70.001 Private property rights protection.
(1) This act may be cited as the “Bert J. Harris, Jr., Private Property Rights Protection Act.” The Legislature recognizes that some laws, regulations, and ordinances of the state and political entities in the state, as applied, may inordinately burden, restrict, or limit private property rights without amounting to a taking under the State Constitution or the United States Constitution. The Legislature determines that there is an important state interest in protecting the interests of private property owners from such inordinate burdens.
Therefore, it is the intent of the Legislature that, as a separate and distinct cause of action from the law of takings, the Legislature herein provides for relief, or payment of compensation, when a new law, rule, regulation, or ordinance of the state or a political entity in the state, as applied, unfairly affects real property.
(2) When a specific action of a governmental entity has inordinately burdened an existing use of real property or a vested right to a specific use of real property, the property owner of that real property is entitled to relief, which may include compensation for the actual loss to the fair market value of the real property caused by the action of government, as provided in this section.
(3) For purposes of this section:
(4)(
a) Not less than 150 days prior to filing an action under this
section against a governmental entity, a property owner who seeks compensation under this
section must present the claim in writing to the head of the governmental entity, except that if the property is classified as agricultural pursuant to s. 193.461, the notice period is 90 days. The property owner must submit, along with the claim, a bona fide, valid appraisal that supports the claim and demonstrates the loss in fair market value to the real property.
If the action of government is the culmination of a process that involves more than one governmental entity, or if a complete resolution of all relevant issues, in the view of the property owner or in the view of a governmental entity to whom a claim is presented, requires the active participation of more than one governmental entity, the property owner shall present the claim as provided in this
section to each of the governmental entities.
(5)(
a) During the 90-day-notice period or the 150-day-notice period, unless a settlement offer is accepted by the property owner, each of the governmental entities provided notice pursuant to paragraph (4)(
a) shall issue a written statement of allowable uses identifying the allowable uses to which the subject property may be put. The failure of the governmental entity to issue a statement of allowable uses during the applicable 90-day-notice period or 150-day-notice period shall be deemed a denial for purposes of allowing a property owner to file an action in the circuit court under this section. If a written statement of allowable uses is issued, it constitutes the last prerequisite to judicial review for the purposes of the judicial proceeding created by this section, notwithstanding the availability of other administrative remedies.
(6)(
a) The circuit court shall determine whether an existing use of the real property or a vested right to a specific use of the real property existed and, if so, whether, considering the settlement offer and statement of allowable uses, the governmental entity or entities have inordinately burdened the real property.
If the actions of more than one governmental entity, considering any settlement offers and statement of allowable uses, are responsible for the action that imposed the inordinate burden on the real property of the property owner, the court shall determine the percentage of responsibility each such governmental entity bears with respect to the inordinate burden. A governmental entity may take an interlocutory appeal of the court’s determination that the action of the governmental entity has resulted in an inordinate burden.
An interlocutory appeal does not automatically stay the proceedings; however, the court may stay the proceedings during the pendency of the interlocutory appeal. If the governmental entity does not prevail in the interlocutory appeal, the court shall award to the prevailing property owner the costs and a reasonable attorney fee incurred by the property owner in the interlocutory appeal.
(7)(
a) The circuit court may enter any orders necessary to effectuate the purposes of this
section and to make final determinations to effectuate relief available under this section.
(8) This
section does not supplant methods agreed to by the parties and lawfully available for arbitration, mediation, or other forms of alternative dispute resolution, and governmental entities are encouraged to utilize such methods to augment or facilitate the processes and actions contemplated by this section.
(9) This
section provides a cause of action for governmental actions that may not rise to the level of a taking under the State Constitution or the United States Constitution. This
section may not necessarily be construed under the case law regarding takings if the governmental action does not rise to the level of a taking. The provisions of this
section are cumulative, and do not abrogate any other remedy lawfully available, including any remedy lawfully available for governmental actions that rise to the level of a taking. However, a governmental entity shall not be liable for compensation for an action of a governmental entity applicable to, or for the loss in value to, a subject real property more than once.
(10)(
a) This
section does not apply to any actions taken by a governmental entity which relate to the operation, maintenance, or expansion of transportation facilities, and this
section does not affect existing law regarding eminent domain relating to transportation.
(11) A cause of action may not be commenced under this
section if the claim is presented more than 1 year after a law or regulation is first applied by the governmental entity to the property at issue.
(12) No cause of action exists under this
section as to the application of any law enacted on or before May 11, 1995, or as to the application of any rule, regulation, or ordinance adopted, or formally noticed for adoption, on or before that date. A subsequent amendment to any such law, rule, regulation, or ordinance gives rise to a cause of action under this
section only to the extent that the application of the amendatory language imposes an inordinate burden apart from the law, rule, regulation, or ordinance being amended.
(13) In accordance with s. 13, Art. X of the State Constitution, the state, for itself and for its agencies or political subdivisions, waives sovereign immunity for causes of action based upon the application of any law, regulation, or ordinance subject to this section, but only to the extent specified in this section.
History. — s. 1, ch. 95-181; s. 1, ch. 2006-255; s. 1, ch. 2011-191; s. 2, ch. 2012-94; s. 1, ch. 2015-142.
70.002 Property Owner Bill of Rights.
History. — s. 3, ch. 2019-155.
70.20 Balancing of interests.
(1) Municipalities, counties, and all other governmental entities are specifically empowered to enter into relocation and reconstruction agreements on whatever terms are agreeable to the sign owner and the municipality, county, or other governmental entity involved and to provide for relocation and reconstruction of signs by agreement, ordinance, or resolution. As used in this section, a “relocation and reconstruction agreement” means a consensual, contractual agreement between a sign owner and a municipality, county, or other governmental entity for either the reconstruction of an existing sign or the removal of a sign and construction of a new sign to substitute for the sign removed.
(2) Except as otherwise provided in this section, no municipality, county, or other governmental entity may remove, or cause to be removed, any lawfully erected sign located along any portion of the interstate, federal-aid primary or other highway system, or any other road without first paying just compensation for such removal as determined by agreement between the parties or through eminent domain proceedings.
Except as otherwise provided in this section, no municipality, county, or other governmental entity may cause in any way the alteration of any lawfully erected sign located along any portion of the interstate, federal-aid primary or other highway system, or any other road without first paying just compensation for such alteration as determined by agreement between the parties or through eminent domain proceedings. The provisions of this
section shall not apply to any ordinance the validity, constitutionality, and enforceability of which the owner has by written agreement waived all right to challenge.
(3) In the event that a municipality, county, or other governmental entity undertakes a public project or public goal requiring alteration or removal of any lawfully erected sign, the municipality, county, or other governmental entity shall notify the owner of the affected sign in writing of the public project or goal and of the intention of the municipality, county, or other governmental entity to seek such alteration or removal. Within 30 days after receipt of the notice, the owner of the sign and the municipality, county, or other governmental entity shall attempt to meet for purposes of negotiating and executing a relocation and reconstruction agreement as provided for in subsection (1).
(4) If the parties fail to enter into a relocation and reconstruction agreement within 120 days after the initial notification by the municipality, county, or other governmental entity, either party may request mandatory nonbinding arbitration to resolve the disagreements between the parties. Each party shall select an arbitrator, and the individuals so selected shall choose a third arbitrator.
The three arbitrators shall constitute the panel that shall arbitrate the dispute between the parties and, at the conclusion of the proceedings, shall present to the parties a proposed relocation and reconstruction agreement that the panel believes equitably balances the rights, interests, obligations, and reasonable expectations of the parties.
If the municipality, county, or other governmental entity and the sign owner accept the proposed relocation and reconstruction agreement, the municipality, county, or other governmental entity and the sign owner shall each pay its respective costs of arbitration and shall pay one-half of the costs of the arbitration panel, unless the parties otherwise agree.
(5) If the parties do not enter into a relocation and reconstruction agreement, the municipality, county, or other governmental entity may proceed with the public project or purpose and the alteration or removal of the sign only after first paying just compensation for such alteration or removal as determined by agreement between the parties or through eminent domain proceedings.
(6) The requirement by a municipality, county, or other governmental entity that a lawfully erected sign be removed or altered as a condition precedent to the issuance or continued effectiveness of a development order constitutes a compelled removal that is prohibited without prior payment of just compensation under subsection (2). This subsection shall not apply when the owner of the land on which the sign is located is seeking to have the property redesignated on the future land use map of the applicable comprehensive plan for exclusively single-family residential use.
(7) The requirement by a municipality, county, or other governmental entity that a lawfully erected sign be altered or removed from the premises upon which it is located incident to the voluntary acquisition of such property by a municipality, county, or other governmental entity constitutes a compelled removal that is prohibited without payment of just compensation under subsection (2).
(8) Nothing in this
section shall prevent a municipality, county, or other governmental entity from acquiring a lawfully erected sign through eminent domain or from prospectively regulating the placement, size, height, or other aspects of new signs within such entity’s jurisdiction, including the prohibition of new signs, unless otherwise authorized pursuant to this section. Nothing in this
section shall impair any ordinance or provision of any ordinance not inconsistent with this section, including a provision that creates a ban or partial ban on new signs, nor shall this
section create any new rights for any party other than the owner of a sign, the owner of the land upon which it is located, or a municipality, county, or other governmental entity as expressed in this section.
(9) This
section applies only to a lawfully erected sign the subject matter of which relates to premises other than the premises on which it is located or to merchandise, services, activities, or entertainment not sold, produced, manufactured, or furnished on the premises on which the sign is located.
(10) This
section shall not apply to any actions taken by the Department of Transportation that relate to the operation, maintenance, or expansion of transportation facilities, and this
section shall not affect existing law regarding eminent domain relating to the Department of Transportation.
(11) Nothing in this
section shall impair or affect any written agreement existing prior to the effective date of this act, including, but not limited to, any settlement agreements reliant upon the legality or enforceability of local ordinances. The provisions of this
section shall not apply to any signs that are required to be removed by a date certain in areas designated by local ordinance as view corridors if the local ordinance creating the view corridors was enacted in part to effectuate a consensual agreement between the local government and two or more sign owners prior to the effective date of this act, nor shall the provisions of this
section apply to any signs that are the subject of an ordinance providing an amortization period, which period has expired, and which ordinance is the subject of judicial proceedings that were commenced on or before January 1, 2001, nor shall this
section apply to any municipality with an ordinance that prohibits billboards and has two or fewer billboards located within its current boundaries or its future annexed properties.
(12) Subsection (6) shall not apply when the development order permits construction of a replacement sign that cannot be erected without the removal of the lawfully erected sign being replaced.
History. — s. 1, ch. 2002-13; s. 10, ch. 2005-2.
70.45 Governmental exactions.
(1) As used in this section, the term:
(2) In addition to other remedies available in law or equity, a property owner may bring an action in a court of competent jurisdiction under this
section to recover damages caused by a prohibited exaction. Such action may not be brought until a prohibited exaction is actually imposed or required in writing as a final condition of approval for the requested use of real property. The right to bring an action under this
section may not be waived. This
section does not apply to impact fees adopted under s. 163.31801 or non-ad valorem assessments as defined in s. 197.3632.
(3) At least 90 days before filing an action under this section, but no later than 180 days after imposition of the prohibited exaction, the property owner shall provide to the relevant governmental entity written notice of the proposed action. This written notice shall identify the exaction that the property owner believes is prohibited, briefly explain why the property owner believes the exaction is prohibited, and provide an estimate of the damages. Upon receipt of the written notice:
(4) For each claim filed under this section, the governmental entity has the burden of proving that the exaction has an essential nexus to a legitimate public purpose and is roughly proportionate to the impacts of the proposed use that the governmental entity is seeking to avoid, minimize, or mitigate. The property owner has the burden of proving damages that result from a prohibited exaction.
(5) The court may award attorney fees and costs to the prevailing party; however, if the court determines that the exaction which is the subject of the claim lacks an essential nexus to a legitimate public purpose, the court shall award attorney fees and costs to the property owner.
(6) To ensure that courts may assess damages for claims filed under this
section in accordance with s. 13, Art. X of the State Constitution, the state, for itself and its agencies or political subdivisions, waives sovereign immunity for causes of action based upon the application of this section. Such waiver is limited only to actions brought under this section.
(7) This
section applies to any prohibited exaction imposed or required in writing on or after October 1, 2015, as a final condition of approval for the requested use of real property.
History. — s. 2, ch. 2015-142.
70.51 Land use and environmental dispute resolution.
(1) This
section may be cited as the “Florida Land Use and Environmental Dispute Resolution Act.”
(2) As used in this section, the term:
(3) Any owner who believes that a development order, either separately or in conjunction with other development orders, or an enforcement action of a governmental entity, is unreasonable or unfairly burdens the use of the owner’s real property, may apply within 30 days after receipt of the order or notice of the governmental action for relief under this section.
(4) To initiate a proceeding under this section, an owner must file a request for relief with the elected or appointed head of the governmental entity that issued the development order or orders, or that initiated the enforcement action. The head of the governmental entity may not charge the owner for the request for relief and must forward the request for relief to the special magistrate who is mutually agreed upon by the owner and the governmental entity within 10 days after receipt of the request.
(5) The governmental entity with whom a request has been filed shall also serve a copy of the request for relief by United States mail or by hand delivery to:
(6) The request for relief must contain:
(7) The special magistrate may require other information in the interest of gaining a complete understanding of the request for relief.
(8) The special magistrate may conduct a hearing on whether the request for relief should be dismissed for failing to include the information required in subsection (6). If the special magistrate dismisses the case, the special magistrate shall allow the owner to amend the request and refile. Failure to file an adequate amended request within the time specified shall result in a dismissal with prejudice as to this proceeding.
(9) By requesting relief under this section, the owner consents to grant the special magistrate and the parties reasonable access to the real property with advance notice at a time and in a manner acceptable to the owner of the real property.
(10)(
a) Before initiating a special magistrate proceeding to review a local development order or local enforcement action, the owner must exhaust all nonjudicial local government administrative appeals if the appeals take no longer than 4 months. Once nonjudicial local administrative appeals are exhausted and the development order or enforcement action is final, or within 4 months after issuance of the development order or notice of the enforcement action if the owner has pursued local administrative appeals even if the appeals have not been concluded, the owner may initiate a proceeding under this section.
Initiation of a proceeding tolls the time for seeking judicial review of a local government development order or enforcement action until the special magistrate’s recommendation is acted upon by the local government. Election by the owner to file for judicial review of a local government development order or enforcement action prior to initiating a proceeding under this
section waives any right to a special magistrate proceeding.
(11) The initial party to the proceeding is the governmental entity that issues the development order to the owner or that is taking the enforcement action. In those instances when the development order or enforcement action is the culmination of a process involving more than one governmental entity or when a complete resolution of all relevant issues would require the active participation of more than one governmental entity, the special magistrate may, upon application of a party, join those governmental entities as parties to the proceeding if it will assist in effecting the purposes of this section, and those governmental entities so joined shall actively participate in the procedure.
(12) Within 21 days after receipt of the request for relief, any owner of land contiguous to the owner’s property and any substantially affected person who submitted oral or written testimony, sworn or unsworn, of a substantive nature which stated with particularity objections to or support for the development order or enforcement action at issue may request to participate in the proceeding. Those persons may be permitted to participate in the hearing but shall not be granted party or intervenor status.
The participation of such persons is limited to addressing issues raised regarding alternatives, variances, and other types of adjustment to the development order or enforcement action which may impact their substantial interests, including denial of the development order or application of an enforcement action.
(13) Each party must make efforts to assure that those persons qualified by training or experience necessary to address issues raised by the request or by the special magistrate and further qualified to address alternatives, variances, and other types of modifications to the development order or enforcement action are present at the hearing.
(14) The special magistrate may subpoena any nonparty witnesses in the state whom the special magistrate believes will aid in the disposition of the matter.
(15)(
a) The special magistrate shall hold a hearing within 45 days after his or her receipt of the request for relief unless a different date is agreed to by all the parties. The hearing must be held in the county in which the property is located.
(16)(
a) Fifteen days following the filing of a request for relief, the governmental entity that issued the development order or that is taking the enforcement action shall file a response to the request for relief with the special magistrate together with a copy to the owner. The response must set forth in reasonable detail the position of the governmental entity regarding the matters alleged by the owner. The response must include a brief statement explaining the public purpose of the regulations on which the development order or enforcement action is based.
(17) In all respects, the hearing must be informal and open to the public and does not require the use of an attorney. The hearing must operate at the direction and under the supervision of the special magistrate. The object of the hearing is to focus attention on the impact of the governmental action giving rise to the request for relief and to explore alternatives to the development order or enforcement action and other regulatory efforts by the governmental entities in order to recommend relief, when appropriate, to the owner.
(18) The circumstances to be examined in determining whether the development order or enforcement action, or the development order or enforcement action in conjunction with regulatory efforts of other governmental parties, is unreasonable or unfairly burdens use of the property may include, but are not limited to:
(19) Within 14 days after the conclusion of the hearing, the special magistrate shall prepare and file with all parties a written recommendation.
(20) The special magistrate’s recommendation is a public record under
chapter 119. However, actions or statements of all participants to the special magistrate proceeding are evidence of an offer to compromise and inadmissible in any proceeding, judicial or administrative.
(21) Within 45 days after receipt of the special magistrate’s recommendation, the governmental entity responsible for the development order or enforcement action and other governmental entities participating in the proceeding must consult among themselves and each governmental entity must:
(22) If a governmental entity accepts the special magistrate’s recommendation or modifies it and the owner rejects the acceptance or modification, or if a governmental entity rejects the special magistrate’s recommendation, the governmental entity must issue a written decision within 30 days that describes as specifically as possible the use or uses available to the subject real property.
(23) The procedure established by this
section may not continue longer than 165 days, unless the period is extended by agreement of the parties. A decision describing available uses constitutes the last prerequisite to judicial action and the matter is ripe or final for subsequent judicial proceedings unless the owner initiates a proceeding under ss. 120.569 and 120.57. If the owner brings a proceeding under ss. 120.569 and 120.57, the matter is ripe when the proceeding culminates in a final order whether further appeal is available or not.
(24) The procedure created by this
section is not itself, nor does it create, a judicial cause of action. Once the governmental entity acts on the special magistrate’s recommendation, the owner may elect to file suit in a court of competent jurisdiction. Invoking the procedures of this
section is not a condition precedent to filing a civil action.
(25) Regardless of the action the governmental entity takes on the special magistrate’s recommendation, a recommendation that the development order or enforcement action, or the development order or enforcement action in combination with other governmental regulatory actions, is unreasonable or unfairly burdens use of the owner’s real property may serve as an indication of sufficient hardship to support modification, variances, or special exceptions to the application of statutes, rules, regulations, or ordinances to the subject property.
(26) A special magistrate’s recommendation under this
section constitutes data in support of, and a support document for, a comprehensive plan or comprehensive plan amendment, but is not, in and of itself, dispositive of a determination of compliance with
chapter 163.
(27) The special magistrate shall send a copy of the recommendation in each case to the Department of Legal Affairs. Each governmental entity, within 15 days after its action on the special magistrate’s recommendation, shall notify the Department of Legal Affairs in writing as to what action the governmental entity took on the special magistrate’s recommendation.
(28) Each governmental entity may establish procedural guidelines to govern the conduct of proceedings authorized by this section, which must include, but are not limited to, payment of special magistrate fees and expenses, including the costs of providing notice and effecting service of the request for relief under this section, which shall be borne equally by the governmental entities and the owner.
(29) This
section shall be liberally construed to effect fully its obvious purposes and intent, and governmental entities shall direct all available resources and authorities to effect fully the obvious purposes and intent of this
section in resolving disputes. Governmental entities are encouraged to expedite notice and time-related provisions to implement resolution of disputes under this section. The procedure established by this
section may be used to resolve disputes in pending judicial proceedings, with the agreement of the parties to the judicial proceedings, and subject to the approval of the court in which the judicial proceedings are pending. The provisions of this
section are cumulative, and do not supplant other methods agreed to by the parties and lawfully available for arbitration, mediation, or other forms of alternative dispute resolution.
(30) This
section applies only to development orders issued, modified, or amended, or to enforcement actions issued, on or after October 1, 1995.
History. — s. 2, ch. 95-181; s. 7, ch. 96-410; s. 25, ch. 97-96; s. 58, ch. 2004-11; s. 1, ch. 2011-139.
70.80 Construction of ss. 70.001, 70.45, and 70.51.
History. — s. 3, ch. 95-181; s. 3, ch. 2015-142.