Underground Facility Damage Prevention And Safety (2025)

Fla. Stat. ch. 556 (2025)

Florida Statutes

CHAPTER 556

556.101

Short title; legislative intent.

(1) This

chapter may be cited as the “Underground Facility Damage Prevention and Safety Act.”

(2) It is the intent of the Legislature to provide access for excavating contractors and the public to provide notification to the system of their intent to engage in excavation or demolition. This notification system shall provide the member operators an opportunity to identify and locate their underground facilities. Under this notification system, Sunshine State One-Call of Florida, Inc., is not required or permitted to locate or mark underground facilities.

(3) It is the purpose of this

chapter to:

(4) It is not the purpose of this

chapter to amend or void any permit issued by a state agency for placement or maintenance of facilities in its right-of-way.

History. — s. 1, ch. 93-240; s. 1, ch. 97-306; s. 1, ch. 2002-234; s. 1, ch. 2006-138; s. 1, ch. 2010-100.

556.102

Definitions.

(1) “Business days” means Monday through Friday, excluding the following holidays: New Year’s Day, Birthday of Dr. Martin Luther King, Jr., Memorial Day, Independence Day, Labor Day, Thanksgiving Day and the following Friday, Christmas Eve, and Christmas Day. Any such holiday that falls on a Saturday shall be observed on the preceding Friday. Any such holiday that falls on a Sunday shall be observed on the following Monday.

(2) “Business hours” means the hours of a day during which the system is open for business.

(3) “Damage” means any impact upon or contact with, including, without limitation, penetrating, striking, scraping, displacing, or denting, however slight, the protective coating, housing, or other protective devices of any underground facility, or the removal or weakening of any lateral or vertical support from any underground facility, or the severance, partial or complete, of any underground facility.

(4) “Demolish” or “demolition” means any operation by which a structure or mass of material is wrecked, razed, rended, moved, or removed by means of any tool, equipment, or discharge of explosives, or any disturbance of the earth in any manner on public or private lands which could damage any underground facility.

(5) “Design services” means services that may be provided by a member operator to a design engineer, architect, surveyor, or planner, if the presence of underground facilities is known to a member operator, upon payment of a fee to the member operator, which services may be based on:

(6) “Excavate” or “excavation” means any manmade cut, cavity, trench, or depression in the earth’s surface, formed by removal of earth, intended to change the grade or level of land, or intended to penetrate or disturb the surface of the earth, including land beneath the waters of the state, as defined in s. 373.019(22), and the term includes pipe bursting and directional drilling or boring from one point to another point beneath the surface of the earth, or other trenchless technologies.

(7) “Excavator” or “excavating contractor” means any person performing excavation or demolition operations.

(8) “High-priority subsurface installation” means an underground gas transmission or gas distribution pipeline, or an underground pipeline used to transport gasoline, jet fuel, or any other refined petroleum product or hazardous or highly volatile liquid, such as anhydrous ammonia or carbon dioxide, if the pipeline is deemed to be critical by the operator of the pipeline and is identified as a high-priority subsurface installation to an excavator who has provided a notice of intent to excavate under s. 556.105(1), or would have been identified as a high-priority subsurface installation except for the excavator’s failure to give proper notice of intent to excavate.

(9) “Incident” means an event that involves damage to a high-priority subsurface installation that has been identified as such by the operator according to the notification procedures set forth in s. 556.116(1) and that:

(10) “Member operator” means any person who furnishes or transports materials or services by means of an underground facility.

(11) “Permanent marker” means a clearly visible indication of the approximate location of an underground facility which is made of material that is durable in nature and which is reasonably expected to remain in position for the life of the underground facility.

(12) “Person” means any individual, firm, joint venture, partnership, corporation, association, municipality, or other political subdivision, governmental unit, department, or agency, and includes any trustee, receiver, assignee, or personal representative of a person.

(13) “Positive response” means the communications among member operators, excavators, and the system concerning the status of locating an underground facility.

(14) “Premark” means to delineate the general scope of the excavation on the surface of the ground using white paint, white stakes, or other similar white markings.

(15) “Tolerance zone” means 24 inches from the outer edge of either side of the exterior surface of a marked underground facility.

(16) “Underground facility” means any public or private personal property which is buried, placed below ground, or submerged on any member operator’s right-of-way, easement, or permitted use which is being used or will be used in connection with the storage or conveyance of water; sewage; electronic, telephonic, or telegraphic communication; electric energy; oil; petroleum products; natural gas; optical signals; or other substances, and includes, but is not limited to, pipelines, pipes, sewers, conduits, cables, valves, and lines. For purposes of this act, a liquefied petroleum gas line regulated under

chapter 527 is not an underground facility unless such line is subject to the requirements of Title 49 C.F.R. adopted by the Department of Agriculture and Consumer Services, provided there is no encroachment on any member operator’s right-of-way, easement, or permitted use. Petroleum storage systems subject to regulation pursuant to

chapter 376 are not considered underground facilities for the purposes of this act unless the storage system is located on a member operator’s right-of-way or easement. Storm drainage systems are not considered underground facilities.

(17) “System” means a free-access notification system established by the corporation as provided in this act.

History. — s. 2, ch. 93-240; s. 2, ch. 94-132; s. 5, ch. 95-317; s. 2, ch. 97-306; s. 2, ch. 2002-234; s. 67, ch. 2006-1; s. 2, ch. 2006-138; s. 7, ch. 2012-150; s. 2, ch. 2020-137; s. 42, ch. 2021-51.

556.103 Creation of the corporation; establishment of the board of directors; authority of the board; annual report.

(1) The “Sunshine State One-Call of Florida, Inc.,” is created as a not-for-profit corporation. Each operator of an underground facility in this state shall be a member of the corporation and shall use and participate in the system. The corporation shall administer the provisions of this chapter. The corporation shall exercise its powers through a board of directors established pursuant to this section.

(2) The membership of the corporation shall elect a board of directors to administer the system.

(3) The corporation, through the board of directors, shall have the authority to assess the member operators to fund the system.

(4) The board of directors shall file with the Governor, not later than 60 days before the convening of each regular session of the Legislature, an annual progress report on the operation of the system, which must include a

summary of the reports to the system from the clerks of court.

(5) The board of directors shall submit to the President of the Senate, the Speaker of the House of Representatives, and the Governor, not later than 60 days before the convening of each regular session of the Legislature, an annual progress report on the participation by municipalities and counties in the one-call notification system created by this chapter. The report must include a

summary of the reports to the system from the clerks of court, a

summary of the damage reporting data received by the system under s. 556.105(12) for the preceding year, and any analysis of the data by the board of directors.

History. — s. 3, ch. 93-240; s. 3, ch. 97-306; s. 3, ch. 2006-138; s. 2, ch. 2010-100; s. 1, ch. 2017-102.

556.104 Free-access notification system.

History. — s. 4, ch. 93-240; s. 4, ch. 97-306; s. 3, ch. 2002-234; s. 4, ch. 2006-138.

556.105 Procedures.

(1)(

a) Not less than 2 full business days before beginning any excavation or demolition that is not beneath the waters of the state, and not less than 10 full business days before beginning any excavation or demolition that is beneath the waters of the state, an excavator shall provide the following information through the system:

(2) Each notification by means of the system shall be recorded to document compliance with this chapter. Such record may be made by means of electronic, mechanical, or any other method of all incoming and outgoing wire and oral communications concerning location requests in compliance with

chapter 934. The records shall be kept for 5 years and, upon written request, shall be available to the excavator making the request, the member operator intended to receive the request, and their agents. However, custody of the records may not be transferred from the system except under subpoena.

(3) The system shall provide the person who provided notification with the names of the member operators who shall be advised of the notification and a notification number that specifies the date and time of the notification.

(4) The notification number provided to the excavator under this

section shall be provided to any law enforcement officer, government code inspector, or code enforcement officer upon request.

(5) All member operators within the defined area of a proposed excavation or demolition shall be promptly notified through the system, except that member operators with state-owned underground facilities located within the right-of-way of a state highway need not be notified of excavation or demolition activities and are under no obligation to mark or locate the facilities.

(6)(

a) An excavator shall avoid excavation in the area described in the notice given under subsection (1) until each member operator underground facility has been marked and located or until the excavator has been notified that no member operator has underground facilities in the area described in the notice, or for the time allowed for markings set forth in paragraphs (5)(

a) and (b), whichever occurs first. If a member operator has not located and marked its underground facilities within the time allowed for marking set forth in paragraphs (5)(

a) and (b), the excavator may proceed with the excavation, if the excavator does so with reasonable care and if detection equipment or other acceptable means to locate underground facilities are used.

(7)(

a) A member operator that states that it does not have accurate information concerning the exact location of its underground facilities is exempt from the requirements of paragraphs (5)(

a) and (b), but shall provide the best available information to the excavator in order to comply with the requirements of this section. An excavator is not liable for any damage to an underground facility under the exemption in this subsection if the excavation or demolition is performed with reasonable care and detection equipment or other acceptable means to locate underground facilities are used.

(8)(

a) If extraordinary circumstances exist, a member operator shall notify the system of the member operator’s inability to comply with this section. For the purposes of this section, the term “extraordinary circumstances” means circumstances other than normal operating conditions that exist and make it impractical for a member operator to comply with this chapter. After the system has received notification of a member operator’s inability to comply, the system shall make that information known to excavators who subsequently notify the system of an intent to excavate.

The member operator is relieved of responsibility for compliance under the law during the period that the extraordinary circumstances exist and shall promptly notify the system when the extraordinary circumstances cease to exist.

(9)(

a) After receiving notification from the system, a member operator shall provide a positive response to the system within 2 full business days, or 10 such days for an underwater excavation or demolition, indicating the status of operations to protect the facility.

(10) A member operator shall use the “Uniform Color Code for Utilities” of the American Public Works Association when marking the horizontal route of any underground facility of the operator.

(11) Before or during excavation or demolition, if the marking of the horizontal route of any facility is removed or is no longer visible, or, in the case of an underwater facility, is inadequately documented, the excavator shall stop excavation or demolition activities in the vicinity of the facility and shall notify the system to have the route remarked or adequately documented by a member operator or in a manner approved by the member operator.

(12)(

a) If any contact with or damage to any pipe, cable or its protective covering, or any other underground facility occurs, the excavator causing the contact or damage shall immediately notify the member operator. If contact with or damage to an underground pipe or any other underground facility results in the escape of any natural gas or other hazardous substance or material regulated by the Pipeline and Hazardous Materials Safety Administration of the United States Department of Transportation, the excavator must immediately report the contact or damage by calling the 911 emergency telephone number.

Upon receiving notice, the member operator shall send personnel to the location as soon as possible to effect temporary or permanent repair of the contact or damage. Until such time as the contact or damage has been repaired, the excavator shall cease excavation or demolition activities that may cause further damage to such underground facility.

(13) Any costs or expenses associated with compliance by an excavator with the requirements in this

section applicable to excavators shall not be charged to any member operator. Any costs or expenses associated with compliance by a member operator with the requirements in this

section applicable to member operators shall not be charged to any excavator. No person shall charge the costs or expenses prohibited by this subsection after the effective date of this act. This subsection shall not excuse a member operator or excavator from liability for any damage or injury for which it would be responsible under applicable law.

History. — s. 5, ch. 93-240; s. 1, ch. 96-172; s. 1176, ch. 97-103; s. 5, ch. 97-306; s. 4, ch. 2002-234; s. 5, ch. 2006-138; s. 1, ch. 2008-230; s. 115, ch. 2010-5; s. 3, ch. 2010-100; s. 2, ch. 2017-102.

556.106 Liability of the member operator, excavator, and system.

(1) There is no liability on the part of, and no cause of action of any nature shall arise against, the board members of the corporation in their capacity as administrators of the system.

(2)(

a) If a person violates s. 556.105(1) or (6), and subsequently, whether by himself or herself or through the person’s employees, contractors, subcontractors, or agents, performs an excavation or demolition that damages an underground facility of a member operator, it is rebuttably presumed that the person was negligent. The person, if found liable, is liable for the total sum of the losses to all member operators involved as those costs are normally computed.

Any damage for loss of revenue and loss of use may not exceed $500,000 per affected underground facility, except that revenues lost by a governmental member operator whose revenues are used to support payments on principal and interest on bonds may not be limited.

(3) If, after receiving proper notice, a member operator fails to discharge a duty imposed by this act and an underground facility of a member operator is damaged by an excavator who has complied with this act, as a proximate result of the member operator’s failure to discharge such duty, the excavator is not liable for such damage and the member operator, if found liable, is liable to such person for the total cost of any loss or injury to any person or damage to equipment resulting from the member operator’s failure to comply with this act.

Any damage for loss of revenue and loss of use shall not exceed $500,000 per affected underground facility, except that revenues lost by a governmental member operator, which revenues are used to support payments on principal and interest on bonds, shall not be limited.

(4) If an owner of an underground facility fails to become a member of the corporation in order to use and participate in the system, as required by this act, and that failure is a cause of damage to that underground facility caused by an excavator who has complied with this act and has exercised reasonable care in the performance of the excavation that has caused damage to the underground facility, the owner has no right of recovery against the excavator for the damage to that underground facility.

(5) If, after receiving proper notification, the system fails to discharge its duties, resulting in damage to an underground facility, the system, if found liable, shall be liable to all parties, as defined in this act. Any damage for loss of revenue and loss of use shall not exceed $500,000 per affected underground facility, except that revenues lost by a governmental member operator, which revenues are used to support payments on principal and interest on bonds, shall not be limited.

(6) The system does not have a duty to mark or locate underground facilities and may not do so, and a right of recovery does not exist against the system for failing to mark or locate underground facilities. The system is not liable for the failure of a member operator to comply with the requirements of this chapter.

(7) An excavator or a member operator who performs any excavation with hand tools under s. 556.108(4)(

c) or (5) is liable for any damage to any operator’s underground facilities damaged during such excavation.

(8) Any liability of the state, its agencies, or its subdivisions which arises out of this

chapter is subject to the provisions of s. 768.28.

History. — s. 6, ch. 93-240; s. 810, ch. 97-103; s. 1, ch. 97-231; s. 6, ch. 97-306; s. 5, ch. 2002-234; s. 6, ch. 2006-138; s. 4, ch. 2010-100.

556.107 Violations.

(1) NONCRIMINAL INFRACTIONS. —

(2) REPORT OF INFRACTIONS. —

(3) MISDEMEANORS. —

History. — s. 7, ch. 93-240; s. 2, ch. 96-172; s. 1177, ch. 97-103; s. 6, ch. 2002-234; s. 7, ch. 2006-138; s. 5, ch. 2010-100; s. 3, ch. 2017-102; s. 3, ch. 2020-137.

556.108 Exemptions.

(1) Any excavation or demolition performed by the owner of a single-family residential property, not including property that is subdivided or is to be subdivided into more than one single-family residential property; or for such owner by a member operator or an agent of a member operator when such excavation or demolition is made entirely on such land, and only up to a depth of 10 inches; provided due care is used and there is no encroachment on any member operator’s right-of-way, easement, or permitted use.

(2) Any excavation or demolition associated with normal agricultural or railroad activities, provided such activities are not performed on any operator’s marked right-of-way, easement, or permitted use.

(3) Any excavation or demolition that occurs as the result of normal industrial activities, provided such activities are confined to the immediate secured property of the facility and the activities are not performed on any operator’s marked right-of-way, easement, or permitted use. For the purposes of this act, the industrial activities are limited to the following list of Standard Industrial Classifications: Industry Group Numbers 141, 206, 242, 243, and 491, and Major Group Numbers 13, 26, 28, and 29, as published by the United States Office of Management and Budget in 1987.

(4) Any excavation of 18 inches or less for:

(5)(

a) Any excavation with hand tools by a member operator or an agent of a member operator for:

History. — s. 8, ch. 93-240; s. 3, ch. 94-132; s. 3, ch. 96-172; s. 2, ch. 97-231; s. 39, ch. 2000-164; s. 8, ch. 2006-138.

556.109 Emergency excavations or demolitions attempted; exception.

(1) This act does not apply to making an excavation or demolition during an emergency if the system or the member operator was notified at the earliest opportunity and all reasonable precautions had been taken to protect any underground facility.

For the purposes of this act, “emergency” means any condition constituting a clear and present danger to life or property; a situation caused by the escape of any substance transported by means of an underground facility; any interruption of vital public service or communication caused by any break or defect in a member operator’s underground facility; or, in the case of the State Highway System or streets or roads maintained by a political subdivision or underground facilities owned, operated, or maintained by a political subdivision, if the use of such highways, streets, roads, or underground facilities is, in the sole judgment of the Department of Highway Safety and Motor Vehicles, the Department of Transportation, or such political subdivision, impaired by an unforeseen occurrence that necessitates repair beginning immediately after such occurrence.

(2) An excavator shall not notify the system that there is an emergency unless the excavator reasonably believes that the intended excavation or demolition is due to a situation or condition as defined in subsection (1).

History. — s. 9, ch. 93-240; s. 4, ch. 96-172; s. 6, ch. 2010-100.

556.110 Costs assessed among member operators.

History. — s. 10, ch. 93-240; s. 7, ch. 97-306; s. 7, ch. 2010-100.

556.111 Applicability to existing law.

(1) Constitute the establishment or enlargement of any rights to the use of real property or create an interest therein for the placement, construction, repair, maintenance, relocation, or excavation or demolition of any underground facility;

(2) Waive any right of a party having an interest in real property to charge any fee for the use regarding such property; or

(3) Preempt a governmental member operator from reasonable regulation of its right-of-way. This subsection does not exempt a municipality, county, district, or other local governmental member operator from the provisions of this

chapter that apply to the member operator.

History. — s. 11, ch. 93-240; s. 9, ch. 2006-138.

556.112 Design services.

(1) Each member operator shall provide to the system annually, and shall thereafter keep current, the contact names and telephone numbers of individuals who may be contacted by design engineers, architects, surveyors, and planners for the purpose of responding to requests for design services.

(2) Each member operator shall provide to the system annually, and shall thereafter keep current, a list of fees applicable to each type of design service that each member operator chooses to offer to design engineers, architects, surveyors, and planners.

(3) Each member operator, within 20 business days after receipt of the fee provided for in subsection (2), shall either respond to a request for design services, if the member operator chooses to provide the services requested, or shall notify the party requesting services that the services will not be provided.

(4) This

section shall not apply to any state agency, municipality, or county, or contractors, consultants, agents, or persons or firms acting under their authority, in the planning, preparing, or performance of work in their right-of-way. This

section shall not limit or expand any existing law governing the process a state agency, municipality, or county uses to request design services from member operators or the responsibility for providing or paying for such services.

History. — s. 7, ch. 2002-234; s. 108, ch. 2005-2.

556.113 Sunshine State One-Call of Florida, Inc.; public records exemption.

(1) As used in this section, the term “proprietary confidential business information” means information provided by:

(2) Proprietary confidential business information held by Sunshine State One-Call of Florida, Inc., for the purpose of describing the extent and root cause of damage to an underground facility or using the member ticket management software system is exempt from s. 119.07(1) and s. 24(a), Art. I of the State Constitution.

History. — s. 1, ch. 2007-101; s. 1, ch. 2012-221.

556.114 Low-impact marking practices.

(1) An excavator providing notice under s. 556.105(1)(

a) shall identify in its notice only the area that will be excavated during the period that the information in such notice is considered valid under s. 556.105(1)(c).

(2) When an excavator has not completed an excavation noticed under s. 556.105(1)(

a) within the period that the information in the notice is considered valid under s. 556.105(1)(c), the excavator must provide a subsequent notice to the system under s. 556.105(1)(

a) to continue with the excavation, and such subsequent notice shall identify only the remaining area to be excavated.

(3) When an excavation site cannot be described in information provided under s. 556.105(1)(

a) with sufficient particularity to enable the member operator to ascertain the excavation site, and if the excavator and member operator have not mutually agreed otherwise, the excavator shall premark the proposed area of the excavation before a member operator is required to identify the horizontal route of its underground facilities in the proximity of any excavation. However, premarking is not required when the premarking could reasonably interfere with traffic or pedestrian control.

(4) A member operator shall identify the horizontal route of its underground facilities as set forth in s. 556.105(5)(

a) and (b), and excavators shall premark an excavation site as set forth in subsection (3) using flags or stakes or temporary, nonpermanent paint or other industry-accepted low-impact marking practices.

(5) Any horizontal route-identification marker must be in a color identified in the Uniform Color Code for Utilities.

(6) Sunshine State One-Call of Florida, Inc., shall establish an educational program for the purpose of informing excavators and member operators about low-impact marking practices.

History. — s. 8, ch. 2010-100.

556.115 Alternative dispute resolution.

(1) Sunshine State One-Call of Florida, Inc., shall create a voluntary alternative dispute resolution program. The program shall be available to all member operators, excavators, and other stakeholders, such as locators, utility service users, and governmental or quasi-governmental entities, for purposes of resolving disputes arising from excavation activities, including, but not limited to, loss of services, down time, delays, loss of use of facilities during restoration or replacement, and similar economic disruptions, exclusive of penalties imposed under other provisions of this act.

(2) The alternative dispute resolution program created by Sunshine State One-Call of Florida, Inc., shall include mediation, arbitration, or other appropriate processes, including the use of the services of the Division of Administrative Hearings.

(3) The costs of using the program shall be borne by the voluntary users, and the voluntary users shall choose the form of alternative dispute resolution to be used. If arbitration is used, the users shall decide whether the arbitration will be binding.

(4) Unless binding arbitration is the chosen method of alternative dispute resolution, the users or any one of such users may end the process at any time and exercise the right to proceed in a court of competent jurisdiction or before the Division of Administrative Hearings.

(5) This

section does not change the basis for civil liability for damages.

History. — s. 9, ch. 2010-100.

556.116 High-priority subsurface installations; special procedures.

(1) When an excavator proposes to excavate or demolish within 15 feet of the horizontal route of an underground facility that has been identified as a high-priority subsurface installation by the operator of the facility, the operator shall, in addition to identifying the horizontal route of its facility as set forth in s. 556.105(5)(

a) and (b), and within the time period set forth in s. 556.105(9)(

a) for a positive response, notify the excavator that the facility is a high-priority subsurface installation. If the member operator provides such timely notice of the existence of a high-priority subsurface installation, an excavator shall notify the operator of the planned excavation start date and time before beginning excavation. If the member operator does not provide timely notice, the excavator may proceed, after waiting the prescribed time period set forth in s. 556.105(9)(a), to excavate without notifying the member operator of the excavation start date and time. The exemptions stated in s. 556.108 apply to the notification requirements in this subsection.

(2)(

a) An alleged commission of an infraction listed in s. 556.107(1) which results in an incident must be reported to the system and the State Fire Marshal by a member operator or an excavator within 24 hours after learning of the alleged occurrence of an incident.

History. — s. 10, ch. 2010-100; s. 126, ch. 2013-18; s. 4, ch. 2020-137.

556.117 Underground facility damage prevention and enforcement review.

History. — s. 5, ch. 2020-137.

Document details

CollectionFlorida Statutes
CitationFla. Stat. ch. 556 (2025)
Typestatute
Languageen
Formathtml
SourceFL_STATUTES
Identifier2ab9de7d0c51e645665f33790188db22abe9404f

Source file is stored in the law ingest library (html).

Underground Facility Damage Prevention And Safety (2025)

Fla. Stat. ch. 556 (2025)

Florida Statutes

Underground Facility Damage Prevention And Safety (2025)

Fla. Stat. ch. 556 (2025)

Florida Statutes

CHAPTER 556

556.101

Short title; legislative intent.

(1) This

chapter may be cited as the “Underground Facility Damage Prevention and Safety Act.”

(2) It is the intent of the Legislature to provide access for excavating contractors and the public to provide notification to the system of their intent to engage in excavation or demolition. This notification system shall provide the member operators an opportunity to identify and locate their underground facilities. Under this notification system, Sunshine State One-Call of Florida, Inc., is not required or permitted to locate or mark underground facilities.

(3) It is the purpose of this

chapter to:

(4) It is not the purpose of this

chapter to amend or void any permit issued by a state agency for placement or maintenance of facilities in its right-of-way.

History. — s. 1, ch. 93-240; s. 1, ch. 97-306; s. 1, ch. 2002-234; s. 1, ch. 2006-138; s. 1, ch. 2010-100.

556.102

Definitions.

(1) “Business days” means Monday through Friday, excluding the following holidays: New Year’s Day, Birthday of Dr. Martin Luther King, Jr., Memorial Day, Independence Day, Labor Day, Thanksgiving Day and the following Friday, Christmas Eve, and Christmas Day. Any such holiday that falls on a Saturday shall be observed on the preceding Friday. Any such holiday that falls on a Sunday shall be observed on the following Monday.

(2) “Business hours” means the hours of a day during which the system is open for business.

(3) “Damage” means any impact upon or contact with, including, without limitation, penetrating, striking, scraping, displacing, or denting, however slight, the protective coating, housing, or other protective devices of any underground facility, or the removal or weakening of any lateral or vertical support from any underground facility, or the severance, partial or complete, of any underground facility.

(4) “Demolish” or “demolition” means any operation by which a structure or mass of material is wrecked, razed, rended, moved, or removed by means of any tool, equipment, or discharge of explosives, or any disturbance of the earth in any manner on public or private lands which could damage any underground facility.

(5) “Design services” means services that may be provided by a member operator to a design engineer, architect, surveyor, or planner, if the presence of underground facilities is known to a member operator, upon payment of a fee to the member operator, which services may be based on:

(6) “Excavate” or “excavation” means any manmade cut, cavity, trench, or depression in the earth’s surface, formed by removal of earth, intended to change the grade or level of land, or intended to penetrate or disturb the surface of the earth, including land beneath the waters of the state, as defined in s. 373.019(22), and the term includes pipe bursting and directional drilling or boring from one point to another point beneath the surface of the earth, or other trenchless technologies.

(7) “Excavator” or “excavating contractor” means any person performing excavation or demolition operations.

(8) “High-priority subsurface installation” means an underground gas transmission or gas distribution pipeline, or an underground pipeline used to transport gasoline, jet fuel, or any other refined petroleum product or hazardous or highly volatile liquid, such as anhydrous ammonia or carbon dioxide, if the pipeline is deemed to be critical by the operator of the pipeline and is identified as a high-priority subsurface installation to an excavator who has provided a notice of intent to excavate under s. 556.105(1), or would have been identified as a high-priority subsurface installation except for the excavator’s failure to give proper notice of intent to excavate.

(9) “Incident” means an event that involves damage to a high-priority subsurface installation that has been identified as such by the operator according to the notification procedures set forth in s. 556.116(1) and that:

(10) “Member operator” means any person who furnishes or transports materials or services by means of an underground facility.

(11) “Permanent marker” means a clearly visible indication of the approximate location of an underground facility which is made of material that is durable in nature and which is reasonably expected to remain in position for the life of the underground facility.

(12) “Person” means any individual, firm, joint venture, partnership, corporation, association, municipality, or other political subdivision, governmental unit, department, or agency, and includes any trustee, receiver, assignee, or personal representative of a person.

(13) “Positive response” means the communications among member operators, excavators, and the system concerning the status of locating an underground facility.

(14) “Premark” means to delineate the general scope of the excavation on the surface of the ground using white paint, white stakes, or other similar white markings.

(15) “Tolerance zone” means 24 inches from the outer edge of either side of the exterior surface of a marked underground facility.

(16) “Underground facility” means any public or private personal property which is buried, placed below ground, or submerged on any member operator’s right-of-way, easement, or permitted use which is being used or will be used in connection with the storage or conveyance of water; sewage; electronic, telephonic, or telegraphic communication; electric energy; oil; petroleum products; natural gas; optical signals; or other substances, and includes, but is not limited to, pipelines, pipes, sewers, conduits, cables, valves, and lines. For purposes of this act, a liquefied petroleum gas line regulated under

chapter 527 is not an underground facility unless such line is subject to the requirements of Title 49 C.F.R. adopted by the Department of Agriculture and Consumer Services, provided there is no encroachment on any member operator’s right-of-way, easement, or permitted use. Petroleum storage systems subject to regulation pursuant to

chapter 376 are not considered underground facilities for the purposes of this act unless the storage system is located on a member operator’s right-of-way or easement. Storm drainage systems are not considered underground facilities.

(17) “System” means a free-access notification system established by the corporation as provided in this act.

History. — s. 2, ch. 93-240; s. 2, ch. 94-132; s. 5, ch. 95-317; s. 2, ch. 97-306; s. 2, ch. 2002-234; s. 67, ch. 2006-1; s. 2, ch. 2006-138; s. 7, ch. 2012-150; s. 2, ch. 2020-137; s. 42, ch. 2021-51.

556.103 Creation of the corporation; establishment of the board of directors; authority of the board; annual report.

(1) The “Sunshine State One-Call of Florida, Inc.,” is created as a not-for-profit corporation. Each operator of an underground facility in this state shall be a member of the corporation and shall use and participate in the system. The corporation shall administer the provisions of this chapter. The corporation shall exercise its powers through a board of directors established pursuant to this section.

(2) The membership of the corporation shall elect a board of directors to administer the system.

(3) The corporation, through the board of directors, shall have the authority to assess the member operators to fund the system.

(4) The board of directors shall file with the Governor, not later than 60 days before the convening of each regular session of the Legislature, an annual progress report on the operation of the system, which must include a

summary of the reports to the system from the clerks of court.

(5) The board of directors shall submit to the President of the Senate, the Speaker of the House of Representatives, and the Governor, not later than 60 days before the convening of each regular session of the Legislature, an annual progress report on the participation by municipalities and counties in the one-call notification system created by this chapter. The report must include a

summary of the reports to the system from the clerks of court, a

summary of the damage reporting data received by the system under s. 556.105(12) for the preceding year, and any analysis of the data by the board of directors.

History. — s. 3, ch. 93-240; s. 3, ch. 97-306; s. 3, ch. 2006-138; s. 2, ch. 2010-100; s. 1, ch. 2017-102.

556.104 Free-access notification system.

History. — s. 4, ch. 93-240; s. 4, ch. 97-306; s. 3, ch. 2002-234; s. 4, ch. 2006-138.

556.105 Procedures.

(1)(

a) Not less than 2 full business days before beginning any excavation or demolition that is not beneath the waters of the state, and not less than 10 full business days before beginning any excavation or demolition that is beneath the waters of the state, an excavator shall provide the following information through the system:

(2) Each notification by means of the system shall be recorded to document compliance with this chapter. Such record may be made by means of electronic, mechanical, or any other method of all incoming and outgoing wire and oral communications concerning location requests in compliance with

chapter 934. The records shall be kept for 5 years and, upon written request, shall be available to the excavator making the request, the member operator intended to receive the request, and their agents. However, custody of the records may not be transferred from the system except under subpoena.

(3) The system shall provide the person who provided notification with the names of the member operators who shall be advised of the notification and a notification number that specifies the date and time of the notification.

(4) The notification number provided to the excavator under this

section shall be provided to any law enforcement officer, government code inspector, or code enforcement officer upon request.

(5) All member operators within the defined area of a proposed excavation or demolition shall be promptly notified through the system, except that member operators with state-owned underground facilities located within the right-of-way of a state highway need not be notified of excavation or demolition activities and are under no obligation to mark or locate the facilities.

(6)(

a) An excavator shall avoid excavation in the area described in the notice given under subsection (1) until each member operator underground facility has been marked and located or until the excavator has been notified that no member operator has underground facilities in the area described in the notice, or for the time allowed for markings set forth in paragraphs (5)(

a) and (b), whichever occurs first. If a member operator has not located and marked its underground facilities within the time allowed for marking set forth in paragraphs (5)(

a) and (b), the excavator may proceed with the excavation, if the excavator does so with reasonable care and if detection equipment or other acceptable means to locate underground facilities are used.

(7)(

a) A member operator that states that it does not have accurate information concerning the exact location of its underground facilities is exempt from the requirements of paragraphs (5)(

a) and (b), but shall provide the best available information to the excavator in order to comply with the requirements of this section. An excavator is not liable for any damage to an underground facility under the exemption in this subsection if the excavation or demolition is performed with reasonable care and detection equipment or other acceptable means to locate underground facilities are used.

(8)(

a) If extraordinary circumstances exist, a member operator shall notify the system of the member operator’s inability to comply with this section. For the purposes of this section, the term “extraordinary circumstances” means circumstances other than normal operating conditions that exist and make it impractical for a member operator to comply with this chapter. After the system has received notification of a member operator’s inability to comply, the system shall make that information known to excavators who subsequently notify the system of an intent to excavate.

The member operator is relieved of responsibility for compliance under the law during the period that the extraordinary circumstances exist and shall promptly notify the system when the extraordinary circumstances cease to exist.

(9)(

a) After receiving notification from the system, a member operator shall provide a positive response to the system within 2 full business days, or 10 such days for an underwater excavation or demolition, indicating the status of operations to protect the facility.

(10) A member operator shall use the “Uniform Color Code for Utilities” of the American Public Works Association when marking the horizontal route of any underground facility of the operator.

(11) Before or during excavation or demolition, if the marking of the horizontal route of any facility is removed or is no longer visible, or, in the case of an underwater facility, is inadequately documented, the excavator shall stop excavation or demolition activities in the vicinity of the facility and shall notify the system to have the route remarked or adequately documented by a member operator or in a manner approved by the member operator.

(12)(

a) If any contact with or damage to any pipe, cable or its protective covering, or any other underground facility occurs, the excavator causing the contact or damage shall immediately notify the member operator. If contact with or damage to an underground pipe or any other underground facility results in the escape of any natural gas or other hazardous substance or material regulated by the Pipeline and Hazardous Materials Safety Administration of the United States Department of Transportation, the excavator must immediately report the contact or damage by calling the 911 emergency telephone number.

Upon receiving notice, the member operator shall send personnel to the location as soon as possible to effect temporary or permanent repair of the contact or damage. Until such time as the contact or damage has been repaired, the excavator shall cease excavation or demolition activities that may cause further damage to such underground facility.

(13) Any costs or expenses associated with compliance by an excavator with the requirements in this

section applicable to excavators shall not be charged to any member operator. Any costs or expenses associated with compliance by a member operator with the requirements in this

section applicable to member operators shall not be charged to any excavator. No person shall charge the costs or expenses prohibited by this subsection after the effective date of this act. This subsection shall not excuse a member operator or excavator from liability for any damage or injury for which it would be responsible under applicable law.

History. — s. 5, ch. 93-240; s. 1, ch. 96-172; s. 1176, ch. 97-103; s. 5, ch. 97-306; s. 4, ch. 2002-234; s. 5, ch. 2006-138; s. 1, ch. 2008-230; s. 115, ch. 2010-5; s. 3, ch. 2010-100; s. 2, ch. 2017-102.

556.106 Liability of the member operator, excavator, and system.

(1) There is no liability on the part of, and no cause of action of any nature shall arise against, the board members of the corporation in their capacity as administrators of the system.

(2)(

a) If a person violates s. 556.105(1) or (6), and subsequently, whether by himself or herself or through the person’s employees, contractors, subcontractors, or agents, performs an excavation or demolition that damages an underground facility of a member operator, it is rebuttably presumed that the person was negligent. The person, if found liable, is liable for the total sum of the losses to all member operators involved as those costs are normally computed.

Any damage for loss of revenue and loss of use may not exceed $500,000 per affected underground facility, except that revenues lost by a governmental member operator whose revenues are used to support payments on principal and interest on bonds may not be limited.

(3) If, after receiving proper notice, a member operator fails to discharge a duty imposed by this act and an underground facility of a member operator is damaged by an excavator who has complied with this act, as a proximate result of the member operator’s failure to discharge such duty, the excavator is not liable for such damage and the member operator, if found liable, is liable to such person for the total cost of any loss or injury to any person or damage to equipment resulting from the member operator’s failure to comply with this act.

Any damage for loss of revenue and loss of use shall not exceed $500,000 per affected underground facility, except that revenues lost by a governmental member operator, which revenues are used to support payments on principal and interest on bonds, shall not be limited.

(4) If an owner of an underground facility fails to become a member of the corporation in order to use and participate in the system, as required by this act, and that failure is a cause of damage to that underground facility caused by an excavator who has complied with this act and has exercised reasonable care in the performance of the excavation that has caused damage to the underground facility, the owner has no right of recovery against the excavator for the damage to that underground facility.

(5) If, after receiving proper notification, the system fails to discharge its duties, resulting in damage to an underground facility, the system, if found liable, shall be liable to all parties, as defined in this act. Any damage for loss of revenue and loss of use shall not exceed $500,000 per affected underground facility, except that revenues lost by a governmental member operator, which revenues are used to support payments on principal and interest on bonds, shall not be limited.

(6) The system does not have a duty to mark or locate underground facilities and may not do so, and a right of recovery does not exist against the system for failing to mark or locate underground facilities. The system is not liable for the failure of a member operator to comply with the requirements of this chapter.

(7) An excavator or a member operator who performs any excavation with hand tools under s. 556.108(4)(

c) or (5) is liable for any damage to any operator’s underground facilities damaged during such excavation.

(8) Any liability of the state, its agencies, or its subdivisions which arises out of this

chapter is subject to the provisions of s. 768.28.

History. — s. 6, ch. 93-240; s. 810, ch. 97-103; s. 1, ch. 97-231; s. 6, ch. 97-306; s. 5, ch. 2002-234; s. 6, ch. 2006-138; s. 4, ch. 2010-100.

556.107 Violations.

(1) NONCRIMINAL INFRACTIONS. —

(2) REPORT OF INFRACTIONS. —

(3) MISDEMEANORS. —

History. — s. 7, ch. 93-240; s. 2, ch. 96-172; s. 1177, ch. 97-103; s. 6, ch. 2002-234; s. 7, ch. 2006-138; s. 5, ch. 2010-100; s. 3, ch. 2017-102; s. 3, ch. 2020-137.

556.108 Exemptions.

(1) Any excavation or demolition performed by the owner of a single-family residential property, not including property that is subdivided or is to be subdivided into more than one single-family residential property; or for such owner by a member operator or an agent of a member operator when such excavation or demolition is made entirely on such land, and only up to a depth of 10 inches; provided due care is used and there is no encroachment on any member operator’s right-of-way, easement, or permitted use.

(2) Any excavation or demolition associated with normal agricultural or railroad activities, provided such activities are not performed on any operator’s marked right-of-way, easement, or permitted use.

(3) Any excavation or demolition that occurs as the result of normal industrial activities, provided such activities are confined to the immediate secured property of the facility and the activities are not performed on any operator’s marked right-of-way, easement, or permitted use. For the purposes of this act, the industrial activities are limited to the following list of Standard Industrial Classifications: Industry Group Numbers 141, 206, 242, 243, and 491, and Major Group Numbers 13, 26, 28, and 29, as published by the United States Office of Management and Budget in 1987.

(4) Any excavation of 18 inches or less for:

(5)(

a) Any excavation with hand tools by a member operator or an agent of a member operator for:

History. — s. 8, ch. 93-240; s. 3, ch. 94-132; s. 3, ch. 96-172; s. 2, ch. 97-231; s. 39, ch. 2000-164; s. 8, ch. 2006-138.

556.109 Emergency excavations or demolitions attempted; exception.

(1) This act does not apply to making an excavation or demolition during an emergency if the system or the member operator was notified at the earliest opportunity and all reasonable precautions had been taken to protect any underground facility.

For the purposes of this act, “emergency” means any condition constituting a clear and present danger to life or property; a situation caused by the escape of any substance transported by means of an underground facility; any interruption of vital public service or communication caused by any break or defect in a member operator’s underground facility; or, in the case of the State Highway System or streets or roads maintained by a political subdivision or underground facilities owned, operated, or maintained by a political subdivision, if the use of such highways, streets, roads, or underground facilities is, in the sole judgment of the Department of Highway Safety and Motor Vehicles, the Department of Transportation, or such political subdivision, impaired by an unforeseen occurrence that necessitates repair beginning immediately after such occurrence.

(2) An excavator shall not notify the system that there is an emergency unless the excavator reasonably believes that the intended excavation or demolition is due to a situation or condition as defined in subsection (1).

History. — s. 9, ch. 93-240; s. 4, ch. 96-172; s. 6, ch. 2010-100.

556.110 Costs assessed among member operators.

History. — s. 10, ch. 93-240; s. 7, ch. 97-306; s. 7, ch. 2010-100.

556.111 Applicability to existing law.

(1) Constitute the establishment or enlargement of any rights to the use of real property or create an interest therein for the placement, construction, repair, maintenance, relocation, or excavation or demolition of any underground facility;

(2) Waive any right of a party having an interest in real property to charge any fee for the use regarding such property; or

(3) Preempt a governmental member operator from reasonable regulation of its right-of-way. This subsection does not exempt a municipality, county, district, or other local governmental member operator from the provisions of this

chapter that apply to the member operator.

History. — s. 11, ch. 93-240; s. 9, ch. 2006-138.

556.112 Design services.

(1) Each member operator shall provide to the system annually, and shall thereafter keep current, the contact names and telephone numbers of individuals who may be contacted by design engineers, architects, surveyors, and planners for the purpose of responding to requests for design services.

(2) Each member operator shall provide to the system annually, and shall thereafter keep current, a list of fees applicable to each type of design service that each member operator chooses to offer to design engineers, architects, surveyors, and planners.

(3) Each member operator, within 20 business days after receipt of the fee provided for in subsection (2), shall either respond to a request for design services, if the member operator chooses to provide the services requested, or shall notify the party requesting services that the services will not be provided.

(4) This

section shall not apply to any state agency, municipality, or county, or contractors, consultants, agents, or persons or firms acting under their authority, in the planning, preparing, or performance of work in their right-of-way. This

section shall not limit or expand any existing law governing the process a state agency, municipality, or county uses to request design services from member operators or the responsibility for providing or paying for such services.

History. — s. 7, ch. 2002-234; s. 108, ch. 2005-2.

556.113 Sunshine State One-Call of Florida, Inc.; public records exemption.

(1) As used in this section, the term “proprietary confidential business information” means information provided by:

(2) Proprietary confidential business information held by Sunshine State One-Call of Florida, Inc., for the purpose of describing the extent and root cause of damage to an underground facility or using the member ticket management software system is exempt from s. 119.07(1) and s. 24(a), Art. I of the State Constitution.

History. — s. 1, ch. 2007-101; s. 1, ch. 2012-221.

556.114 Low-impact marking practices.

(1) An excavator providing notice under s. 556.105(1)(

a) shall identify in its notice only the area that will be excavated during the period that the information in such notice is considered valid under s. 556.105(1)(c).

(2) When an excavator has not completed an excavation noticed under s. 556.105(1)(

a) within the period that the information in the notice is considered valid under s. 556.105(1)(c), the excavator must provide a subsequent notice to the system under s. 556.105(1)(

a) to continue with the excavation, and such subsequent notice shall identify only the remaining area to be excavated.

(3) When an excavation site cannot be described in information provided under s. 556.105(1)(

a) with sufficient particularity to enable the member operator to ascertain the excavation site, and if the excavator and member operator have not mutually agreed otherwise, the excavator shall premark the proposed area of the excavation before a member operator is required to identify the horizontal route of its underground facilities in the proximity of any excavation. However, premarking is not required when the premarking could reasonably interfere with traffic or pedestrian control.

(4) A member operator shall identify the horizontal route of its underground facilities as set forth in s. 556.105(5)(

a) and (b), and excavators shall premark an excavation site as set forth in subsection (3) using flags or stakes or temporary, nonpermanent paint or other industry-accepted low-impact marking practices.

(5) Any horizontal route-identification marker must be in a color identified in the Uniform Color Code for Utilities.

(6) Sunshine State One-Call of Florida, Inc., shall establish an educational program for the purpose of informing excavators and member operators about low-impact marking practices.

History. — s. 8, ch. 2010-100.

556.115 Alternative dispute resolution.

(1) Sunshine State One-Call of Florida, Inc., shall create a voluntary alternative dispute resolution program. The program shall be available to all member operators, excavators, and other stakeholders, such as locators, utility service users, and governmental or quasi-governmental entities, for purposes of resolving disputes arising from excavation activities, including, but not limited to, loss of services, down time, delays, loss of use of facilities during restoration or replacement, and similar economic disruptions, exclusive of penalties imposed under other provisions of this act.

(2) The alternative dispute resolution program created by Sunshine State One-Call of Florida, Inc., shall include mediation, arbitration, or other appropriate processes, including the use of the services of the Division of Administrative Hearings.

(3) The costs of using the program shall be borne by the voluntary users, and the voluntary users shall choose the form of alternative dispute resolution to be used. If arbitration is used, the users shall decide whether the arbitration will be binding.

(4) Unless binding arbitration is the chosen method of alternative dispute resolution, the users or any one of such users may end the process at any time and exercise the right to proceed in a court of competent jurisdiction or before the Division of Administrative Hearings.

(5) This

section does not change the basis for civil liability for damages.

History. — s. 9, ch. 2010-100.

556.116 High-priority subsurface installations; special procedures.

(1) When an excavator proposes to excavate or demolish within 15 feet of the horizontal route of an underground facility that has been identified as a high-priority subsurface installation by the operator of the facility, the operator shall, in addition to identifying the horizontal route of its facility as set forth in s. 556.105(5)(

a) and (b), and within the time period set forth in s. 556.105(9)(

a) for a positive response, notify the excavator that the facility is a high-priority subsurface installation. If the member operator provides such timely notice of the existence of a high-priority subsurface installation, an excavator shall notify the operator of the planned excavation start date and time before beginning excavation. If the member operator does not provide timely notice, the excavator may proceed, after waiting the prescribed time period set forth in s. 556.105(9)(a), to excavate without notifying the member operator of the excavation start date and time. The exemptions stated in s. 556.108 apply to the notification requirements in this subsection.

(2)(

a) An alleged commission of an infraction listed in s. 556.107(1) which results in an incident must be reported to the system and the State Fire Marshal by a member operator or an excavator within 24 hours after learning of the alleged occurrence of an incident.

History. — s. 10, ch. 2010-100; s. 126, ch. 2013-18; s. 4, ch. 2020-137.

556.117 Underground facility damage prevention and enforcement review.

History. — s. 5, ch. 2020-137.

Document details

CollectionFlorida Statutes
CitationFla. Stat. ch. 556 (2025)
Typestatute
Languageen
Formathtml
SourceFL_STATUTES
Identifier2ab9de7d0c51e645665f33790188db22abe9404f

Source file is stored in the law ingest library (html).

Underground Facility Damage Prevention And Safety (2025) | CaseLite