursuant to the Project; T is all handling charges, export charges, pipeline tariff charges and charges of a similar nature that are paid to transport the oil sands product disposed of in the dispositions referred to in the definition of C from the royalty calculation point for the oil sands product to the place where those dispositions occur; Q is the total quantity of the oil sands product disposed of in the dispositions referred to in the definition of C.

(4) If the oil sands product referred to in subsection (3) is cleaned crude bitumen contained in blended bitumen, the price for the purposes of that subsection shall be calculated in accordance with the formula set out in that subsection, except that (a) “C” is the total consider ation, calculated in accordance with the Minister’s directions, received or receivable by the seller under all third party dispositions, as defined in

section 21(1)(b), during 2009, of blended bitumen containing cleaned crude bitumen obtained pursuant to the Project, (b) “T” is all handling charges , export charges, pipeline tariff charges and charges of a similar nature that are paid to transport the blended bitumen disposed of in the dispositions referred to in clause (

a) from the royalty calculation point for the cleaned crude bitumen contained in the blended bitumen to the place where those dispositions occur, and includes the cost of diluent contained in that blended bitumen, and (c) “Q” is the quantity of cleane d crude bitumen contained in the blended bitumen disposed of in the dispositions referred to in clause (a).

(5) If the Minister is of the opinion that the quantity of an oil sands product disposed of in third party dispositions referred to in subsection (3) or (4) is insufficient to determine a reasonably accurate price for the purposes of subsection (3), the price used for the purposes of subsection (3) shall be the price determined by the Minister as the fair market value of the product.

(6) The royalty reserved to the Crown on transitional crude bitumen is the same percentage of the quantity of the transitional crude bitumen as the percentage of the royalty reserved under

section 90(3) of the Act, as that

section stood on October 1, 2008,

Section 39 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 49 on other oil sands products obtained pursuant to the Project during the 2008 Period.

(7) The proceeds payable to the Crown for the Crown’s royalty share of transitional crude bitumen is the product of the quantity of the Crown’s royalty share and the simple average of the unit prices that (

a) would be determined under

section 32 of the Oil Sands Royalty Regulation, 2009 for the months of 2009, and (

b) would apply to crude bitumen described in

section 1(2)(

b) or (

c) of the Oil Sands Royalty Regulation, 2009 obtained pursuant to the Project and delivered at a royalty calculation point under that Regulation for the product during those months, if those months were part of a pre-payout Period of the Project.

(8) The proceeds referred to in subsection (7) shall be paid to the Crown by April 30, 2010. AR 223/2008 s53;334/2009

Part 7 Consequential Amendments, Expiry and Coming into Force Consequential Amendments Consequential 39 The Experimental Oil Sands Royalty Regulation (AR 347/92) is amended by repealing

section 1(1)(

b) and substituting the following: (b) “experimental project” mean s a scheme or operation that (

i) is the subject of a subsisting approval given by the Board under the Oil Sands Conservation Act before August 1, 1997, and (ii) is described in that approval as an experimental scheme for the recovery of oil sands or crude bitumen. Expiry Expiry 40 This Regulation expires on June 30, 2035. AR 185/97 s40;95/2007;223/2008;81/2014;246/2018

Section 41 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 50 Coming into Force Coming into force 41 This Regulation is deemed to have come into force on July 1, 1997.

Schedule 1 Allowed Costs of Non-qualifying Joint Venture Projects 1 This

Schedule applies to Projects that are not Qualifying Joint Venture Projects. 2 Subject to the other sections of this Schedule, a cost is an allowed cost of a Project only to the extent that (

a) it is directly attributable to the Project, (

b) it is reasonable in relati on to the circumstances under which it is incurred, (

c) it is incurred by or on behalf of the Project owners of th e Project, (

d) it is incurred on or after the effective date of the Project and on or before December 31, 2008, and (

e) it is incurred to (

i) recover oil sands from the development area of the Project, (ii) purchase oil sands products for processing or reprocessing in one or more processing plants that are part of the Project, (iii) process or reprocess oil sa nds or oil sands products in one or more processing plants that are part of the Project, (iv) process (

A) oil sands or oil sand s products recovered from the development area of the Project, or (

B) oil sands products purchased and previously processed in one or more processing plants that are part of the Project,

Schedule 1 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 51 in one or more processing plants that are not part of the Project, before the oil sands products obtained as a result of such processing are delivered at a royalty calculation point, (

v) transport oil sands and oil sands products from one part of the Project to another, (vi) transport oil sands and o il sands products described in subclause (iv)(

A) or (

B) from the Project to the processing plant or plants referred to in subclause (iv) that are not part of the Project, (vii) market an oil sands prod uct obtained pursuant to the Project, (viii) conduct planning, designing and engineering in relation to expansions of the Project, (ix) conduct research that is directly attributable to the Project, other than basic research referred to in

section 3(

g) of this Schedule, or (

x) provide field, office, adm inistrative or other services in relation to the activities described in subclauses (

i) to (vi) and (ix). 3 A cost is not an allowed cost of a Project (

a) if it is in respect of overhead or an administrative expen se, including internal audit, “in-house” legal and other like expenses, of the operator, a Project owner or an affiliate of either, and is not allowed under

section 2(e)(

x) of this Schedule, (

b) if it is on account of, in lieu of or in satisfaction of interest or any other borrowing or financing cost or any penalty or charge for late or deficient payment, (

c) if it is in respect of an overriding royalty interest, a c arried interest, a net profit interest or any similar interest, other than an Overriding Royalty described in

section 101(

n) of

Schedule 3 to the Metis Settlements Act, (c.1) if it is an escalating rental paid under the Oil Sands Tenure Regulation, (

d) if it is incurred to acquire an interest or estate in mine ral rights, except to the extent such cost is incurred to perform work on or in respect of the mineral rights included in the Project or to create wells, facilities, roads,

Schedule 1 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 52 pipelines or other assets or infrastructure that are part of the Project in order to earn the interest or estate, (

e) if it is in respect of d epletion or depreciation, (

f) if it results from

an act o r omission that is a breach of any applicable laws, rules or regulations of a government or government agency, (

g) if it is incurred to conduct basic research, (

h) if it is a fee or expense of dispute resolution, including a referral under

section 35 of this Regulation, of arbitration or of litigation, of any dispute with the Crown in connection with any matter relating to royalty, proceeds of royalty, interest or any penalty payable or paid to the Crown in relation to the Project, (

i) to the extent it would no t be allowed as a deduction in computing income under the Income Tax Act (Canada), if it is in respect of the human consumption of food or beverages or the enjoyment of entertainment, or (

j) to the extent that (

i) any credits or discounts that are intended to reduce or offset a cost described in

section 2 of this

Schedule are actually received by the operator, a Project owner or an affiliate of either of them, (ii) any economic assistan ce (other than economic assistance in the form of a reduction in income tax payable) that is intended to reduce or offset costs described in

section 2 of this

Schedule is provided by the Province of Alberta or the Government of Canada, or an agency of either, to the operator, a Project owner or an affiliate of either of them, (iii) it is an allowed cost in respect of another project, or (iv) it is a cost deducted in the determination of unit price under this Regulation or in the determination of unit price under

section 32 of the Oil Sands Royalty Regulation, 2009. (

k) repealed AR 52/2000 s8. 4 Despite sections 2 and 3 of this

Schedule but subject to

section 5 of this

Schedule and

section 16 of the Oil Sands Allowed Costs (Ministerial) Regulation,

Schedule 1 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 53 (

a) the net loss of a Project for a post-payout Period is an allowed cost of the Project for the next post-payout Period, (

b) any royalty paid under

section 90(3)(

a) of the Mines and Minerals Act in respect of a Project for a post-payout Period is, to the extent it exceeds the royalty calculated under

section 90(3)(

b) of the Act in respect of the Project for the same Period, an allowed cost of the Project for the next post-payout Period, (

c) the product of (

i) the excess, if any, of (

A) the cumulative cost of a Project as of the last day of a month of a pre-payout Period of the Project, over (

B) the cumulative revenue of the Project as of the same day, t i m e s (ii) the return allowance rate for the month, is an allowed cost of the Pr oject for the following month, (

d) the amount determined by multiplying the return allowance rate of a Project for a post-payout Period by (

i) the product of 183/365 and the net loss, if any, of the Project for the Period, if a net loss did not also arise in respect of the Project for the preceding post-payout Period, (ii) the net loss, if any, of the Project for the Period, if a net loss also arose in respect of the Project for the preceding post-payout Period, or (iii) the portion specified by t he Minister of the net loss, if any, of the Project for the Period, in any other case, is an allowed cost of the Project for the next post-payout Period, (

e) the prior net cumulative ba lance of a Project expansion is, to the extent it is a positive amount, an allowed cost of the Project to which the expansion relates, for the Period in

Schedule 2 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 54 which the effective date of the Project expansion occurs, if that Period is a post-payout Period, and (

f) if an amendment is approved under

section 16(1) of this Regulation that provides for the amalgamation of (

i) a Project for which the Project payout date has not occurred as of the day preceding the effective date of the amendment, and (ii) one or more other Project s for at least one of which the Project payout date has occurred as of that preceding day, the excess of the cumulative co st of the Project referred to in subclause (

i) as of the last day preceding the amendment Period of the Project over the cumulative revenue of the Project as of that last day is an allowed cost of the amalgamated Project for the first amalgamated Period of the amalgamated Project, and for the purposes of clauses (

c) and (f), the cumulative cost and cumulative revenue shall, despite

section 1(

h) and (

i) and

section 18(1) of this Regulation, be determined without reducing any amount included therein to the Crown’s share of that amount. 5 The products referred to in

section 4(

c) and (

d) of this

Schedule in respect of any month of a pre-payout Period or in respect of a post-payout Period, as the case may be, are not an allowed cost of a Project if the Minister has notified the operator of the Project that the Minister is of the opinion that operations in respect of the Project have been or are substantially suspended or abandoned for a period of time and the month or post-payout Period, respectively, falls within that period. AR 185/97 Sched.1;50/2000;52/2000;251/2001;250/2004;223/2008;52/2019

Schedule 2 Allowed Costs of Qualifying Joint Venture Projects 1 This

Schedule applies to Projects that are Qualifying Joint Venture Projects. 2 Subject to the other sections of this Schedule, a cost is an allowed cost of a Project only to the extent that (

a) it is directly attributable to the Project,

Schedule 2 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 55 (

b) it is reasonable in relati on to the circumstances under which it is incurred, (

c) it is incurred by or on behalf of the Project owners of th e Project, (

d) it is incurred on or after the effective date of the Project and on or before December 31, 2008, and (

e) it is incurred to (

i) recover oil sands from the development area of the Project, (ii) purchase oil sands products for processing or reprocessing in one or more processing plants that are part of the Project, (iii) process or reprocess oil sa nds or oil sands products in one or more processing plants that are part of the Project, (iv) process (

A) oil sands or oil sand s products recovered from the development area of the Project, or (

B) oil sands products purchased and previously processed in one or more processing plants that are part of the Project, in one or more processing plants that are not part of the Project, before the oil sands products obtained as a result of such processing are delivered at a royalty calculation point, (

v) transport oil sands and oil sands products from one part of the Project to another, (vi) transport oil sands and o il sands products described in subparagraph (iv)(

A) or (

B) from the Project to the processing plant or plants referred to in subparagraph (iv) that are not part of the Project, (vii) market an oil sands prod uct obtained pursuant to the Project, (viii) conduct planning, designing and engineering in relation to expansions of the Project, (ix) conduct research that is directly attributable to the Project, or

Schedule 2 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 56 (

x) provide field, office, adm inistrative or other services in relation to the activities described in subclauses (

i) to (ix). 3 A cost is not an allowed cost of a Project (

a) if it is in respect of manag ement fees that are charged by a Project owner or affiliate of a Project owner and which are not costs of services or materials, (

b) if it is on account of, in lieu of or in satisfaction of interest or any other borrowing or financing cost or any penalty or charge for late or deficient payment, (

c) if it is in respect of an overriding royalty interest, a c arried interest, a net profit interest or any similar interest, other than an Overriding Royalty described in

section 101(

n) of

Schedule 3 to the Metis Settlements Act, (c.1) if it is an escalating rental paid under the Oil Sands Tenure Regulation, (

d) if it is incurred to acquire an interest or estate in mine ral rights, except to the extent such cost is incurred to perform work on or in respect of the mineral rights included in the Project or to create wells, facilities, roads, pipelines or other assets or infrastructure that are part of the Project in order to earn the interest or estate, (

e) if it is in respect of d epletion or depreciation, (

f) if it results from

an act o r omission that is a breach of any applicable laws, rules or regulations of a government or government agency, (

g) if it is incurred in relati on to the marketing of an oil sands product by a person other than the operator of the Project, (

h) if it is a fee or expense of dispute resolution, including a referral under

section 35 of this Regulation, of arbitration or of litigation, of any dispute with the Crown in connection with any matter relating to royalty, proceeds of royalty, interest or any penalty payable or paid to the Crown in relation to the Project, (

i) to the extent it would no t be allowed as a deduction in computing income under the Income Tax Act (Canada) if it is in respect of the human consumption of food or beverages or the enjoyment of entertainment, or (

j) to the extent that

Schedule 2 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 57 (

i) any credits or discounts that are intended to reduce or offset a cost described in

section 2 of this

Schedule are actually received by the operator, a Project owner or an affiliate of either of them, (ii) any economic assistan ce (other than economic assistance in the form of a reduction in income tax payable) that is intended to reduce or offset costs described in

section 2 of this

Schedule is provided by the Province of Alberta or the Government of Canada, or an agency of either, to the operator, a Project owner or an affiliate of either of them, (iii) it is an allowed cost in respect of another Project, or (iv) it is a cost deducted in the determination of unit price under this Regulation or in the determination of unit price under

section 32 of the Oil Sands Royalty Regulation, 2009. (

k) repealed AR 52/2000 s9. 4 Despite sections 2 and 3 of this

Schedule but subject to

section 5 of this

Schedule and

section 16 of the Oil Sands Allowed Costs (Ministerial) Regulation, (

a) the net loss of a Project for a post-payout Period is an allowed cost of the Project for the next post-payout Period, (

b) any royalty paid under

section 90(3)(

a) of the Mines and Minerals Act in respect of a Project for a post-payout Period is, to the extent it exceeds the royalty calculated under

section 90(3)(

b) of the Act in respect of the Project for the same Period, an allowed cost of the Project for the next post-payout Period, (

c) the product of (

i) the excess, if any, of (

A) the cumulative cost of a Project as of the last day of a month of a pre-payout Period of the Project, over (

B) the cumulative revenue of the Project as of the same day, t i m e s

Schedule 2 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 58 (ii) the return allowance rate for the month, is an allowed cost of the Pr oject for the following month, (

d) the amount determined by multiplying the return allowance rate of a Project for a post-payout Period by (

i) the product of 183/365 and the net loss, if any, of the Project for the Period, if a net loss did not also arise in respect of the Project for the preceding post-payout Period, (ii) the net loss, if any, of the Project for the Period, if a net loss also arose in respect of the Project for the preceding post-payout Period, or (iii) the portion specified by t he Minister of the net loss, if any, of the Project for the Period, in any other case, is an allowed cost of the Project for the next post-payout Period, (

e) the prior net cumulative ba lance of a Project expansion is, to the extent it is a positive amount, an allowed cost of the Project to which the expansion relates, for the period in which the effective date of the Project expansion occurs, if that Period is a post-payout Period, and (

f) if an amendment is approved under

section 16(1) of this Regulation that provides for the amalgamation of (

i) a Project for which the Project payout date has not occurred as of the day preceding the effective date of the amendment, and (ii) one or more other Project s for at least one of which the Project payout date has occurred as of that preceding day, the excess of the cumulative co st of the Project referred to in subclause (

i) as of the last day preceding the amendment Period of the Project over the cumulative revenue of the Project as of that last day is an allowed cost of the amalgamated Project for the first amalgamated Period of the amalgamated Project, and for the purposes of clauses (

c) and (f), cumulative cost and cumulative revenue shall, despite

section 1(

h) and (

i) and

section 18(1) of this Regulation, be determined without reducing any amount included therein to the Crown’s share of that amount.

Schedule 2 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 59 5 The products referred to in

section 4(

c) and (

d) of this

Schedule in respect of any month of a pre-payout Period or in respect of a post-payout Period, as the case may be, are not an allowed cost of a Project if the Minister has notified the operator of the Project that the Minister is of the opinion that operations in respect of the Project have been or are substantially suspended or abandoned for a period of time and the month or post-payout Period, respectively, falls within that period. Table The following is an illustrative but not exhaustive list of the kinds of costs that would, to the extent they fall within

section 2 of Schedules 1 or 2 and are not excluded from allowed costs under

section 3 of those Schedules, as the case may be, be allowed costs of a Project: (

a) costs to acquire, construct or replace property plant and equipment for the purposes set out in

section 2(

e) of each Schedule, including (

i) laid down cost of equipment, materials and supplies before installation or assembly, (ii) direct and allocated costs of constructing, installing, assembling or erecting plant and equipment, including the costs of direct labour, benefits and an allocation of plant overhead costs, and NOTE: plant overhead costs allocated to property, plant and equipment are those costs directly related to constructing, installing, assembling or erecting plant and equipment that cannot be conveniently identified with a specific plant, and do not include any allocation of administrative and other costs that cannot be conveniently identified with constructing, installing, assembling or erecting plant and equipment. (iii) costs for wor k performed by other companies or individuals; (

b) cost of deposits acceptable to the Crown in amounts sufficient to ensure to the satisfaction of the Crown proper reclamation of the lands involved in the Project; (

c) costs of labour, services a nd supplies necessary for the operation of the Project, which labour, services and supplies may be obtained from the Project Owners and their affiliates, to the extent those costs are competitive in

Schedule 2 AR 185/97 OIL SANDS ROYALTY REGULATION, 1997 60 accordance with any applicable industry or professional fee structures; (

d) costs of utilities services, including costs of utility se rvice agreements and all other amounts billed by those providing such services; (

e) costs of repairs and mainte nance including but not limited to direct labour, including benefits, materials and supplies and work performed by other companies or individuals. AR 185/97 Sched.2;50/2000;52/2000;251/2001;250/2004;223/2008; 52/2019

Printed on Recycled Paper *9780779810680*

Document details

CollectionAlberta — Regulations
CitationAlta. Reg. 185/1997