Placer Mining Act
SY 2003, c. 13
Yukon — Consolidated Statutes
LOI SUR L’EXTRACTION DE L’OR SY 2003, c. 13 SY 2003, ch. 13 UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON
Placer Mining Act
Loi sur l’extraction de l’or INFORMATION INFORMATION UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON c PLACER MINING ACT
LOI SUR L’EXTRACTION DE L’OR SY 2003, c. 13; amended by SY 2013, c.18; SY 2016, c.5; SY 2016, c.12; SY 2023, c.7 LY 2003, ch. 13; modifiée par LY 2013, ch. 18; LY 2016, ch. 5; LY 2016, ch. 12; LY 2023, ch. 7 Please Note: This document, prepared by the Yukon Legislative Counsel Office, is an unofficial consolidation of this Act and includes any amendments to the Act that are in force and is current to: currency date.
Veuillez noter: ce document préparé par le Bureau des conseillers législatifs du Yukon est une codification administrative de la présente loi, laquelle comporte les modifications à celle-ci qui sont en vigueur au : date en vigueur. For information concerning the date of assent or coming into force of the Act or any amendments, please see the Table of Public Statutes and the Annual Acts on the laws.yukon.ca web site. Links to amending legislation, where appropriate, are provided at the end of each
section in this document. Pour l’information concernant la date de sanction ou la date d’entrée en vigueur de la loi, ou de ses modifications, veuillez consulter le tableau des lois d’intérêt public et des lois annuelles sur le site web laws.yukon.ca. Des liens vers les lois modificatives, le cas échéant, sont fournis à la fin de chaque
article du présent document. If you find any errors or omission s in this consolidation, please contact: Si vous trouvez des erreurs ou des oublis dans cette codification, veuillez communiquer avec: Legislative Counsel Office Tel: (867) 667-8405 Email: lco@gov.yk.ca le Bureau des conseillers législatifs Tél: (867) 667-8405 courriel: lco@gov.yk.ca
Placer Mining Act
Loi sur l’extraction de l’or TABLE OF CONTENTS TABLE DES MATIÈRES c UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON Page i TABLE OF CONTENTS (TABLE DES MATIÈRES) PLACER MINING ACT
LOI SUR L’EXTRACTION DE L’OR TABLE OF CONTENTS
Section Page 1
Definitions ............................................................... 1
PART 1 DISPOSITION OF GOVERNMENT PLACER MINING RIGHTS 2
Definitions ............................................................... 1 3 Mining officials ........................................................ 3 4 Mining districts ....................................................... 3 5 Jurisdiction of Minister ............................................ 3 6 Mining recorder ...................................................... 4 7 Books kept by mining recorder ................................ 4 8 Date of entry ........................................................... 4 9 Books open to public ............................................... 5 10 Certified copies as evidence .................................... 5 11 Fees ........................................................................ 5 12 Money deposits ....................................................... 5 13 Monthly statement .................................................. 5 14 Jurisdiction of mining inspector .............................. 5 15
Summary powers of inspector ................................. 6 16 Examination of claims and mines ............................ 6 17 Right to acquire claims ........................................... 6 18 Security for damages .............................................. 7 19 Compensation ......................................................... 7 20 Nature and size of claims ........................................ 8 21 Claims elsewhere than on a creek ........................... 8 22 Claims fronting on a creek ...................................... 8 23 How measured ........................................................ 8 24 Form of claims ........................................................ 9 25 Size of discovery claims ........................................ 10 26 Extension of boundaries of claim ........................... 10 27 Forms ................................................................... 10 28 Time allowed ......................................................... 10 29 Part of claim already recorded .............................. 11 TABLE DES MATIÈRES
Article Page 1 Définitions ............................................................... 1
PARTIE 1 CESSION DES DROITS DU GOUVERNEMENT SUR L’EXPLOITATION DES PLACERS 2 Définitions ............................................................... 1 3 Fonctionnaires des exploitations minières ................ 3 4 Districts miniers ...................................................... 3 5 Compétence du ministre .......................................... 3 6 Registraire minier .................................................... 4 7 Livres tenus par le registraire minier ....................... 4 8 Date de chaque inscription ....................................... 4 9 Livres ouverts au public ........................................... 5 10 Copies conformes font foi ........................................ 5 11 Droits ...................................................................... 5 12 Dépôts de deniers .................................................... 5 13 Relevé mensuel ........................................................ 5 14 Juridiction de l’inspecteur ........................................ 5 15 Pouvoirs que l’inspecteur peut exercer
sommairement ........................................................ 6 16 Examen des claims et des mines .............................. 6 17 Droit d’acquérir des claims ...................................... 6 18 Caution pour dommages .......................................... 7 19 Indemnisation ......................................................... 7 20 Nature et dimensions des claims .............................. 8 21 Claims ailleurs que sur un ruisseau .......................... 8 22 Claims qui font face à un ruisseau ........................... 8 23 Mesurage horizontal ................................................ 8 24 Forme des claims ..................................................... 9 25 Dimension des claims découverts........................... 10 26 Extension des limites des claims ............................ 10 27 Formulaires ........................................................... 10 28 Temps accordé ...................................................... 10 29
Partie d’un claim déjà inscrit ................................. 11
Placer Mining Act
Loi sur l’extraction de l’or TABLE OF CONTENTS TABLE DES MATIÈRES Page ii UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON c 30 Location on Sunday ............................................... 11 31 When claims one hundred miles from mining recorder‘s office .................................................... 11 32 Notification of applications .................................... 11 33 Permits to prospectors .......................................... 12 34 Claim to be staked by applicant in person .............. 12 35 Abandonment and surrender of claim .................... 12 36 Limitation .............................................................. 13 37 Substitute of mining recorder ................................ 13 38 Tagging of claims .................................................. 13 39 Survey of claims .................................................... 13 40 Surveys ................................................................. 15 41 Title ....................................................................... 15 42 Forfeiture of claim ................................................. 16 43 When owner does not renew.................................. 17 44 Contesting title ...................................................... 18 45 Proportionate contribution ..................................... 18 46 When claim disposed of ......................................... 18 47 Agreements affecting title ...................................... 19 48 Right of grantee .................................................... 19 49 Rights of owner ..................................................... 20 50 When evidence of location lost ............................... 20 51 Claims of service personnel ................................... 21 52 Owners of adjoining claims.................................... 21 53 Renewing of grouped claims on the same day ....... 22 54 Rights of claim owner to water .............................. 22 55 Grant of right to divert or use water ...................... 23 56 Notice of intention to apply for water grants.......... 23 57 Application for water grant .................................... 24 58 Adjudication of mining recorder ............................ 25 59 Powers of mining recorder .................................... 25 60 Waste or excess ..................................................... 25 61 Rights saved .......................................................... 26 62 Water rights of owners of claims ........................... 26 63 Distribution of water ............................................. 27 64 Rules for measurement of water............................ 27 65 Construction of culverts ......................................... 27 66 Duty of owner ........................................................ 28 67 Liability of owners ................................................. 28 68 Transfer includes water privileges ......................... 28 69 Ground for reservoirs ............................................ 29 70 Application of sections 54 to 69 ............................. 29 71 Grant of right to run drains ................................... 29 72 Compensation ........................................................ 29 73 Property of constructor .......................................... 30 74 Application ............................................................ 30 75 Form of grant ........................................................ 30 76 Title ....................................................................... 31 77 Board of arbitrators ............................................... 31 78 Damages by dumping, etc. .................................... 32 79 Judgement of the board ........................................ 33 80 Costs of inquiry ..................................................... 33 30 Établissement de claim le dimanche ...................... 11 31 Registraire d’urgence ............................................ 11 32 Notification des demandes .................................... 11 33 Permis aux prospecteurs ....................................... 12 34 Le requérant doit avoir personnellement délimité un claim .................................................. 12 35 Abandon et remise de claims ................................ 12 36 Limites .................................................................. 13 37 Remplaçant du registraire minier .......................... 13 38 Apposition d’étiquettes .......................................... 13 39 Arpentage de claims .............................................. 13 40 Arpentages ............................................................ 15 41
Titre ...................................................................... 15 42 Déchéance du claim .............................................. 16 43 Quand le propriétaire ne renouvelle pas ................ 17 44 Contestation de
titre .............................................. 18 45 Contribution proportionnelle .................................. 18 46 Quand un claim est cédé ....................................... 18 47 Conventions qui touchent au
titre .......................... 19 48 Droit du cessionnaire ............................................ 19 49 Droits du propriétaire ........................................... 20 50 Lorsque les marques de l’établissement disparaissent ......................................................... 20 51 Claims du personnel militaire ................................ 21 52 Propriétaires de claims adjacents .......................... 21 53 Concessions rendues renouvelables le même jour ....................................................................... 22 54 Le propriétaire d’un claim a droit à l’eau ............... 22 55 Quand le droit de détourner ou d’utiliser de l’eau peut être concédé ......................................... 23 56 Préavis de demande de concessions hydrauliques ......................................................... 23 57 Demande de concession hydraulique ..................... 24 58 Décision du registraire minier ............................... 25 59 Pouvoirs du registraire minier ............................... 25 60 Gaspillage ou excès ............................................... 25 61 Droits sauvegardés................................................ 26 62 Quantité d’eau à laquelle a droit l’exploitant d’un claim ............................................................. 26 63 Distribution de l’eau .............................................. 27 64 Règles à observer pour le mesurage de l’eau ......... 27 65 Construction de ponceaux ..................................... 27 66 Devoirs du propriétaire ......................................... 28 67 Propriétaires responsables des dégâts ................... 28 68 Transfert d’un claim et privilèges hydrauliques ..... 28 69 Terrain pour réservoir ........................................... 29 70 Application des articles 54 à 69 ............................. 29 71 Droit d’établir des canaux d’écoulement ................ 29 72 Dédommagement .................................................. 29 73 Propriété de celui qui les construit ........................ 30 74 Demande .............................................................. 30 75 Forme de la concession ......................................... 30 76 Titres .................................................................... 31
Placer Mining Act
Loi sur l’extraction de l’or TABLE OF CONTENTS TABLE DES MATIÈRES c UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON Page iii 81 Death or insanity of owner .................................... 34 82 Powers of Minister over property .......................... 34 83 Charges and expenses ........................................... 35 84 Assignee to apply for grant within two months ..... 35 85 Royalty .................................................................. 36 86 Offence ................................................................. 36 87 Fees ...................................................................... 37 88 Moneys collected ................................................... 37 89 Misrepresentation, removal of legal posts, etc. ...... 37 90 Punishment ........................................................... 38 91 Application of Act .................................................. 38 92 Lease to prospect .................................................. 39 93 Application for lease of abandoned ground ............ 40 94 Evidence of expenditure ........................................ 41 95 Lessee may stake out claims ................................. 41 96 Lease on creek or river not already prospected ..... 41 97 Fees ...................................................................... 42 98 Order prohibiting entry ......................................... 42
PART 2 LAND USE AND RECLAMATION 99
Interpretation ....................................................... 43 100 Purpose of
Part 2 .................................................. 45 101 Classes of placer land use ...................................... 45 101.01 Special operating areas ......................................... 46 102 Classes 1 to 4 ........................................................ 46 103 Designated Class 1 operations ............................... 48 104 Certificate of Completion ....................................... 49 105 Form and Content of applications .......................... 50 106 Security may be required ...................................... 50 107 Minor amendments ............................................... 51 108 Operating plans ..................................................... 51 109 Minor amendments - Class 3 or 4 .......................... 52 110 Assigning an approved operating plan ................... 52 111 Inspectors and Chief ............................................. 52 112 Powers of inspectors ............................................. 53 113 Directions by inspectors ........................................ 53 114 Termination or abandonment ................................ 55 115 Obstruction ........................................................... 56 116 Regulations ........................................................... 56 117 Contraventions ...................................................... 59 118 Limitation period ................................................... 60 119 Action to enjoin not prejudiced .............................. 60 120 Language .............................................................. 60
PART 3 TRANSITIONAL PROVISIONS 121 Existing rights and duties continued ...................... 61 122 Miners Lien Act amended ...................................... 61 123 Securities Act amended ......................................... 61 124 Workers’ Compensation Act amended .................... 62 77 Conseil d’arbitrage ................................................. 31 78 Dommages à d’autres claims, etc. ......................... 32 79 Décision du conseil ................................................ 33 80 Frais de l’enquête .................................................. 33 81 Décès ou aliénation mentale du propriétaire .......... 34 82 Pouvoirs du ministre au sujet des biens ................. 34 83 Frais et dépens ...................................................... 35 84 Le cessionnaire doit demander concession dans un délai de deux mois ............................................ 35 85 Redevance ............................................................. 36 86 Infraction............................................................... 36 87 Droits .................................................................... 37 88 Deniers perçus ....................................................... 37 89 Faux exposé, enlèvement de bornes légales, etc. ........................................................................ 37 90 Peines .................................................................... 38 91 Application de la loi................................................ 38 92 Bail pour la recherche ............................................ 39 93 Demande de bail d’un terrain abandonné............... 40 94 Preuve de la dépense ............................................. 41 95 Le locataire peut marquer les claims ...................... 41 96 Bail sur ruisseau ou rivière non déjà exploré .......... 41 97 Droits .................................................................... 42 98 Décret interdisant l’entrée ..................................... 42
PARTIE 2 UTILISATION ET REMISE EN ÉTAT DES TERRES 99 Définitions ............................................................. 43 100 Objet de la
partie 2 ................................................ 45 101 Types d’activités .................................................... 45 101.01 Zones spéciales d’exploitation ................................ 46 102 Types 1 à 4 ............................................................ 46 103 Activités minières désignées de type 1 ................... 48 104 Attestation d’achèvement des activités ................... 49 105 Forme et teneur des demandes .............................. 50 106 Demande de garantie ............................................ 50 107 Modifications mineures .......................................... 51 108 Renouvellement ..................................................... 51 109 Modification mineure ⎯ type 3 ou 4 ...................... 52 110 Plan d’exploitation approuvé : cession.................... 52 111 Inspecteurs et directeur ......................................... 52 112 Pouvoir .................................................................. 53 113 Instructions données par un inspecteur ................. 53 114 Fermeture ou abandon .......................................... 55 115 Entrave .................................................................. 56 116 Règlements ............................................................ 56 117 Infractions ............................................................. 59 118 Prescription ........................................................... 60 119 Injonction .............................................................. 60 120 Langues ................................................................. 60
PARTIE 3
Placer Mining Act
Loi sur l’extraction de l’or TABLE OF CONTENTS TABLE DES MATIÈRES Page iv UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON c 125 Coming into force .................................................. 62
SCHEDULE 1 FORM 1 APPLICATION FOR GRANT FOR PLACER MINING AND AFFIDAVIT OF APPLICANT FORM 2 APPLICATION FOR RENEWAL OF GRANT FOR PLACER MINING AND AFFIDAVIT OF APPLICANT FORM 3 GRANT FOR PLACER MINING FORM 4 GRANT OF RIGHT TO DIVERT WATER AND CONSTRUCT DITCHES FORM 5 TUNNEL OR DRAIN LICENCE FORM 6 APPLICATION FOR A LEASE TO PROSPECT AND AFFIDAVIT OF THE APPLICANT FORM 7 GROUPING CERTIFICATE
SCHEDULE 2 FEES DISPOSITIONS TRANSITOIRES 121 Droits existants ..................................................... 61 122 Modification à la
Loi sur les privilèges miniers ....... 61 123 Modification à la
Loi sur les valeurs mobilières ...... 61 124 Modification à la
Loi sur les accidents du travail .... 62 125 Entrée en vigueur .................................................. 62
ANNEXE 1 FORMULAIRE 1 DEMANDE D’UNE CONCESSION D’UN CLAIM D’EXPLOITATION DE PLACER ET AFFIDAVIT DU REQUÉRANT FORMULAIRE 2 DEMANDE DE RENOUVELLEMENT DE LA CONCESSION D’UN CLAIM D’EXPLOITATION DE PLACER ET AFFIDAVIT DU REQUÉRANT FORMULAIRE 3 ACTE DE CONCESSION D’UN CLAIM D’EXPLOITATION DE PLACER FORMULAIRE 4 CONCESSION DU DROIT DE DÉTOURNER L’EAU ET DE CONSTRUIRE DES FOSSÉS FORMULAIRE 5 PERMIS POUR CANAL SOUTERRAIN OU CONDUITE FORMULAIRE 6 DEMANDE D’UN BAIL DE PROSPECTION ET AFFIDAVIT DU REQUÉRANT FORMULAIRE 7 CERTIFICAT DE GROUPEMENT
ANNEXE 2 DROITS
Placer Mining Act
Loi sur l’extraction de l’or
PART 1
PARTIE 1
Section 1
Article 1 c UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON Page 1 PLACER MINING ACT
LOI SUR L’EXTRACTION DE L’OR The Commissioner of the Yukon, by and with the advice and consent of the Legislative Assembly, enacts as follows Le Commissaire du Yukon, sur l'avis et avec le consentement de l'Assemblée législative, édicte : 1 Definit ions (Définitions ) 1
Definitions 1 Définitions In this Act,
La définition qui suit s’applique à la présente loi. “lands” means lands in respect of which the rights to the gold or other precious minerals or stones are under the administration and control of the Commissioner; « terres » « terres » Terres à l’égard desquelles les droits reliés à l’or ou aux autres minéraux précieux ou pierres précieuses sont sous la maîtrise et la gestion du Commissaire. “lands” [S.Y. 2003, c. 13, s. 1] [L.Y. 2003, ch. 13, art. 1]
PART 1 (PARTIE 1)
PART 1
PARTIE 1 DISPOSITION OF GOVERNMENT PLACER MINING RIGHTS (CESSION DES DROITS DU GOUVERNEMENT SUR L’EXPL OITATION DES PLA CERS ) DISPOSITION OF GOVERNMENT PLACER MINING RIGHTS CESSION DES DROITS DU GOUVERNEMENT SUR L’EXPLOITATION DES PLACERS 2 Definit ions (Définitions ) 2
Definitions 2 Définitions
(1) In this Part,
(1) Les définitions qui suivent s’appliquent à la présente partie. “base line ” of a creek or river means a traverse line following the general direction of the centre bottom lands of the valley of the creek or river, surveyed and established under the direction and with the approval of the Minister; « ligne de base » “claim” means any parcel of land located or granted for placer mining, and “ mining property ” includes, besides claims, any ditches or water rights used for mining on the clai m, and all other things belonging or used in the working of the claim for mining purposes; « claim » “creek” means all natural watercourses, whether usually containing water or not, and that portion of any « borne légale »
Pieu ayan t d’un bout à l’autre un diamètre minimal de cinq pouces, une hauteur minimale de quatre pieds au -dessus du sol et deux faces planes sur au moins un pied à partir du sommet. Ces deux faces planes doivent mesurer au moins quatre pouces de large. Sont inclus dans la présente définition toute souche ou tout arbre coupé et aplati ou taillé à faces selon la hauteur et les dimensions susdites. “legal post” « claim »
S’entend de tout lopin de terre localisé ou concédé pour l’exploitation d’un placer, et « propriété minière » ou « terrain minier » s’entend, outre des claims, de tous les fossés ou les droits de prise d’eau
Placer Mining Act
Loi sur l’extraction de l’or
PART 1
PARTIE 1
Section 2
Article 2 Page 2 UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON c stream below the point where it enters the valley of the parent stream, but does not include streams that have an average width of one hundred and fifty feet ; « ruisseau » “ditch” includes a flume, pipe, race, or other artificial means for conducting water by its own weight, to be used for mining purposes; « fossé » “legal post ” means a stake having a diameter throughout of not less than five inches, standing not less than four feet above the ground and flattened on two sides for at least one foot from the top, each of the sides so flattened measuring at least four inches across the face, and includes any stump or tree cut off and flattened or faced to that hei ght and size; « borne légale » “mine” means any natural stratum or bed of earth, soil, gravel, or cement that is mined for gold or other precious minerals or stones; « mine » “mining” or “ placer mining” includes every mode and method of working whatever wh ereby earth, soil, gravel, or cement may be removed, washed, shifted, or refined or otherwise dealt with, for the purpose of obtaining gold or other precious minerals or stones, but does not include the working of rock on the site; « exploitation » or « exploitation d’un placer » “mining inspector ” means a mining inspector appointed under this Part; « inspecteur des exploitations minières » “mining recorder” means a mining recorder appointed under this Part.
« registraire minier » qui servent à l’exploitation des claims, et de toutes autres choses qui en relèvent ou sont employées dans leur exploitation pour des fins minières. “claim” « exploitation » ou « exploitation d’un placer » Tout mode et toute méthode d’exploitation par lesquels de la terre, du sol, du gravier ou du ciment peuvent être enlevés, lavés, déplacés ou affinés ou autrement traités pour l’extraction de l’or ou d’autres minéraux précieux ou pierres précieuses. La présente définition exclut l’exploitation de la roche en place. “ mining” ou “placer mining” « fossé »
Sont assimilés à un fossé toute conduite d’amenée d’eau, tout tuyau, coursier ou autre moyen artificiel par lequel de l’eau destinée à servir à des fins d’exploitation est amenée par sa propre gravité. “ditch” « inspecteur des exploitations minières » Inspecteur des exploitations minières nommé aux termes de la présente partie. “mining inspector” « ligne de base »
À l’égard d’un ruisseau ou d’une rivière, ligne d’exploration arpentée et établie sous la direction et avec l’approbation du ministre qui suit la direction générale des basses terres centrales de la vallée du ruisseau ou de la rivière. “base line” « mine » Toute couche ou tout lit naturel de terre, de gravier ou de ciment creusé pour l’extraction de l’or ou d’autres minéraux précieux ou pierres précieuses. “mine” « registraire minier » Registraire minier nommé aux termes de la présente partie. “mining recorder” « ruisseau » Tous cours d’eau naturels, qu’ils contiennent ordinairement de l’eau ou non, et la
partie de tout cours d’eau en aval de l’endroit où ce cours d’eau pénètre dans la vallée du cours d’eau principal, à l’exclusion des cours d’eau d’une largeur moyenne de 150 pieds. “creek”
(2) Nothing contained in this Part shall be construed as limiting the right of the Commissioner, from time to time, to lay out public roads across, through, along or under any claim, ditch, o r water privilege, without compensation.
(2) La présente
partie n’a pas pour effet de restreindre le droit du Commissaire d’établir, au besoin et sans indemnité, des voies publiques en travers, le long ou au-dessous de claims, de fossés ou de concessions hydrauliques.
Placer Mining Act
Loi sur l’extraction de l’or
PART 1
PARTIE 1
Section 3
Article 3 c UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON Page 3
(3) Despite anything in this Part, this Part does not apply to any lands demised or leased for hydraulic mining purposes by any lease granted before August 1, 1906 that has been cancelled before that day or that is thereafter cancelled unde r the Yukon Placer Mining Act (Canada), until those lands have been brought under this Part by order of the Commissioner in Executive Council or unless those lands were brought under
Part I of the Yukon Placer Mining Act (Canada).
(3) Malgré les autres dispositions de la présente partie, ses dispositions ne s’appliquent pas aux terres aliénées ou louées pour exploitation minière par l’hydraulique en vertu d’un bail consenti avant le ler août 1906, qui a été annulé avant cette date ou qui l’est en vertu de la
Loi sur l’extraction de l’or dans le Yukon (Canada), tant que ces terres n’ont pas été assujetties à ces dispositions par décret du commissaire en conseil exécutif, à moins qu’elles leur aient été assujetties en vertu de la
partie I de la
Loi sur l’ext raction de l’or dans le Yukon (Canada).
(4) Nothing in this Part prevents the Commissioner in Executive Council making regulations under which dredging leases may be issued for the whole bed of any river in the Yukon.
(4) La présente
partie n’a pas pour effet d’empêcher le commissaire en conseil exécutif de prendre des règlements permettant que soient délivrés des baux de dragage relatifs au lit tout entier de toute rivière du Yukon.
(5) This Part shall be construed as being subject to
Part 2 and the regulations made under it, to the extent that the provisions of
Part 2 and of the regulations made thereunder apply in respect of the lands in question.
(5) La présente
partie est assujettie à la
partie 2 et à ses règlements dans la mesure où cette par tie et ses règlements s'appliquent aux terres en question. [S.Y. 2003, c. 13, s. 2] [L.Y. 2003, ch. 13, art. 2] 3 Mining officials (Fonctionnaires des exploitat ions minières ) 3 Mining officials 3 Fonctionnaires des exploitations minières Mining recorders, mining inspectors, deputy mining recorders, and deputy mining inspectors shall be appointed under the Public Service A ct for the purpose of carrying out this Part. Des registraires miniers, inspecteurs des exploitations minières, registraires miniers adjoints et inspecteurs adjoints des exploitations minières sont nommés en vertu de la
Loi sur la fonction publique pour l’application de la présente partie. [S.Y. 2003, c. 13, s. 3] [L.Y. 2003, ch. 13, art. 3] 4 Mining districts (Districts miniers ) 4 Mining districts 4 Districts miniers The Commissione r in Executive Council may, by regulation, divide the Yukon into districts to be known as mining districts, and may, as occasion requires, change the boundaries of those districts.
Le commissaire en conseil exécutif peut, par règlement, diviser le Yukon en districts qui seront connus sous le nom de districts miniers et il peut en changer les limites. [S.Y. 2003, c. 13, s. 4] [L.Y. 2003, ch. 13, art. 4] 5 Jurisdiction of Minister (Compét ence du ministre) 5 Jurisdiction of Minister 5 Compétence du ministre The Minister possesses all the powers and authority of a mining recorder and mining inspector. Le ministre possède tous les pouvoirs et la pleine autorité d’un registraire minier et d’un inspecteur des exploitations minières. [S.Y. 2003, c. 13, s. 5] [L.Y. 2003, ch. 13, art. 5]
Placer Mining Act
Loi sur l’extraction de l’or
PART 1
PARTIE 1
Section 6
Article 6 Page 4 UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON c 6 Mining recorder (Registraire minier ) 6 Mining recorder 6 Registraire minier A mining recorder shall be appointed for each mining district, and within that district the mining recorder possesses all the powers and authority of a mining inspector.
Un registraire minier est nommé dans chaque district minier et, dans les limites de ce district, il est investi de tous les pouvoirs et de la pleine autorité d’un inspecteur des exploitations minières. [S.Y. 2003, c. 13, s. 6] [L.Y. 2003, ch. 13, art. 6] 7 Books kept by mining recorder (Livres tenus par le registraire minier ) 7 Books kept by mining recorder 7 Livres tenus par le registraire minier
(1) Every mining recorder shall keep the following books to be used for placer mining entries
(1) Tout registraire minier tient les livres suivants, pour servir aux inscriptions d’exploitations de placers : (
a) record of applications,
a) un registre des demandes; (
b) record of refused applications,
b) un registre des demandes rejetées; (
c) record book,
c) un livre d’archives; (
d) record of abandonments, and
d) un registre des abandons; (
e) record of documents received,
e) un registre des documents reçus. and the mining recorder shall record all documents relating to mining property that are brought to him or her for record and file all documents relating to claims that are brought to him or her to be filed. Il inscrit les documents, relatifs aux propriétés minières, qui lui sont présentés pour être inscrits, et classe tous les documents, relatifs à ces claims, qui lui sont apportés en dépôt.
(2) Where a caveat is filed against any claim, the caveat lapses unless, before the expiration of one month from the receipt of it by a mining recorder, proceedings in a court of competent jurisdiction have been taken to establish the caveator’s title to the interests specified in the caveat.
(2) Lorsqu’une mise en garde est déposée à l’encontre d’un claim, elle devient nulle à moins que, avant l’expiration d’un mois à compter de sa réception par le registraire minier, des procédures n’aient été prises devant un tribunal compétent pour établir le
titre de l’auteur de cette mise en garde à l’intérêt qui y est mentionné.
(3) A caveat is any instrument claiming any interest whatever in the claim with reference to which it is filed, but does not in clude any instrument creating any sale, mortgage, or other disposition of the property.
(3) Une mise en garde est une pièce contenant la réclamation d’un intérêt quelconque dans le claim au sujet duquel elle est produite; mais elle ne comprend pas un acte créant vente, hypothèque ou autre aliénation de la propriété. [S.Y. 2003, c. 13, s. 7] [L.Y. 2003, ch. 13, art. 7] 8 Date of entry (Date de c haque inscription ) 8 Date of entry 8 Date de chaque inscription Every entry made in any of the books of a mining recorder shall show the date on which the entry is made. Toute inscription faite dans les livres du registraire minier révèle la date à laquelle elle est faite. [S.Y. 2003, c. 13, s. 8] [L.Y. 2003, ch. 13, art. 8]
Placer Mining Act
Loi sur l’extraction de l’or
PART 1
PARTIE 1
Section 9
Article 9 c UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON Page 5 9 Books open to public (L ivres ouverts au public) 9 Books open to public 9 Livres ouverts au public All books of record and documents filed in the office of a mining recorder shall, during office hours, be open to public inspection free of charge.
Durant les heures de bureau, le public a gratuitement accès à tous les registres et documents déposés au bureau du registraire minier. [S.Y. 2003, c. 13, s. 9] [L.Y. 2003, ch. 13, art. 9] 10 Certified copies as evidence (Copies conf ormes font foi) 10 Certified copies as evidence 10 Copies conformes font foi Every copy of, or extract from, any entry in any of the books of record, or of any document, filed in the office of a mining re corder, certified by the mining recorder to be a true copy or extract, shall be admitted in any court as evidence of the matters contained in it.
Toutes copies ou tous extraits d’une inscription faite dans les registres, ou d’un document déposé au bureau du registraire minier, doivent être acceptés par tout tribunal comme preuve des matières qu’ils contiennent, pourvu que le registraire minier ait certifié que ces copies ou extraits sont conformes. [S.Y. 2003, c. 13, s. 10] [L.Y. 2003, ch. 13, art. 10] 11 Fees (Droits) 11 Fees 11 Droits Before issuing any grant, making any entry in any book of record, or filing any document, or making any copy or extract, a mining recorder shall collect the fees payable according to
Schedule 2. Avant de délivrer un acte de concession, de faire une inscription sur un registre ou de recevoir en dépôt un document, ou d’en fai re une copie ou un extrait, le registraire minier doit percevoir les droits exigibles pour ces services, énoncés à l’annexe 2. [S.Y. 2003, c. 13, s. 11] [L.Y. 2003, ch. 13, art. 11] 12 Money deposits (Dépôts de deniers ) 12 Money deposits 12 Dépôts de deniers A mining recorder shall receive all deposits of money directed by this Part to be made with him or her. Le registraire minier reçoit tous les dépôts de deniers que la présente
partie enjoint de lui faire. [S.Y. 2003, c. 13, s. 12] [L.Y. 2003, ch. 13, art. 12] 13 Monthly statement (Relevé mensuel ) 13 Monthly statement 13 Relevé mensuel A statement of the grants issued and fees collected by a mining recorder shall be rendered to the Minister by the mining recorder at least once every month, and the statement shall be accompanied by the amount collected or, if the money has been deposited to the credit of the Commissioner, by the deposit receipts.
Tous les mois, au moins, le registraire minier fait rapport au ministre des actes de concession délivrés et des droits perçus, et ce rapport est accompagné des deniers perçus, ou des certificats de dépôt si ces deniers ont été déposés au crédit du Commissaire. [S.Y. 2003, c. 13, s. 13] [L.Y. 2003, ch. 13, art. 13] 14 Jurisdiction of mining inspector (Juridiction de l’inspecteur ) 14 Jurisdiction of mining inspector 14 Juridiction de l’inspecteur A mining inspector has jurisdiction within such mining districts as the Minister orders.
L’inspecteur des exploitations minières possède, dans les limites des districts miniers, la juridi ction que le ministre détermine. [S.Y. 2003, c. 13, s. 14] [L.Y. 2003, ch. 13, art. 14]
Placer Mining Act
Loi sur l’extraction de l’or
PART 1
PARTIE 1
Section 15
Article 15 Page 6 UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON c 15
Summary powers of ins pector (Pouvoirs que l’inspecteur peut exercer
sommairement ) 15
Summary powers of inspector 15 Pouvoirs que l’inspecteur peut exercer
sommairement
(1) A mining inspector may summari ly order any mining works to be so carried on as not to interfere with, or endanger the safety of, the public, any employees of the mining works, any public work or highway, or any mining property, mineral claim, bed - rock drain or bed-rock flume.
(1) L’inspecteur des exploitations minières peut ordonner
sommairement que tous les travaux d’exploitation soient exécutés de manière à ne pas gêner ou exposer la sécurité du public ou des ouvriers employés à ces travaux d’exploitation, ou d’un ouvrage ou chemin p ublic, ou d’une propriété minière, d’un claim minéral, d’un drain de roche de fond ou d’une conduite d’amenée de roche de fond.
(2) A mining inspector may order that abandoned works be either filled up or guarded to the inspector’s satisfaction.
(2) Tous travaux abandonnés peuvent être, par ordre de l’inspecteur des exploitations minières, comblés ou gardés à sa satisfaction.
(3) Any person affected by an order of a mining inspector under this
section may, within ten days, appeal from it to the Minister.
(3) Toute personne visée par un ordre de l’inspecteur des exploitations minières en exécution du présent
article peut, dans les dix jours, interjeter appel de cet ordre devant le ministre. [S.Y. 2003, c. 13, s. 15] [L.Y. 2003, ch. 13, art. 15] 16 Examinat ion of claims and mines (Examen des claims et des mines ) 16 Examination of claims and mines 16 Examen des claims et des mines The Minister, mining recorder, or mining inspector, or a person authorised by any of them, may enter into or on and examine any claim or mine.
Le ministre, le registraire minier, l’inspecteur des exploitations minières, ou t oute personne désignée par l’un d’eux, peut pénétrer dans ou aller sur tout claim ou toute mine et l’examiner. [S.Y. 2003, c. 13, s. 16] [L.Y. 2003, ch. 13, art. 16] 17 Right to ac quire claims (Droit d’acquérir des claims ) 17 Right to acquire claims 17 Droit d’acquérir des claims
(1) Subject to this Act, any individual eighteen years of age or over, on their own behalf, on behalf of any corporation authorized to carry on business in the Yukon, or on behalf of any other individual eighteen years of age or over, may enter for mining purposes, locate, prospect, and mine for gold and other precious minerals or stones on any lands in the Yukon.
(1) Sous réserve des autres dispositions de la présente loi, toute personne âgée d’au moins 18 ans peut, pour son propre compte, pour le compte de toute personne morale autorisée à faire des affaires au Yukon, ou pour le compte de toute autre personne âgée de 18 ans ou plus, aller sur toutes les terres au Yukon, y localiser un claim, y prospecter et creuser pour en extraire de l’or et d’autres minéraux précieux ou pierres précieuses. (2) Subsection (1) does not apply to lands
(2) Le paragraphe (1) ne s’applique pas : (
a) entry on which for the purpose of locating a claim or prospecting for gold or other precious minerals or stones is prohibited by an order under
section 98, except on the terms and conditions, if any, set out in the order;
a) aux terrains sur lesquels il est interdit d’aller aux fins de localiser un claim et de prospecter pour découvrir de l’or ou d’autres minéraux précieux ou des pierres précieuses, par décret pris en vertu de l’article 98, sauf conformément aux conditions éventuellement fixées dans le décret; (
b) used as a cemetery or burial ground;
b) aux terrains utilisés comme cimetière ou champ de sépulture;
Placer Mining Act
Loi sur l’extraction de l’or
PART 1
PARTIE 1
Section 18
Article 18 c UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON Page 7 (
c) lawfully occupied for placer mining purposes;
c) aux terrains légalement occupés pour des fins d’exploitation de placers; (
d) set apart and appropriated by the Commissioner in Executive Council to enable the Government of the Yukon to fulfil its obligations under land claims settlements;
d) aux terrains réservés ou attribués au gouvernement du Yukon par le commissaire en conseil exécutif afin que le gouvernement s’acquitte de ses obligations en vertu des règlements sur les revendications territoriales; (
e) within the boundaries of a city, town, or village, as defined in the Municipal Ac t, unless under regulations approved by the Commissioner in Executive Council; or
e) aux terrains compris dans les limites d’une ville ou d’un village, tel que défini dans la
Loi sur les municipalités, sauf s’ils tombent sous le régime de règlements approuvés par le commissaire en conseil exécutif; (
f) occupied by a building or within the curtilage of a dwelling-house.
f) aux terrains occupés par un bâtiment ou compris dans les limites de la dépendance d’une maison d’habitation. [S.Y. 2003, c. 13, s. 17] [L.Y. 2003, ch. 13, art. 17] 18 Security for damages (Caution pour dommages ) 18 Security for damages 18 Caution pour dommages No person shall enter on for mining purposes or shall mine on lands owned or lawfully occupied by another person until adequate security is given, to the satisfaction of a mining recorder, for any loss or damage that may be thereby caused.
Nul ne peut, aux fins d’exploitation minière, pénétrer dans des terrains possédés ou légalement occupés par une autre personne, ni y creuser, sans avoir fourni une garantie jugée suffisante par le registraire minier pour couvrir toute perte ou tout dommage pouvant résulter de ce fait.
(2) Any dispute respecting a decision of the mining recorder under subsection (1) as to the security to be given shall be heard and determined by the Yukon Surface Rights Board in accordance with the Yukon Surface Rights Board Act (Canad
a) on application by the person who is to give the security or the owner or lawful occupant of the lands.
(2) À la demande soit de la personne tenue de fournir la garantie, soit du propriétaire ou de l’occupant légitime du terrain, l’Office des droits de surface du Yukon tranche, en conformité avec la
Loi sur l’Office des droits de surface du Yukon (Canada), tout différend découlant de la décision rendue par le registraire minier au sujet de la garantie à fournir. [S.Y. 2003, c. 13, s. 18] [L.Y. 2003, ch. 13, art. 18] 19 Compensation (Indemnisation ) 19 Compensation 19 Indemnisation Persons locating, prospecting, entering on for mining purposes, or mining on lands owned or lawfully occupied by another person shall make full compensation to the owner or occupant of the lands for any loss or damage so caused, which compensation, in case of dispute, shall be determined by the Yukon Surface Rights Board in accordance with the Yukon Surface Rights Board Act (Canada).
Quiconque, aux fins d’exploitation minière, localise des terrains possédés ou légalement occupés par une autre personne, qui y prospecte, qui y pénètre ou qui y creuse est tenu d’indemniser entièrement le propriétaire ou l’occupant de ces terrains de toute perte ou de tout dommage ainsi causé. L’Office des droits de surface du Yukon tranche, en conformité avec la
Loi sur l’Offic e des droits de surface du Yukon (Canada), tout différend relatif à l’indemnité. [S.Y. 2003, c. 13, s. 19] [L.Y. 2003, ch. 13, art. 19]
Placer Mining Act
Loi sur l’extraction de l’or
PART 1
PARTIE 1
Section 20
Article 20 Page 8 UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON c 20 Nature and siz e of claims (Nature et dimensions des claims ) 20 Nature and size of claims 20 Nature et dimensions des claims
(1) A claim on a creek shall not exceed five hundred feet in length, measured along the base line of the creek, established or to be established by a Government survey, as provided in this Part.
(1) Un claim situé sur un ruisseau ne peut dépasser 500 pieds de long, mesurés le long de la ligne de base du ruisseau, établie ou à établir par un arpentage officiel, tel qu’il est prescrit à la présente partie.
(2) The side boundaries of a claim shall be lines on either side of the base line, parallel to it and one thousand feet distant from it.
(2) Les limites latérales d’un claim sont des limites tirées de l’un ou de l’autre côté de la ligne de base. Elles lui sont parallèles et en sont éloignées de mille pieds.
(3) The end boundaries of a claim shall be lines drawn at each end of the claim, at right angles to the base line, and extending not more than one thousand feet on either side of it.
(3) Les limites terminales du claim sont des lignes tirées à chaque extrémité du claim, à angles droits avec la ligne de base, et ne s’étendant pas à plus de mille pieds de l’un ou de l’autre côté.
(4) In the event that the bas e line of a claim is not established, the claim may be staked along the general direction of the valley of the creek but, in that case, shall conform to the boundaries that the base line, when established, defines.
(4) Si la ligne de base n’est pas établi e, le claim peut être marqué suivant la direction générale de la vallée du ruisseau mais doit, dans ce cas, se conformer aux limites que détermine la ligne de base quand celle -ci est établie. [S.Y. 2003, c. 13, s. 20] [L.Y. 2003, ch. 13, art. 20] 21 Claims elsewhere than on a creek (Claims ailleurs que sur un ruisseau ) 21 Claims elsewhere than on a creek 21 Claims ailleurs que sur un ruisseau A claim situated elsewhere than on a creek shall not exceed five hundred feet in length, parallel to the base line of the creek toward which it fronts, by one thousand feet.
Un claim situé ailleurs que sur un ruisseau ne peut dépasser 500 pieds de long parallèlement à la ligne de base du ruisseau vers lequel il fait face, sur mille pieds de large. [S.Y. 2003, c. 13, s. 21] [L.Y. 2003, ch. 13, art. 21] 22 Claims fronting on a creek (Claims qui font face à un ruisseau ) 22 Claims fronting on a creek 22 Claims qui font face à un ruisseau A claim fronting on a creek or river shall be staked as nearly as possible parallel to the general direction of the valley of the creek or river and shall conform to the boundaries that the base line, when established, defines.
Un claim qui fait face à un ruisseau ou à une rivi ère doit être marqué, autant que possible, parallèlement à la direction générale de la vallée de ce ruisseau ou de cette rivière, et se conformer aux limites que détermine la ligne de base quand celle-ci est établie. [S.Y. 2003, c. 13, s. 22] [L.Y. 2003, ch. 13, art. 22] 23 How meas ured (Mes urage horizontal) 23 How measured 23 Mesurage horizontal Claims shall be measured horizontally, irrespective of inequalities on the surface of the ground.
Les claims sont mesurés horizontalement, sans égard aux inégalités de la surface du sol. [S.Y. 2003, c. 13, s. 23] [L.Y. 2003, ch. 13, art. 23]
Placer Mining Act
Loi sur l’extraction de l’or
PART 1
PARTIE 1
Section 24
Article 24 c UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON Page 9 24 Form of claims (Forme des claims ) 24 Form of claims 24 Forme des claims
(1) Every claim on a creek shall be as nearly as possible rectangular in form and shall be marked by two legal posts firmly fixed in the ground on the base line at each end of the claim.
(1) Tout claim situé sur un ruisseau doit être, autant que possible, de forme rectangulaire et marqué de deux bornes légales solidement fixées au sol, sur la ligne de base, à chaque extrémité du claim.
(2) A claim situated elsewhere than on a creek shall be as nearly as possible rectangular in form and shall be marked by two legal posts firmly fixed in the ground in a line parallel to the base line and on the side nearest the creek or river toward which it fronts.
(2) Les claims situés ailleurs que sur un ruissea u doivent être, autant que possible, de forme rectangulaire et marqués de deux bornes solidement fixées au sol en une ligne parallèle à la ligne de base et du côté le plus voisin du ruisseau auquel, ou de la rivière à laquelle, il fait face.
(3) The line between the two legal posts shall be well cut out so that one post may, if the nature of the surface permits, be seen from the other.
(3) La ligne qui relie les deux bornes légales doit être bien marquée, de sorte qu’une borne puisse être vue à partir de l’autre, si la nature de la surface du sol le permet.
(4) One of the flattened sides of each legal post shall face the claim, and on each post shall be written on the side facing the claim a legible notice stating the name or number of the claim, or both if possible, its length in feet, the date when staked and the name of the locator of the claim.
(4) Un des côtés aplatis de chaque borne légale doit faire face au claim, et sur chaque borne doit être lisiblement écrit, du côté qui fait face au claim, un avis énonçant le nom ou le numéro du claim, ou les deux si possible, sa longueur en pieds, la date de sa démarcation et le nom de la personne qui l’a localisé.
(5) The legal posts shall be numbered 1 and 2 respectively, and it is not lawful to move them except that post No. 2 may be moved by a Canada Lands Surveyor if the distance between the posts exceeds the length prescribed by this Part, but not otherwise.
(5) Les bornes légales doivent être respectivement numérotées 1 et 2, et il n’est pas permis de les déplacer; la borne no 2 peut toutefois être déplacée par un arpenteur fédéral si la distance entre les deux bornes excède la longueur prescrite par la présente partie, mais non autrement.
(6) Despite anything contained in this Part, failure on the part of a locator of a claim to comply with any of the provisions of this
section shall not be deemed to invalidate the location, if, on the facts, it appears to the satisfaction of a mining recorder that there has been on the part of the locator a n honest attempt to comply with this Part, and that the non -observance of the formalities referred to in this
section is not of a character calculated to mislead other persons who desire to locate claims in the vicinity.
(6) Malgré les autres dispositions de la présente partie, la négligence de la part du localisateur d’un claim de se conformer à l’une des dispositions du présent
article n’est pas censée invalider sa localisation, si, selon les faits, il paraît, à la satisfaction du registraire minier, que le localisateur a, de bonne foi, essayé de se conformer à la présente partie, et que l’inobservation des formalités mentionnées au présent
article n’est pas de nature à induire en erreur d’autres personnes désireuses de localiser des claims dans le voisinage. [S.Y. 2003, c. 13, s. 24] [L.Y. 2003, ch. 13, art. 24]
Placer Mining Act
Loi sur l’extraction de l’or
PART 1
PARTIE 1
Section 25
Article 25 Page 10 UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON c 25 Size of discovery claims (Dimension des claims découverts) 25 Size of discovery claims 25 Dimension des claims découverts Any person or party of persons who locate the first claim on any creek, hill, bench, bar or plain, or who locate a claim on any creek, hill, bench, bar or plain on which there is no recorded claim, is entitled to a claim or claims respectively of the following size: Toute personne ou tout groupe de personnes qui localise le premier claim dans un ruisseau, sur un coteau, une terrasse, dans une crevasse ou une plaine, ou qui localise un claim dans un ruisseau, sur un coteau, une terrasse, dans une crevasse ou une plaine sur lesquels il n’y a pas de claims inscrits, a droit à un ou à plusieurs claims aux dimensions suivantes, respectivement : (
a) one locator, one claim, fifteen hundred feet in length; and
a) un localisateur : un claim de 1 500 pieds de long;
b) a party of two or more locators, two claims, each one thousand two hundred and fifty feet in length, and, for each member of the party beyond two, a claim of the ordinary size only.
b) un groupe de deux localisateurs ou plus : deux claims de 1 250 pieds de long chacun; et chaque membre du groupe, en sus de deux : un claim seulement aux dimensions ordinaires. [S.Y. 2003, c. 13, s. 25] [L.Y. 2003, ch. 13, art. 25] 26 Extension of boundaries of claim (Extension des limites des claims) 26 Extension of boundaries of claim 26 Extension des limites des claims The boundaries of any claim may, by order of the Minister or a mining recorder, on application by the owner of the claim, be enlarged to the size of a claim allowed by this Part, if the enlargement will not interfere with any mining property that is owned by any other person or that is subject to the terms of an agreement with the Commissioner.
Les limites d’un claim peuvent, par ordre du ministre ou du registraire minier, être, à la dem ande du propriétaire de ce claim, étendues jusqu’aux dimensions d’un claim reconnues par la présente partie, pourvu que cette extension n’empiète pas sur une propriété minière appartenant à une autre personne ou assujettie aux termes d’une convention avec le Commissaire. [S.Y. 2003, c. 13, s. 26] [L.Y. 2003, ch. 13, art. 26] 27 Forms (Formulaires ) 27 Forms 27 Formulaires The forms of application for grant, of application for renewal of grant, and of grant of a claim are those contained respectively in Forms 1, 2, and 3 of
Schedule 1. Les formulaires de demande de concession, de demande de renouvellement de concession et d’actes de concession d’un clai m sont ceux qui sont respectivement énoncés aux formulaires 1, 2 et 3 de l’annexe 1. [S.Y. 2003, c. 13, s. 27] [L.Y. 2003, ch. 13, art. 27] 28 Time allowed (Temps accordé ) 28 Time allowed 28 Temps accordé An application in duplicate for a grant of a claim shall be filed with the mining recorder for the district in which the claim is situated within ten days after the location of it if it is located within ten miles of the office of the mining recorder.
Une demande de concession d’un claim, faite en double exemplaire, doit être déposée entre les mains du registraire minier du district dans lequel ce claim est situé dans les dix jours qui suivent la localisation du claim, s’il est localisé dans un rayon de dix milles du bureau du registraire minier.
Placer Mining Act
Loi sur l’extraction de l’or
PART 1
PARTIE 1
Section 29
Article 29 c UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON Page 11
(2) One additional day shall be allowed for every additional ten miles or fraction for filing an application under subsection (1).
(2) Il est accordé un jour supplémentaire pour chaque rayon de dix milles ou fraction de dix milles additionnels. [S.Y. 2003, c. 13, s. 28] [L.Y. 2003, ch. 13, art. 28] 29 Part of claim already recorded (Partie d’un claim déjà inscrit ) 29 Part of claim already recorded 29
Partie d’un claim déjà inscrit No grant shall be issued by a mining recorder for a part of a claim that is already recorded. Le registraire minier ne peut émettre de concession pour une
partie d’un claim qui est déjà inscrit. [S.Y. 2003, c. 13, s. 29] [L.Y. 2003, ch. 13, art. 29] 30 Location on Sunday (Établissement de claim le dimanc he) 30 Location on Sunday 30 Établissement de claim le dimanche The location of a claim on Sunday or any public holiday is not for that reason invalid. La localisation d’un claim le dimanche ou un jour de fête public n’est pas pour cela invalide. [S.Y. 2003, c. 13, s. 30] [L.Y. 2003, ch. 13, art. 30] 31 When claims one hundred miles from mining recorder‘s office (Registraire d’urgence ) 31 When claims one hundred miles from mining recorder‘s office 31 Registraire d’urgence
(1) Where a claim is more than one hundred miles from the office of a mining recorder and situated where other claims are being located, the locators of them, not less than five in number, are authorized to meet and appoint one of their number an emergency recorder, who may receive applications for grants of claims located in accordance with this Part.
(1) Si un claim est à plus de cent milles d’un bureau de registraire minier et situé à un endroit où d’autres claims sont localisés, les localisateurs, au nombre d’au moins cinq, sont autorisés à se réunir et à nommer registraire d’urgence l’un d’entre eux. Celui -ci peut recevoir les demandes de concession de claims localisés conformément à la présente partie.
(2) The emergency recorder appointed under subsection (1) shall note on each application the day on which each application was received and the amount of fees paid in respect of the application.
(2) Le registraire d’urgence inscrit sur chaque demande la date à laquelle il l’a reçue et le montant des droits versés à cet égard. [S.Y. 2003, c. 13, s. 31] [L.Y. 2003, ch. 13, art. 31] 32 Notification of applic ations (Notificat ion des demandes) 32 Notification of applications 32 Notification des demandes
(1) The emergency recorder shall, as soon as possible after their appointment, notify the mining recorder for the district in which the claims are situated of their appointment, and shall deliver personally or otherwise to that mining recorder the applicatio ns and fees received by them in respect of those claims.
(1) Le plus tôt possible après sa nomination, le registraire d’urgence notifie sa nomination au registraire minier du district où sont situés les claims et il lui remet, personnellement ou autrement, les demandes et les droits qu’il a reçus à l’égard de ces claims.
(2) Where the emergency recorder has accepted from any person an application made in accordance with this Part and in the form set out in Form 1 of
Schedule 1 and the fee therefor, the mining recorder may issue to that person a grant in Form 3 of
Schedule 1.
(2) Lorsque le registraire d’urgence a accepté d’une personne une demande faite en conformité avec la présente
partie et selon le formulaire 1 de l’annexe 1, ainsi que le droit à cet égard, le registraire minier peut délivrer à cette personne un acte de concession selon le formulaire 3 de l’annexe 1.
(3) The grant mentioned in subsection (2) shall date from the time the emergency recorder accepted the application and fee.
(3) L’acte de concession mentionné au paragraphe (2) date du moment où le registraire d’urgence a accepté la demande et les droits.
Placer Mining Act
Loi sur l’extraction de l’or
PART 1
PARTIE 1
Section 33
Article 33 Page 12 UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON c
(4) Where the emergency recorder fails, within four months, to notify the mining recorder of their appointment and to deliver to the mining recorder the applications for claims received and the fees collected, the mining recorder may refuse to issue grants for those claims.
(4) Lorsque le registraire d’urgence omet, dans les quatre mois, de notifier sa nom ination au registraire minier et de lui remettre les demandes de claims reçues et les droits perçus, le registraire minier peut refuser de délivrer les actes de concession pour ces claims. [S.Y. 2003, c. 13, s. 32] [L.Y. 2003, ch. 13, art. 32] 33 Permits to pros pectors (Permis aux prospecteurs ) 33 Permits to prospectors 33 Permis aux prospecteurs Any person, on satisfying a mining recorder that they are about to undertake a bona fide prospecting trip, may, on payment of a fee of two dollars, receive written permission from the mining recorder allowing them to record a claim within the mining record er’s mining district at any time within a period not exceeding six months from the date of the staking the claim.
Lorsqu’une personne convainc un registraire minier qu’elle est sur le point d’entreprendre de bonne foi une excursion de recherche, elle peut, sur paiement d’un droit de deux dollars, recevoir du registraire minier un permis par écrit l’autorisant à faire inscrire un claim dans les limites du district minier du registraire à tout moment situé au cours d’une période n’excédant pas six mois à comp ter de la date à laquelle elle a jalonné le claim. [S.Y. 2003, c. 13, s. 33] [L.Y. 2003, ch. 13, art. 33] 34 Claim to be staked by applic ant in person (Le requérant doit avoir personnellement délimité un claim ) 34 Claim to be staked by applicant in person 34 Le requérant doit avoir personnellement délimité un claim No application shall be received for a claim that has not been staked by the applicant in person in the manner specified in this Part, except that if any person files with a mining recorder powers of attorney from not more than two persons, that person may stake subsequent to the filing not more than three claims in the name of each of those persons during any year the power of attorney is in force.
Aucune demande n’est reçue pour un claim qui n’a pas été jalonné par le requérant lui -même de la manière que spécifie la présente partie, mais si une personne dépose e ntre les mains du registraire minier des procurations de deux personnes au plus, elle peut à la suite d’un tel dépôt jalonner au plus trois claims au nom de chacune de ces personnes pendant toute année où la procuration est en vigueur. [S.Y. 2003, c. 13, s. 34] [L.Y. 2003, ch. 13, art. 34] 35 Abandonment and surrender of claim (Abandon et remise de claims ) 35 Abandonment and surrender of claim 35 Abandon et remise de claims
(1) A person holding a grant of a claim may, at any time, abandon the claim by giving notice in writing of their intention to do so to a mining recorder and surrendering their grant to the mining recorder.
(1) La personne qui détient la concession d’un claim peut abandonner le claim en donnant au registraire minier un préavis par écrit et en lui remettant son acte de concession.
(2) No claim that has been abandoned under subsection (1) shall be relocated within thirty days after it is abandoned, or until after notice of the abandonment has been posted up for at least a week in a conspicuous place on the claim and in the office of the mining recorder, or until a statutory declaration has been filed with the mining recorder that the notices have been so posted.
(2) Nul claim ne peut être localisé de nouveau dans les 30 jours de cet abandon sans qu’un avis de cet abandon n’ait été affiché pendant au moins une semaine dans un endroit bien en vue sur le claim et dans le bureau du registraire minier, ni sans qu’une déclaration solennelle, attestant que l’avis a été ainsi affiché, n’ait été déposée entre les mains du registraire minier.
Placer Mining Act
Loi sur l’extraction de l’or
PART 1
PARTIE 1
Section 36
Article 36 c UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON Page 13
(3) Persons holding an interest in a claim at the time of its forfeiture or ab andonment do not have the right to relocate the claim, or any part of it, within one year after the date of its forfeiture or abandonment.
(3) Les personnes qui possèdent un intérêt dans un claim, lors de sa confiscation ou de son abandon, n’ont pas le droit de localiser de nouveau ce claim, ni aucune de ses parties, au cours de l’année qui suit la date de cette confiscation ou de cet abandon. [S.Y. 2003, c. 13, s. 35] [L.Y. 2003, ch. 13, art. 35] 36 Limitation (Limites ) 36 Limitation 36 Limites Any person who records a claim in their own name or who has a claim recorded in their name by power of attorney does not have the right to locate or have located for them another claim within the valley or basin of the same creek or river within sixty days of the date on which the claim was located.
La personne qui inscrit un claim en son nom propre, ou qui a un claim inscrit en son nom propre par procuration, n’a pas le droit de localiser ou de faire localiser, pour elle, un autre claim dans les limites de la vallée ou du bassin du même ruisseau ou de la même rivière pendant les 60 jours qui suivent la date à laquelle le claim a été localisé. [S.Y. 2003, c. 13, s. 36] [L.Y. 2003, ch. 13, art. 36] 37 Substitut e of mining rec order (Remplaçant du registraire minier ) 37 Substitute of mining recorder 37 Remplaçant du registraire minier During the absence of a mining recorder from their office, an application for a claim may be received by any person whom they may appoint to perform their duties in their absence.
Pendant que le registraire minier est absent de son bureau, toute personne qu’il peut nommer pour exercer ses fonctions en son absence peut recevoir une demande de concession de claim. [S.Y. 2003, c. 13, s. 37] [L.Y. 2003, ch. 13, art. 37] 38 Tagging of claims (App osition d’étiquettes ) 38 Tagging of claims 38 Apposition d’étiquettes As soon as reasonably possible after a grant of a claim, the holder of the claim shall affix or cause to be affixed securely to each of the legal posts of the claim a metal tag plainly marked or impressed with the number and letter or letters, if any, of the grant of the claim and, in the event of default, the claim may be cancelled by a mining recorder on the application of anyone who, in the opinion of the mining recorder, has been misled by the absence of the tags.
Aussitôt qu’il es t raisonnablement possible de le faire après la concession d’un claim, le détenteur du claim appose, ou fait apposer solidement, sur chacune des bornes légales du claim, une étiquette métallique portant lisiblement la marque ou l’impression du numéro et de la ou des lettres, s’il y a lieu, de la concession du claim, et, à défaut de ce faire, la concession peut être annulée par le registraire minier, à la demande de toute personne qui, de l’avis du registraire minier, a été induite en erreur par l’absence de telles étiquettes.
(2) A mining recorder on application therefor shall supply the numbered tags mentioned in subsection (1) free of charge.
(2) La registraire minier, sur demande, fournit gratuitement l’étiquette numérotée mentionnée au paragraphe (1). [S.Y. 2003, c. 13, s. 38] [L.Y. 2003, ch. 13, art. 38] 39 Survey of claims (Arpe ntage de claims) 39 Survey of claims 39 Arpentage de claims
(1) The survey of claims made under instructions issued by direction of the Minister to a duly qualified Canada Lands Surveyor shall be accepted as defining absolutely the boundaries of the claims surveyed, if the returns of the survey ar e approved by the Minister or an official appointed by the Minister for that purpose,
(1) L’arpentage de claims fait en exécution d’instructions données par ordre du ministre à un arpenteur fédéral dûment qualifié, nommé par lui, est accepté comme déterminant absolument les limites des claims arpentés, pourvu que les procès -verbaux de l’arpentage soient approuvés par le ministre ou par un
Placer Mining Act
Loi sur l’extraction de l’or
PART 1
PARTIE 1
Section 39
Article 39 Page 14 UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON c and notice of the survey has been published in the Yukon Gazette for twelve successive issues and remains unprotested during that period. fonctionnaire nommé par lui à cette fin, pourvu que l’annonce de cet arpentage ait été publiée dans douze numéros successifs de la Gazette du Yukon et pourvu qu’il n’y ait pas eu d’opposition à cette annonce durant cette période.
(2) The owner of a claim surveyed pursuant to subsection (1) shall, prior to the first appearance of the advertisement in the Yukon Gazette, cause to be posted in a conspicuous spot on the claim a notice of their intention to advertise the survey of the cla im, and also a plan of the survey of the claim prepared by the surveyor.
(2) Le propriétaire d’un claim ainsi arpenté doit, avant que l’annonce ne paraisse pour la première fois dans la Gazette du Yukon , faire afficher, dans un endroit bien en vue sur le claim, avec un avis de son intention d’annoncer l’arpentage du claim, un plan de cet arpentage dressé par l’arpenteur.
(3) If, within the time during which the notice referred to in this
section is published, the survey is protested, the protest shall be heard and decided on by the Minister, and the costs of the hearing are in the discretion of the Minister, who may direct that the costs or any portion of them shall be paid by any party to the proceedings.
(3) Si, pendant la période de publicatio n de cet avis, opposition est faite à l’arpentage, cette opposition est entendue et jugée par le ministre, et les frais de l’instance sont répartis à la discrétion du ministre qui peut ordonner que la totalité ou une
partie de ces frais soit versée par l’une des parties à la contestation.
(4) If a decision is rendered varying the boundaries of the claim from those defined by the advertised survey, the owner of the claim may have the claim re -surveyed and new returns prepared embodying the changes involved by that decision, and the re -survey on being approved by the Minister, or the official appointed by the Minister for that purpose, may without advertisement be accepted by the Minister in lieu of the survey that has been protested.
(4) S’il est rendu une décision qui fait différer les limites du claim de celles déterminées par l’arpentage annoncé, le propriétaire du claim peut faire réarpenter le claim et faire préparer un nouveau rapport comprenant les changements qu’entraîne cette décision, et ce réarpe ntage, une fois approuvé par le ministre ou par le fonctionnaire nommé par lui à cette fin, peut être accepté, sans annonce, par le ministre à la place de l’arpentage qui a été contesté.
(5) The expenses in connection with the survey and advertisement of claims shall be defrayed by the owners of the claims, but no fees will be charged by the Government for filing plans or other documents in connection therewith.
(5) Les frais qu’entraînent l’arpentage et l’annonce des claims sont acquittés par les propri étaires des claims, mais le gouvernement n’exige pas de droits pour la production des plans ou d’autres documents qui s’y rapportent.
(6) An appeal may be taken at any time within twenty days from the decision of the Minister under this
section to the Supreme Court.
(6) Appel de la décision du ministre devant la Cour suprême peut être interjeté dans les vingt jours qui suivent cette décision.
(7) The procedure in all cases under this section, and on appeal therefrom, shall be in accordance with rules prepared by the Commissioner in Executive Council.
(7) La procédure dans toutes les contestations, sous le régime du présent article, et lors d’un appel, doit être conforme aux règles préparées par le commissaire en conseil exécutif. [S.Y. 2003, c. 13, s. 39] [L.Y. 2003, ch. 13, art. 39]
Placer Mining Act
Loi sur l’extraction de l’or
PART 1
PARTIE 1
Section 40
Article 40 c UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON Page 15 40 Surveys (Arpentages ) 40 Surveys 40 Arpentages The Minister may authorise and direct the survey of the base line of any creek or river to be made in accordance with such general instructions as may be issued by the Surveyor General (Canada), and the survey is, subject to the provisions of this Part with respect to advertisement and protest, a final determination of the location of the base line.
Le ministre peut autoriser et ordonner l’arpentage de la ligne de base de tout ruisseau ou de toute rivière, selon les instructions générales que peut donner l’arpenteur général (Canada), et cet arpentage doit, sous réserve des dispo sitions de la présente
partie relatives à l’annonce et à l’opposition, être une détermination finale du tracé de cette ligne de base. [S.Y. 2003, c. 13, s. 40] [L.Y. 2003, ch. 13, art. 40] 41 Title (Tit re) 41 Title 41
Titre
(1) Any person having duly located a claim may obtain a grant of it for one or five years by paying to a mining recorder, in advance, the fees prescribed in
Schedule 2.
(1) Toute personne qui a dûment localisé un claim peut en obtenir la concession pour un an ou pour cinq ans en payant d’avance au registraire minier les droits prévus à l’annexe 2.
(2) Any person referred to in subsection (1) is, on receiving a grant of a claim, entitled to hold the claim for the period mentioned in it, with the absolute right of renewal from year to year thereafter on payment of the renewal fee prescribed in
Schedule 2, if that person,
(2) Dès qu’elle reçoit cet acte de concession, cette personne a droit de jouir du claim durant la période mentionnée dans l’acte, avec le droit absolu de renouvellement, d’année en année, contre paiement du droit de renouvellement prescrit à l’annexe 2, si, à la fois : (
a) during each year of the period, a nd during each year for which the renewal is granted, does, or causes to be done, work on the claim to the value of two hundred dollars, in accordance with a
schedule to be prepared by the Commissioner in Executive Council; and
a) pendant chaque année au cours de cette période, et pendant chaque année pour laquelle ce renouvellement est accordé, cette personne effectue ou fait effectuer des travaux d’une valeur de 200 $ sur le claim, conformément à une échelle que prépare le commissaire en conseil exécutif; (
b) files, within fourteen days after the date of the expiration of the period or the renewal of it, with the mining recorder or his or her agent their affidavit, stating that the work has been done and setting out a detailed statement of the work done.
b) dans les quatorze jours suivant la date de l’expiration de cette période ou de ce renouvellement, cette personne dépose, entre les mains du registraire minier ou de son agent, un affidavit fait par elle ou par son agent, établissant que ces travaux o nt été effectués et en donnant un état détaillé.
(3) Any work done outside of a claim with intent to work the claim shall be deemed, if it has direct relation to the claim and is done to the satisfaction of the mining recorder, be deemed to be work done on the claim for the purposes of this section.
(3) Pour l’application du présent article, tous les travaux exécutés en dehors d’un claim pour l’exploitation de ce claim sont réputés être des travaux exécutés sur le claim s’ils se rapportent directement au claim et s’ils sont exécutés à la satisfaction du registraire minier.
(4) Where more work is performed by or on behalf of the recorded owner of a claim than is required by this Part to be performed during any year, the excess work up to a value of eight hundred dollars, on proof that it has been performed in accordance with t his Part, or the Yukon Placer Mining Act (Canad a), shall be applied
(4) Lorsqu’il est exécuté, par le propriétaire enregistré d’un claim ou pour son compte, plus de travaux que n’en exige la présente
partie pendant une année quelconque, l’excédent des travaux jusqu’à concurrence d’une v aleur de 800 $, sur preuve qu’ils ont été exécutés conformément à la présente
partie ou à la Loi
Placer Mining Act
Loi sur l’extraction de l’or
PART 1
PARTIE 1
Section 42
Article 42 Page 16 UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON c by the mining recorder on work required to be done during the subsequent year or years, and excess work may only be recorded during the year in which it was performed or within fourteen da ys of the expiration of that year. sur l’extraction de l’or dans le Yukon (Canada), est appliqué par le registraire minier aux travaux dont l’exécution est requise pendant l’année subséquente ou les années subséquentes; l’excédent des travaux ne peut être inscrit que pendant l’année où ils ont été accomplis ou dans les quatorze jours de l’expiration de l’année concernée.
(5) A
schedule prepared by the Commissioner in Executive Council under subsection (2)
(5) Une échelle que prépare le commissaire en conseil exécutif en vertu du paragraphe (2) à la fois : (
a) may establish categories of claims on the basis of any attribute or combination of attributes (which attributes may for greater certai nty include the agreement, as to the categorization of particular claims, of persons specified in the schedule);
a) peut établir des catégories de claims en fonction d’un attribut ou d’une combinaison d’attributs, étant entendu que ces derniers peuvent co mprendre l’accord des personnes visées par l’échelle à l’égard de la catégorisation de claims particuliers; (
b) may require that work on a claim be valued differently according to when the work is done or according to the category of the claim; and
b) peut exiger que les travaux effectués sur le claim soient évalués différemment, selon le moment où sont effectués les travaux ou selon la catégorie du claim; (
c) may waive, or may empower the Minister to waive, all or any portion of the renewal fee in respect of a claim or category of claims.
c) peut renoncer, ou habiliter le ministre à le faire, à tout ou
partie des droits de renouvellement à l’égard d’un claim ou d’une catégorie de claims. [S.Y. 2016, c. 12, s. 1] [S.Y. 2003, c. 13, s. 41] [L.Y. 2016, ch. 12, art. 1] [L.Y. 2003, ch. 13, art. 41] 42 Forfeit ure of claim (Déc héance du claim) 42 Forfeiture of claim 42 Déchéance du claim
(1) In the event that the work referred to in
section 41 is not done as provided in that section, the title of the owner to the claim thereupon becomes absolutely forfeited, the claim is forthwith open for relocation without any declaration of cancellation or forfeiture on the part of the Commissioner and the claim shall not be reserved from entry and relocation during the fourteen days of grace mentioned in that section.
(1) Si les travaux mentionnés à l’article 41 ne sont pas effectués de la façon qui y est prescrite, le
titre du propriétaire du claim tombe dès lors absolument en déchéance, le claim peut immédiatement faire l’objet d’une nouvelle locali sation, sans déclaration d’annulation ou de déchéance de la part du Commissaire, et le claim peut être inscrit et localisé de nouveau pendant les quatorze jours de délai mentionnés dans cet article.
(2) This
section does not affect any rights granted by the terms of any existing agreement with the Commissioner.
(2) Le présent
article ne modifie pas les droits accordés en vertu des modalités contenues dans une entente en vigueur avec le Commissaire.
(3) If the mining recorder is satisfied, on written application filed with the mining recorder by an owner of a claim, that the owner will be or has been unable to do the work referred to in
section 41 as provided in that section, owing to a restriction or requirement imposed by
Part 2 or by any other Act of Parliament or of the Legislature, the mining recorder shall grant such relief with respect to that work as may be necessary under the circumstances, subject to subsection (5).
(3) S'il estime que le propriétaire d'un claim minier ne pourra pas ou n'a pas pu effectuer les travaux visés à l'article 41 selon les modalités qui y sont prévues en raison des restrictions ou des obligations prévues à la
partie 2 ou à toute autre loi fédérale ou territoriale, le registraire minier doit, sur demande écrite du propriétaire du claim et sous réserve du paragraphe (5), accorder à l'égard de ces travaux l'aide qui peut être nécessaire dans les circonstances.
Placer Mining Act
Loi sur l’extraction de l’or
PART 1
PARTIE 1
Section 43
Article 43 c UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON Page 17
(4) If the Minister is satisfied, on written application filed with the mining recorder by an owner of a claim, that the owner will be or has been unable to do the work referred to in
section 41 as provided in that section, owing to any circumstance beyond the owner's control, other than a restriction or requirement referred to in subsection (3), the Minister may grant such relief with respect to that work as may be necessary under the circumstances, subject to subsection (5).
(4) S'il estime que le propriétaire d'un claim minier ne pourra pas ou n'a pas pu effectuer les travaux visés à l'article 41 selon les modalités qui y sont prévues, et ce pour des raisons indépendantes de sa volonté, à l'exception des restrictions ou des obligations visées au paragraphe (3), le ministre peut, sur demande écrite du propriétaire du claim au registraire minier et sous réserve du paragraphe (5), accorder à l'égard de ces travaux l'aide qui peut être nécessaire dans les circonstances.
(5) Relief granted under subsection (3) or (4) is subject to any conflicting right acquired by another person under this Part before the appli cation for relief was filed with the mining recorder.
(5) L'octroi de l'aide prévue aux paragraphes (3) et (4) est assujetti à tout droit incompatible acquis par un tiers sous le régime de la présente
partie avant la présentation de la demande d'aide au r egistraire minier. [S.Y. 2003, c. 13, s. 42] [L.Y. 2003, ch. 13, art. 42] 43 When owner does not renew (Quand le propriétaire ne renouvelle pas ) 43 When owner does not renew 43 Quand le propriétaire ne renouvelle pas
(1) Where the owner of a claim has done the required work thereon but has failed to renew the grant of the claim, a mining recorder may issue a grant to any person relocating the claim.
(1) Lorsque le propriétaire d’un claim y a effectué les travaux exigés, mais a négligé d’en renouveler la concession, le registraire minier peut délivrer un acte de concession à toute personne qui localise de nouveau ce claim.
(2) The owner of a claim may, within six months after the date on which their grant became due for renewal, apply for a renewal grant and for the cancellation of any grant so issued, and the latter grant shall be cancelled or, in the event that a grant has not been issued for the claim, any pending application for the claim shall be refused, if it is proved to the satisfaction of a mining recorder that the required work was done by the owner, and on the owner paying the expenses to which the relocator may have been put in locating and applying for the claim and, in the event that a grant has been issued for it, paying also all the expenses to which the relocator may have been put in obtaining the grant, and also compensation for any work that the relocator has performed in good faith on the claim.
(2) Le propriétaire du claim peut, dans les six mois qui suivent la date à laquelle le claim devait être renouvelé, demander un renouvellement de sa concession, et la révocation de toute concession ainsi accordée, et cette dernière concession doit être révoquée, ou, lorsqu’il n’a pas été accordé de concession du claim, toute demande pendante de concession de ce claim doit être refusée, s’il est prouvé , à la satisfaction du registraire minier, que le travail exigé a été exécuté par le propriétaire, et pourvu que le propriétaire acquitte les dépenses que le nouveau localisateur peut avoir faites pour localiser et demander le claim, et lorsqu’il a été acc ordé une concession à cet effet, pourvu qu’il solde toutes les dépenses que le nouveau localisateur a pu faire pour obtenir cette concession, ainsi qu’une indemnité pour les travaux qu’il y a exécutés de bonne foi.
(3) Where the owner of a claim fails to renew his or her grant within the time provided by this Part, the renewal fee, if paid within three months after the date of expiration, is thirty dollars, and after three months and within six months from the date of expiration is forty-five dollars.
(3) À défaut par le propriétaire d’un claim de renouveler sa concession dans le délai prescrit par la présente partie, le droit de renouvellement, s’il est acquitté dans les trois mois qui suivent la date de l’expiration, est de 30 $, et, après les trois mois et dans les six mois de cette date d’expiration, de 45 $. [S.Y. 2003, c. 13, s. 43] [L.Y. 2003, ch. 13, art. 43]
Placer Mining Act
Loi sur l’extraction de l’or
PART 1
PARTIE 1
Section 44
Article 44 Page 18 UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON c 44 Contesting t itle (Contestation de t itre) 44 Contesting title 44 Contestation de
titre
(1) No title shall be contested by any person who does not claim an adverse right except by leave of the Minister, and on that leave being given it is not necessary to have any other authority on behalf of the Commissioner.
(1) Sauf permission du ministre, nul
titre ne peut être contesté par une personne qui ne revendique pas de droit adverse. Suite à une permission du ministre, aucune autre autorisation au nom du Commissaire n’est requise.
(2) In the event that a claim reverts to the Commissioner as a consequence of litigation undertaken pursuant to the leave given under subsection (1), the plaintiff has the first right to locate the claim.
(2) Si un claim retourne au Commissaire par suite du litige qui résulte de cette permission, le demandeur a le premier droit de localiser ce claim. [S.Y. 2003, c. 13, s. 44] [L.Y. 2003, ch. 13, art. 44] 45 Proportionate contribution (Cont ribution proportionnelle ) 45 Proportionate contribution 45 Contribution proportionnelle Where two or more persons are co -owners in a claim, each person shall contribute, proportionately to his or her interest, to the work required to be done on the claim and to the payment of renewal fees, and if it is proved to a mining recorder, after notice of hearing has been served on all parties i nterested in the manner directed by the mining recorder, that any co -owner has not done so, that co -owner’s interest may, by order of the mining recorder, become vested in the other co - owners who have performed the work and paid the fees in proportion to their respective interests.
Si plusieurs personnes détiennent un claim en commun, chacune contribue, proportionnellement à son intérêt, aux travaux qui y sont requis ainsi qu’au paiement des droits de renouvellement, et si, après signification de l’avis de l’instance à toutes les parties intéressées, de la manière prescrite par le registraire minier, il est prouvé à ce dernier que l’un des copropriétaires ne l’a pas fait, l’intérêt de ce copropriétaire peut, par ordre du registraire minier, passer aux autre s copropriétaires qui ont exécuté les travaux et payé les droits, proportionnellement à leurs intérêts. [S.Y. 2003, c. 13, s. 45] [L.Y. 2003, ch. 13, art. 45] 46 When claim disposed of (Quand un claim est cédé ) 46 When claim disposed of 46 Quand un claim est cédé
(1) The owner of a claim may sell, mortgage or dispose of it if the instrument showing the disposal is deposited in duplicate with a mining recorder.
(1) Le propriétaire d’un claim peut vendre, hypothéquer ou aliéner ce claim, pourvu que la pièce qui fait preuve de cette aliénation soit déposée en double entre les mains du registraire minier.
(2) The mining recorder shall, on the deposit of the instrument referred to in subsection (1), register the instrument and return to the assignee one of the duplicates with a certificate endorsed thereon that the instrument has been recorded in their office, and retain the other.
(2) Le registraire minier, sur ce dépôt, enregistre la pièce et remet au cessionnaire une des expéditions portant à l’endos un certificat qu’elle a été enregistrée dans son bureau, et garde l’autre. [S.Y. 2003, c. 13, s. 46] [L.Y. 2003, ch. 13, art. 46]
Placer Mining Act
Loi sur l’extraction de l’or
PART 1
PARTIE 1
Section 47
Article 47 c UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON Page 19 47 Agreements affecting t itle (Conventions qui touchent au
titre ) 47 Agreements affecting title 47 Conventions qui touchent au
titre No agreement affecting the title to any claim, or to any interest in it, is enforceable against any person without notice, unless the agreement or a memorandum of it is in writing, duly signed, and is recorded in the office of the mining recorder. Nulle convention portant atteinte au
titre d’un claim ou d’un intérêt dans ce claim ne peut être exécutoire contre une personne sans qu’il lui en soit donné avis, à moins que cette convention ou tout
sommaire de cette convention ne soit écrit, dûment signé, et enregistré dans le bureau du registraire minier. [S.Y. 2003, c. 13, s. 47] [L.Y. 2003, ch. 13, art. 47] 48 Right of grantee (Droit du cessionnaire ) 48 Right of grantee 48 Droit du cessionnaire Every person who receives a grant of a claim, or the permission to record a claim within the period not exceeding six months authorized by this Part, Toute personne qui obtient la concession d’un claim ou le permis de s’inscrire pour un claim dans la période d’au plus six mois autorisée aux termes de la présente
partie : (
a) may, during the continuance of their grant or permission, fish, and shoot for their own use, subject to the provisions of any law for the protection of fish and game,
a) peut, tant que dure sa concession ou son permis, pêcher et chasser pour son propre usage, sous réserve des dispositions de toute loi pour la protection du poisson et du gibier; (
b) may cut timber, not otherwise acquired, for their own use and for any purpose incidental and necessary to the operation of their claim,
b) peut couper du bois, non autrement acquis, pour son propre usage et pour toute fin relative et nécessaire à l’exploitation de son claim; (
c) has the exclusive right to enter on their claim for the miner -like working of it and the construction and maintenance of structures, including a residence, that are required for the miner-like working of it, and
c) a le droit exclusif d'aller sur son propre claim pour l'exploiter en mineur et y construire et entretenir des installations — notamment une maison d'habitation — nécessaires à cette fin; (
d) is entitled exclusively to all the proceeds realised from it, on which, however, the royalty prescribed by this
Part is payable,
d) a exclusivement le droit à tous les produits qui en proviennent, sur lesquels doit cependant être exigible la redevance prescrite par la présente partie. but the mining recorder may grant to the holders of other claims such rights of entry on the claim as may be absolutely necessary for the working of their claims, on such terms as to him or her seem reasonable, and may also grant permits to other claim owners to cut timber thereon for their own use.
Le registraire minier peut accorder aux détenteurs d’autres claims les droits de passage sur ce claim qui peuvent être absolument nécessaires pour l’exploitation de leurs propres claims, et ce, aux conditions qu’il juge raisonnables, et il peut au ssi accorder à d’autres propriétaires de claims la permission d’y couper du bois pour leur propre usage.
(2) The Minister may, on application, grant any person operating a dredge permission to take the dredge through a mining claim owned by any other per son to adjoining property that he or she may desire to work with the same dredge, and for that purpose may grant the right to thaw, disturb, or remove such portion of the claim as in the opinion of the Minister is necessary for such operation.
(2) Le mini stre peut, sur demande, accorder à toute personne qui se sert d’une drague l’autorisation de faire passer cette drague sur un claim minier appartenant à une autre personne pour l’installer sur un claim contigu qu’elle désire exploiter avec cette drague, et, pour les fins mentionnées, il peut accorder le droit de dégeler, de remuer ou d’enlever telle
partie de ce claim qui, de l’avis du ministre, est nécessaire à cette exploitation.
Placer Mining Act
Loi sur l’extraction de l’or
PART 1
PARTIE 1
Section 49
Article 49 Page 20 UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON c
(3) Before a permission is granted under subsection (2), the applicant shall deposit with the Minister a sufficient sum of money to secure payment to the owner of the claim for all damage that may be caused by the passage of the dredge through the claim, and all damage caused by the passage through the claim shall b e assessed by the Minister and, from the moneys deposited with the Minister by the applicant, the damage as assessed shall be paid and the balance, if any, refunded.
(3) Avant que cette autorisation soit accordée, le requérant doit déposer entre les mains du ministre une somme d’argent suffisante pour assurer le paiement au propriétaire du claim de tout dommage occasionné par le passage de la drague sur ce claim, et tout dommage causé par ce passage sur le claim doit être évalué par le ministre, et, sur le montant déposé entre ses mains par le requérant, le dommage ainsi évalué doit être payé, et le reste du montant, s’il y en a, doit être remboursé.
(4) Where, in the operation necessary for the passage of the dredge referred to in subsection (2), any pay gravels are removed, the gold that may be contained in it shall be recovered by the operator of the dredge, and all such gold is the property of the owner of the claim.
(4) Lorsque, dans l’opération nécessaire au passage de la drague, des graviers aurifè res sont enlevés, l’or qui peut être contenu dans ces graviers doit être recouvré par la personne qui fait cette opération, et tout cet or est la propriété du propriétaire du claim.
(5) An appeal from an assessment of damage under this
section may be tak en at any time within ten days from the decision of the Minister to the Supreme Court with respect to the amount of the assessment.
(5) Dans les dix jours qui suivent la décision du ministre relativement au montant de l’évaluation, appel de cette décision peut être interjeté devant la Cour suprême. [S.Y. 2003, c. 13, s. 48] [L.Y. 2003, ch. 13, art. 48] 49 Rights of owner (Droits du propriét aire) 49 Rights of owner 49 Droits du propriétaire No rights of any person owning or applying for a claim shall suffer from any acts of omission or commission, or delays, on the part of any official appointed under this Part. Les actes d’omission ou de commission ou les retards d’un fonctionnaire nommé en exécution de la présente
partie ne sauraient porter atteinte aux droits d’une personne qui détient ou sollicite un claim. [S.Y. 2003, c. 13, s. 49] [L.Y. 2003, ch. 13, art. 49] 50 When evidence of location lost (Lors que les marques de l’établissement dis paraissent) 50 When evidence of location lost 50 Lorsque les marques de l’établissement disparaissent Whenever, through the acts or defaults of any person other than the recorded owner of a claim or the owner’s duly authorized agent, the evidence of the location or record on the ground or the situation of the claim has been destroyed, lost, or effaced, or is difficult to ascertain, effect shall be given to the location as far as possible, and the Minister may make all necessary inquiries, directions, and references fo r the purpose of carrying out the object of verifying the claim and vesting title in that owner.
Lorsque, par les actes ou fautes d’une autre personne que le propriétaire enregistré d’un claim ou de son agent par lui dûment autorisé, la preuve de la localisation ou de l’inscription sur le terrain ou de l’emplacement du claim a été détruite, perdue ou effacée, ou qu’il est difficile de la reconnaître, la localisation doit être, autant que possible, rétablie, et le ministre peut faire toutes les enquête s, donner tous les ordres et prendre tous les renseignements nécessaires en pareil cas dans le but de satisfaire à l’objet de vérifier le claim et d’attribuer le
titre à ce propriétaire. [S.Y. 2003, c. 13, s. 50] [L.Y. 2003, ch. 13, art. 50]
Placer Mining Act
Loi sur l’extraction de l’or
PART 1
PARTIE 1
Section 51
Article 51 c UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON Page 21 51 Claims of service personnel (Claims du personnel militaire ) 51 Claims of service personnel 51 Claims du personnel militaire The Commissio ner in Executive Council may make regulations exempting members of the armed forces of His Majesty or any of H is Majesty’s allies , during the period of their service and one year after it, from the provisions of this Part respecting forfeiture of mineral claims held by them at the time of their enlistment, for non-performance of work or non -payment of assessments or rentals.
Le commissaire en conseil exécutif peut prendre des règlements exemptant les membres des forces armées de Sa Majesté ou de l’un de ses alliés, durant la période de leur service à ce
titre et durant l’année subséquente à ce service, des dispositions de la présente
partie touchant la confiscation de claims miniers par eux détenus lors de leur enrôlement, pour défaut d’exécuter les travaux ou de payer des cotisations ou loyers. [S.Y.2023, c.7, s.20] [S.Y. 2003, c. 13, s. 51 ] [L.Y. 2003, ch. 13, art. 51] 52 Owners of adjoining claims (Propriét aires de claims adjacents) 52 Owners of adjoining claims 52 Propriétaires de claims adjacents
(1) Adjoining claims, not exceeding ten in number, may be grouped together for the performance of work by their owner or owners on filing with a mining recorder a notice of intention to group the claims and obtaining a grouping certificate in Form 7 of
Schedule 1.
(1) Des claims adjacents, au nombre d’au plus dix, peuvent être groupés pour l’exécution des travaux p ar leur ou leurs propriétaires en déposant entre les mains du registraire minier un avis de son ou de leur intention de grouper ainsi ces claims et en obtenant un certificat de groupement selon le formulaire 7 de l’annexe 1.
(2) Adjoining claims exceedin g ten in number and any number of claims some of which do not adjoin may with the approval of the Minister be grouped together for the performance of work by the owner or owners if the owner or owners show to the satisfaction of the Minister that the claims are to be operated by a system of mining that has a direct bearing on all other claims affected and renders a considerable area necessary to successful operation by the system proposed, and the Minister may, in those cases, issue a grouping certificate in Form 7 of
Schedule 1.
(2) Des claims adjacents, dont le nombre excède dix, et des claims, quel qu’en soit le nombre, dont certains ne sont pas adjacents peuvent, avec l’approbation du ministre, être groupés pour l’exécution des travaux par leur ou leurs propriétaires si ce ou ces derniers démontrent, à la satisfaction du ministre, que les claims doivent être exploités au moyen d’un système d’exploitation minière qui a un rapport direct avec tous les autres claims visés et nécessite une vaste région pour que l’exploitation au moyen du système proposé réussisse, et le ministre peut, en pareils cas, émettre un certificat de groupement selon le formulaire 7 de l’annexe 1.
(3) The holder or holders of a grouping certificate in Form 7 of
Schedule 1 may perform on any one or more of the claims, in respect of which the grouping certificate was issued, all or any part of the work required to entitle them to a certificate of work for each claim so held by them, but if the work is not done the claims shall be deeme d to be vacant and abandoned without any declaration of cancellation or forfeiture on the part of the Commissioner.
(3) Le ou les détenteurs d’un certificat de groupement, selon le formulaire 7 de l’annexe 1, peuvent exécuter, dans un ou plusieurs des cla ims à l’égard desquels le certificat de groupement a été émis, la totalité ou une
partie des travaux requis pour admettre ce ou ces détenteurs à un certificat de travaux pour chaque claim qu’ils détiennent ainsi, mais, si ces travaux ne sont pas exécutés, les claims sont censés être vacants et abandonnés, sans aucune déclaration d’annulation ou de confiscation de la part du Commissaire.
Placer Mining Act
Loi sur l’extraction de l’or
PART 1
PARTIE 1
Section 53
Article 53 Page 22 UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON c
(4) Any grouping certificate issued by the Minister may be cancelled by the Minister on the expiration of sixty days from the mailing of a notice by registered mail to the owners of the claims in the group, if it appears from the report of a mining inspector or otherwise that the system of mining contemplated when the grouping certificate was issued is not being installe d or operated with reasonable diligence.
(4) Tout certificat de groupement émis par le ministre peut être annulé par ce dernier à l’expiration de 60 jours à compter de l’envoi, par lettre recommandée, d’un avis aux propriétaires de claims dans le groupe, lorsqu’il ressort du rapport d’un inspecteur des exploitations minières ou d’une autre façon que le système d’exploitation minière, envisagé lors de la délivrance de ce certificat de groupement, n’est pas installé ou mis en fonctionnement avec une diligenc e raisonnable. [S.Y. 2003, c. 13, s. 52] [L.Y. 2003, ch. 13, art. 52] 53 Renewing of grouped claims on t he same day (Concessions rendues renouvelables le même jour ) 53 Renewing of grouped claims on the same day 53 Concessions rendues renouvelables le même jour
(1) Grants of claims in respect of which a grouping certificate has been issued, and grants of any claims within a mining district, owned by one person, may, on application by the owners, be made renewable by a mining recorder on the same date.
(1) Le registraire minier peut, sur demande du propriétaire, rendre renouvelables le même jour les concessions à l’égard desquelles un certificat de groupement a été délivré et les concessions de tous les claims que détient une même personne dans les limites d’un district minier.
(2) In granting the privilege allowed under this section, the mining recorder shall charge the applicant two dollars and fifty cents for every period of three months or less for each claim during that portion of the year it is necessary to renew it to make all the claims renewable on the same day, and the representation work required for the fractional portion of the year for which each claim is renewed shall be allowed at the rate of fifty dollars for each three months or fraction thereof, and the representation work shall be performed and recorded on or before the date from which all the claims are first made renewable.
(2) En accordant le privilège qu’autorise le présent article, le registraire minier exige du requérant, pour chaque claim, la somme de 2,50 $ par trimestre ou fraction de trimestre nécessaire pour que le renouvellement de la concession, s’il y a lieu, coïncide avec celui des autres claims; et, pour la fraction d’année pour laquelle chaque concession est renouvelée, le requérant est tenu de faire des travaux obligatoires pour une valeur de 50 $ par trimestre ou fraction de trimestre, et ces travaux obligatoires sont effectués et inscrits à ou avant la date du premier renouvellement commun des concessions. [S.Y. 2003, c. 13, s. 53] [L.Y. 2003, ch. 13, art. 53] 54 Rights of claim owner t o water (Le propriétaire d’un claim a droit à l’eau ) 54 Rights of claim owner to water 54 Le propriétaire d’un claim a droit à l’eau Every person who owns a claim is entitled to the seepage water on their claim and to the use of so much of the water naturally flowing through or past their claim, and not already lawfully appropriated, as, in the opinion of a mining inspector, is necessary for the due working of the clai m, and they are entitled to drain their own claim free of charge.
Toute personne qui détient un claim a droit à l’eau de filtration sur son claim et à l’usage de la quantité d’eau qui coule naturellement au travers ou au -delà de son claim, qui n’est pas déjà légalement attribuée et qui est, de l’avis de l’inspecteur des exploitations minières, nécessaire pour exploiter convenablement le claim; et elle a le droit d’assécher gratuitement son propre claim. [S.Y. 2003, c. 13, s. 54] [L.Y. 2003, ch. 13, art. 54]
Placer Mining Act
Loi sur l’extraction de l’or
PART 1
PARTIE 1
Section 55
Article 55 c UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON Page 23 55 Grant of right to divert or use water (Quand le droit de détourner ou d’utiliser de l’eau peut être concédé ) 55 Grant of right to divert or use water 55 Quand le droit de détourner ou d’utiliser de l’eau peut être concédé
(1) A mining recorder may, with the approval of the Minister, on application being made as mentioned in this Part, grant to any person or persons for any mining purpose or any purpose incidental to mining, for any term not exceeding five years, or in special cases for such longer term as may be determined, the right to divert or take, and use or sell, the wate r from any stream or lake, at any particular part thereof, and the right -of-way through and entry on any mining property for the purpose of constructing and repairing ditches and flumes to convey that water.
(1) Avec l’approbation du ministre et sur deman de faite aux conditions mentionnées à la présente partie, un registraire minier peut concéder à une ou à plusieurs personnes, à toute fin d’exploitation minière ou à toute fin s’y rattachant, pour une période maximale de cinq ans ou, dans des cas particuli ers, pour le laps de temps qui peut être fixé, le droit de détourner ou de prendre, d’utiliser ou de vendre l’eau de tout cours d’eau ou lac, à un endroit particulier de ce cours d’eau ou lac, ainsi que le droit de passer sur toute propriété minière dans l e but de construire et de réparer des fossés et des conduites pour amener cette eau.
(2) Before entering on or constructing or repairing works on the mining property of any other person, the applicant shall give adequate security, by bond or otherwise, to the satisfaction of the mining recorder to secure payment to the owner of the mining property of all damage caused by the entry, construction or repair.
(2) Avant d’aller sur la propriété minière d’une autre personne, ou d’y construire ou réparer des ouvrages, le requérant doit donner, par voie de cautionnement ou autrement, à la satisfaction du registraire minier, une garantie suffisante d’indemnité au propriétaire de cette propriété minière pour tout préjudice causé de ce fa it ou par la construction ou les réparations. [S.Y. 2003, c. 13, s. 55] [L.Y. 2003, ch. 13, art. 55] 56 Notice of intention t o apply for wat er grants (Préavis de demande de c oncessions hydrauliques ) 56 Notice of intention to apply for water grants 56 Préavis de demande de concessions hydrauliques
(1) Every applicant for a water grant shall post for twenty days prior to the making of the application a notice in writing of their intention to apply to a mining recorder for that grant
(1) Pendant les vingt jours qui précèdent sa demande de concession hydraulique, le requérant tient affiché un avis qu’il a l’intention de demande r cette concession au registraire minier : (
a) at the point of the proposed diversion or taking of the water,
a) au point de dérivation ou de prise d’eau projetée; (
b) on the claim on which the water is intended to be used,
b) sur le claim où cette eau est destinée à servir; (
c) on each claim or person’s land to be crossed by the water in the course of transit to the place of the user, and
c) sur chaque claim ou terrain privé que l’eau doit traverser pour se rendre chez le destinataire; (
d) in the office of the mining recorder,
d) au bureau du registraire minier. and shall forward a copy of the notice to the Minister. Il expédie une copie de cet avis au ministre.
(2) The notice referred to in subsection (1) shall state
(2) Cet avis doit énoncer les détails suivants : (
a) the name of the applicant;
a) le nom du requérant;
Placer Mining Act
Loi sur l’extraction de l’or
PART 1
PARTIE 1
Section 57
Article 57 Page 24 UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON c (
b) the name or, if unnamed, a sufficient description, of the stream, lake, or other source from which water is intended to be diverted or taken;
b) le nom, ou s’il ne porte pas de nom, une description suffisante du cours d’eau, du lac ou autre source d’où cette eau doit être détournée ou prise; (
c) the point of diversion or taking of the water or intended ditch -head, and the point where the water is to be returned to the source;
c) le point de dérivation ou de prise d’eau, ou la tête de fossé projetée, ainsi que le point où l’eau doit retourner à la source; (
d) the means by which it is intended to divert, take or store the water;
d) le moyen projeté pou r détourner, ou prendre, ou emmagasiner l’eau; (
e) the number of inches of water to be applied for;
e) le nombre de pouces d’eau demandés; (
f) the purposes for which the water is required, stated with reasonable particularity;
f) un exposé raisonnablement circonstancié des fins pour lesquelles cette eau est requise; (
g) the claim on which the water is to be used or, if the right to sell water is asked, the locality within which the right is to be exercised; and
g) le claim sur lequel l’ea u doit être employée, ou si le droit de vendre de l’eau est sollicité, dans quelle localité ce droit doit être exercé; (
h) the date of the posting of the notice and the date on which application will be made to the mining recorder for the granting of the record.
h) la date de l’affichage de l’avis et la date à laquelle demande de l’acte de concession hydraulique sera faite au registraire minier. [S.Y. 2003, c. 13, s. 56] [L.Y. 2003, ch. 13, art. 56] 57 Application f or water grant (Demande de concession hydraulique ) 57 Application for water grant 57 Demande de concession hydraulique On the day mentioned in the notice of application referred to in
section 56 or on a subsequent day and at a time to be fixed by the mining recorder, as the case may be, application shall be made by or on behalf of the applicant, either by attendance in person or by agent, or in writing, for a grant in accordance with the terms of the notice. Le jour mentionné dans l’avis de la demande, ou un jour et à une heure postérieurs que fixe le registraire minier, selon le cas, sollicitation d’une concession, en accord avec les termes de l’avis, est fait e par le requérant personnellement présent, ou en son nom par un agent, ou par écrit. [S.Y. 2003, c. 13, s. 57] [L.Y. 2003, ch. 13, art. 57]
Placer Mining Act
Loi sur l’extraction de l’or
PART 1
PARTIE 1
Section 58
Article 58 c UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON Page 25 58 Adjudication of mining recorder (Décision du registraire minier ) 58 Adjudication of mining recorder 58 Décision du registraire minier The mining recorder shall, on the day and at the time referred to in
section 57, proceed to adjudicate on the application, and may, with the approval of the Minister, on proof to the Minister’s satisfaction of the posting of the notice in the manner described in
section 56, of the ability of the applicant to construct the necessary works, of the right of the applicant to apply for a record under the provisions of this Part and of the volume of unrecorded water available for diversion having regard to existing rights and records, whether held by land owners or mine owners, and to pending applications, which fac ts shall be reported on by the mining recorder, issue to the applicant a grant, in Form 4 of
Schedule 1, of such amount of water and for such purposes as, in the discretion of the mining recorder, are reasonably required by the applicant for the purposes s pecified in his or her notice of application. Ce jour -là et à cette même heure, le registraire doit rendre sa décision sur la demande. Contre preuve satisfaisante que l’avis a été publié de la manière prévue à l’article 56, que le requérant est capable de construire les ouvrages nécessaires, qu’en vertu des dispositions précédentes de la présente
partie ou de l’une d’elles il a le droit de solliciter une concession hydraulique et que le volume d’eau non verbalisé peut être détourné, eu égard aux droits et actes de concession existants dont jouissent les propriétaires de terrains ou les propriétaires de mines ainsi qu’aux demandes pendantes, faits qui doivent être rapportés par le registraire minier, celui -ci peut, avec l’approbation du ministre, a ccorder au requérant un acte de concession, rédigé conformément à le formulaire 4 de l’annexe 1, pour la quantité d’eau et pour telles autres fins qu’au jugement du registraire minier le requérant peut raisonnablement exiger pour l’exécution des objets men tionnés dans son avis de demande. [S.Y. 2003, c. 13, s. 58] [L.Y. 2003, ch. 13, art. 58] 59 Powers of mining recorder (Pouvoirs du registraire minier ) 59 Powers of mining recorder 59 Pouvoirs du registraire minier A mining recorder may adjourn the adjudication of an application for a water grant from time to time as circumstances render expedient, and may take evidence by statutory declaration, summon and examine witnesses on oath and hear all parties whose rights are or may be affected by the application.
Le registraire minier peut différer cette décision selon que les circonstan ces rendent la chose opportune, et peut recevoir des dépositions par déclaration solennelle, assigner et interroger des témoins sous la foi du serment, et entendre toutes les parties sur les droits desquels la demande a ou peut avoir un effet. [S.Y. 2003, c. 13, s. 59] [L.Y. 2003, ch. 13, art. 59] 60 Waste or excess (Gas pillage ou excès) 60 Waste or excess 60 Gaspillage ou excès (1) Every holder of a water grant shall take all reasonable means for utilising the water granted to them, and if they wilfully waste any water or take a quantity of water in excess of their actual requirements, or have worked out or abandoned the claim or claims with respect to which the water grant was issued, a mining inspector may, on notice, cancel or reduce the grant or impose such conditions as the inspector thinks proper.
(1) Toute personne qui détient une concession hydraulique doit prendre tous les moyens raisonnables d’utiliser l’eau à elle concédée, et si, de propos délibéré, elle gaspille de l’eau ou en prend plus que pour ses besoins réels, ou a épuisé et abandonné le ou les claims à l’égard desquels la concession hydraulique a été accordée, l’inspecteur des exploitations minières peut, après avis, révoquer ou réduire la concession, ou imposer les conditions qu’il juge utiles.
(2) An appeal may be taken, at any time within ten days from any action of the mining inspector under subsection (1), to the Minister.
(2) Dans les dix jours qui suivent l’acte de l’inspecteur des exploitations minières, il peut être interjeté appel de cet acte devant le ministre. [S.Y. 2003, c. 13, s. 60] [L.Y. 2003, ch. 13, art. 60]
Placer Mining Act
Loi sur l’extraction de l’or
PART 1
PARTIE 1
Section 61
Article 61 Page 26 UNOFFICIAL CONSOLIDATION OF THE STATUTES OF YUKON CODIFICATION NON OFFICIELLE DES LOIS DU YUKON c 61 Rights saved (Droits s auvegardés) 61 Rights saved 61 Droits sauvegardés Every grant of water on an occupied creek is subject to the rights of such owners of claims as shall, at the time of the grant, be working on the stream above or below the ditch-head, and of any other persons lawfully using the water for any purpose whatever.
Toute concession hydraulique sur un ruisseau occupé doit être assujettie aux droits des propriétaires de claims qui, à la date de cette concession, travaillent sur le cours d’eau en a mont ou en aval de la tête du fossé, et de toutes les autres personnes qui se servent légalement de cette eau pour quelque objet que ce soit. [S.Y. 2003, c. 13, s. 61] [L.Y. 2003, ch. 13, art. 61] 62 Water rights of owners of claims (Quantit é d’eau à laquelle a droit l’exploitant d’un claim ) 62 Water rights of owners of claims 62 Quantité d’eau à laquelle a droit l’exploitant d’un claim
(1) If, after a water grant has been made, any person or persons locate and work in good faith any claim or claims below the ditch -head on any stream that has been diverted, they are collectively entitled to the continuous flow in the stream of the water passing the claim or claims to the following extent
(1) Si, après avoir fait la concession, une ou plusieurs personnes localisent et exploitent de bonne foi un ou plusieurs claims en aval de la tête du fossé, sur un cours d’eau ainsi détourné, elles ont collectivement droit à l’écoulement continu de l’ eau qui passe à travers le ou les claims dans ce cours d’eau, et ce, dans la mesure qui suit : (
a) if three hundred inches or less are diverted, they are entitled to not more than forty inches, and
a) s’il en est détourné 300 pouces ou moins, elles ont droit à 40 pouces, au maximum; (
b) if over three hundred inches are diverted, they are entitled to not more than sixty inc