Timber harvesting: waste discharge requirements.
AB 763
California Bills
20250AB__076398AMD INTRODUCED 2025-02-18 AMENDED_ASSEMBLY 2026-01-05 2025 AB AMD Introduced by Assembly Member Ward LEAD_AUTHOR ASSEMBLY Ward
An act to add
Section 13263.8 to the Water Code, relating to timber harvesting. timber harvesting Timber harvesting: waste discharge requirements.
The Z’berg-Nejedly Forest Practice Act of prohibits a person from conducting timber operations unless a timber harvesting plan prepared by a registered professional forester has been submitted to, and approved by, the Department of Forestry and Fire Protection.</xhtml:p><xhtml:p>Existing law prohibits an entity from substantially diverting or obstructing the natural flow of, or substantially changing or using any material from the bed, channel, or bank of, a river, stream, or lake, or deposit or dispose of debris, waste or other materials where it may pass into a river, stream, or lake unless the Department of Fish and Wildlife receives written notification of the activity and the entity has entered into a lake or stream agreement with the Department of Fish and Wildlife.
Existing law provides that an entity submitting a timber harvesting plan, as prescribed, is deemed to have given notice to the Department of Fish and Wildlife.
Existing law specifies that the Department of Fish and Wildlife is not required to issue an agreement fewer than days from the date the notification is complete.</xhtml:p><xhtml:p>This bill would require the Department of Fish and Wildlife to issue an agreement within working days of the approval of a timber harvesting plan by the Department of Forestry and Fire Protection.</xhtml:p>"?> The Porter-Cologne Water Quality Control Act requires a California regional water quality control board to prescribe waste discharge requirements for the discharge of pollutants into state waters and authorizes the regional board to prescribe general waste discharge requirements for a category of discharges if the regional board finds or determines that certain criteria apply to the discharges in that category.
This bill would require, for a regional board that has adopted general waste discharge requirements for timber harvesting, the regional board to approve, deny, or otherwise act on a request for coverage for timber harvesting operations performed consistent with an approved timber harvesting plan subject to those general waste discharge requirements.
MAJORITY NO YES NO NO NO NO NO NO NO NO The people of the State of California do enact as follows: <caml:Num>SECTION 1.</caml:Num><caml:ActionLine action="IS_AMENDED" xlink:href="urn:caml:codes:FGC:caml#xpointer(%2Fcaml%3ALawDoc%2Fcaml%3ACode%2Fcaml%3ALawHeading%5B%40type%3D'DIVISION'%20and%20caml%3ANum%3D'2.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'CHAPTER'%20and%20caml%3ANum%3D'6.'%5D%2Fcaml%3ALawSection%5Bcaml%3ANum%3D'1611.'%5D)" xlink:label="fractionType: LAW_SECTION" xlink:type="locator">Section of the <caml:DocName>Fish and Game Code</caml:DocName> is amended to read:</caml:ActionLine><caml:Fragment><caml:LawSection id="id_59CB30FA-0F9E-4FCD-8CD4-3283448DC694"><caml:Num>1611.</caml:Num><caml:LawSectionVersion id="id_D6544FA6-C0BD-4FD5-A0BA-EAD7B7D90DB2"><caml:Content><xhtml:p>(a)<xhtml:span class="EnSpace"/>An entity that submits a timber harvesting plan in accordance with
Section of the Public Resources Code or directly to the department is deemed to have given the notification required by
Section 1602, as long as the following information is included in the plan:</xhtml:p><xhtml:p>(1)<xhtml:span class="EnSpace"/>The volume, type, and equipment to be used in removing or displacing any one or combination of soil, sand, gravel, or boulders.</xhtml:p><xhtml:p>(2)<xhtml:span class="EnSpace"/>The volume of water, intended use, and equipment to be used in any water diversion or impoundment, if applicable.</xhtml:p><xhtml:p>(3)<xhtml:span class="EnSpace"/>The equipment to be used in road or bridge construction.</xhtml:p><xhtml:p>(4)<xhtml:span class="EnSpace"/>The type and density of vegetation to be affected and an estimate of the area involved.</xhtml:p><xhtml:p>(5)<xhtml:span class="EnSpace"/>A diagram or sketch of the location of the operation that clearly indicates the stream or other water and access from a named public road.
Locked gates shall be indicated and the compass direction shall be shown.</xhtml:p><xhtml:p>(6)<xhtml:span class="EnSpace"/>A description of the period of time in which operations will be carried out.</xhtml:p><xhtml:p>(b)<xhtml:span class="EnSpace"/>Notwithstanding subdivision (a), the department is not required to determine whether the notification is complete or otherwise process the notification until the timber harvesting plan and the proper notification fee have both been received by the department.</xhtml:p><xhtml:p>(c)<xhtml:span class="EnSpace"/>The department shall issue an agreement within five working days of the approval of a timber harvesting plan by the Department of Forestry and Fire Protection.</xhtml:p><xhtml:p>(d)<xhtml:span class="EnSpace"/>The date on which the term of an agreement issued pursuant to this
section begins shall be the date timber operations first commence, unless the agreement specifies a later beginning date.</xhtml:p></caml:Content></caml:LawSectionVersion></caml:LawSection></caml:Fragment></caml:BillSection>"?>
SECTION
Section 13263.8 is added to the Water Code , to read: 13263.8. For a regional board that has established general waste discharge requirements for timber harvesting pursuant to subdivision (
c) of
Section 13263, notwithstanding subdivision (
a) of
Section 13269, the regional board shall approve, deny, or otherwise act on a request for coverage for a timber harvesting operation performed consistent with an approved timber harvesting plan subject to those established general waste discharge requirements.