Electric Power Terms and Conditions of Supply Regulation
MB Reg. 186/1990
Manitoba — Regulations
id="content">
This is an unofficial version . If you need an official copy, use the PDF version .
As of July 8, 2026, this is the most current version available.
This is the first version. It has been in effect since August 21, 1990.
Note : Earlier consolidated versions are not available online.
Search in this regulation
Show provisions with hits.
Find:
Submit
Clear
any word
all the words
exact phrase
This search is not case sensitive.
The Manitoba Hydro Act , C.C.S.M. c. H190
Loi sur l'Hydro-Manitoba , c. H190 de la C.P.L.M.
NOTE : Ce règlement a été adopté en anglais seulement.
version anglaise
Regulation 186/90
Registered August 21, 1990
Definition
1 In this regulation, "power" means electric power and electric energy.
Grant of right-of-way and passage
3 The user will grant to, or obtain for, Manitoba Hydro a free and uninterrupted right-of-way and passage in, over, under, and upon the land upon which the user's premises are situated, for the purposes of constructing, installing, maintaining, using, and removing the wires, facilities, and equipment required to supply power to the user, or to any other user supplied by Manitoba Hydro.
Point of delivery
4 The point of delivery for power is a point which Manitoba Hydro shall designate.
Connecting wires etc.
5 The user will provide all wires, facilities and equipment required to connect the user's premises to Manitoba Hydro's electrical distribution system at the point of delivery, and shall maintain those wires, facilities, and equipment in a condition that Manitoba Hydro regards as safe and efficient.
Measurement of power
6 All power supplied by Manitoba Hydro (other than that supplied on a flat rate basis), shall be measured at or near the point of delivery by means of a suitable meter or meters supplied by Manitoba Hydro, which shall be of commercial accuracy, and approved, tested, and sealed by the Department of Consumers and Corporate Affairs (Canada).
Meter space and risk of damage
7 The user shall provide and maintain without charge, convenient, accessible, and safe space at or near the point of delivery for Manitoba Hydro's meters, wires, facilities, and equipment, which shall be in the care and at the risk of the user, and if lost, destroyed, or damaged, other than by ordinary wear and tear, the user shall pay Manitoba Hydro on demand an amount equal to the value thereof, or the cost of repairing and replacing them as determined by Manitoba Hydro.
Right of access by Manitoba Hydro
8 Authorized employees of Manitoba Hydro shall at all reasonable times have free and uninterrupted access to the user's premises for the purpose of reading Manitoba Hydro's meters.
User not to permit removal of equipment
9 The user will not permit anyone who is not an authorized employee of Manitoba Hydro to remove, handle or tamper with Manitoba Hydro's meters, wires, facilities, and equipment.
Characteristics of power
10 The voltage, frequency, phasing, and other characteristics of power shall be determined by Manitoba Hydro, the determination of which is final and binding on the user.
Operation of electrical equipment
11 The user shall operate his electrical equipment in a manner that will not cause Manitoba Hydro's power supply to vary in voltage, frequency, and wave form in excess of that which can be considered commercially tolerable.
Limit of liability
12 Manitoba Hydro shall use reasonable diligence in providing the user with a regular and uninterrupted supply of power; but Manitoba Hydro is not liable for any loss, costs, damages, or expenses directly or indirectly resulting from any fluctuation, interruption, reduction, or failure in the supply of power.
Notice to Manitoba Hydro of certain changes
13 The user shall notify, or cause to be notified, Manitoba Hydro in writing within ten days of any alterations in the user's wiring or water heater or other use of power provided by Manitoba Hydro that should result in a change in the applicable rate.
Restriction on use of power
Payment for power
15(1) The user shall pay Manitoba Hydro for power supplied at the rates, and for a period of time, not less than the minimum term, as established by Manitoba Hydro from time to time for the class or classes of service supplied to the user.
Where no meter reading
15(2) If a meter fails to register, or fails to register correctly, or if for any reason whatsoever meter readings are unobtainable, the amount of power supplied by Manitoba Hydro to the user may be estimated by Manitoba Hydro from the best information available.
Right to estimate consumption
15(3) If Manitoba Hydro reads a user's meter less frequently than once per billing period, Manitoba Hydro may submit an account based on an estimate of the amount of power supplied to that user in a billing period.
Account for estimated consumption
15(4) An account based on an estimate of the amount of power supplied to the user in a billing period will have the same force and effect as an account based upon an actual meter reading.
Due date of account
16(1) Accounts for power submitted by Manitoba Hydro to a user are due and payable on the date indicated thereon.
Service charges
16(2) All overdue and unpaid accounts are subject to a service charge.
Remedy for default by user
Effect of violation by user
Repeal
19 Manitoba Regulation H190 - R1 is repealed.
August 16, 1990 THE MANITOBA HYDRO-ELECTRIC BOARD:
J.F. Funnell, Corporate Secretary